AZ BL COLO 7528(1) Burro Creek Road
Active
Contract Opportunity
Notice ID
6982AF27B000002
Related Notice
6982AF26SS0012
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Sep 15, 2026 07:59 am MDT
  • Original Response Date: Sep 30, 2026 02:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Oct 15, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Kingman , AZ 86401
    USA
Description

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE



Small Business Set-Aside



PROJECT NUMBER: AZ FLAP PIM FR510(1)



PROJECT NAME: Burro Creek Road



PROJECT DESCRIPTION:



Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.



SCOPE OF THE WORK:



The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:




  • Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.

  • Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.

  • Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns

  • Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.



The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.



PRINCIPAL WORK ITEMS:



Roadway Aggregate: 1,600 TONS



Ditch Reconditioning: 2,000 LNFT



Full Depth Reclamation: 1.3 MILE



Asphalt Concrete Pavement: 3,600 TON



18-Inch Pipe Culvert: 100 LNFT



24-Inch Pipe Culvert: 175 LNFT



Boulder: 100 EACH



ANTICIPATED SCHEDULE:



Advertisement – October 2026



Award-January - 2027



Construction – January 2027 through October 2027





ESTIMATED COST RANGE:



Between $2,000,000 and $5,000,000


Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Commodity Codes
  • FSC YConstruction of Structures and Facilities
  • NAICS 237310Highway, Street, and Bridge Construction
Related bids
Oct 15, 2026[Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Design-Build to Budget (DB2B)...

Follow Design-Build to Budget (DB2B) Tactical Unmanned Aerial Vehicle (TUAV) Hangar Active Contract

DEPT OF DEFENSE

Bid Due: 10/19/2026

West Douglas Utilities Expans...

Bid Number: RFP 2027 PW 004 Bid Title: West Douglas Utilities Expansion -

City of Douglas

Bid Due: 10/27/2026