2026 Sidewalk Replacement Program
Project Information
- Bid Title
- 2026 Sidewalk Replacement Program
- Issuing Agency
- Garden City city
- Location
- Michigan
- Published Date
- Mar 26, 2026
- Closing Date
- Apr 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-04-13-1000-2
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 2026-04-13-1000-2
Bid Title: 2026 Sidewalk Replacement Program
Category: Bid Postings Status: Open Description: INVITATION TO BID
GARDEN CITY, WAYNE COUNTY, MICHIGAN
2026 SIDEWALK REPLACEMENT PROGRAM
The one-year project consists of replacing deficient sidewalks throughout Garden City bounded by Ford, Venoy, Warren and Merriman (see attached map). The anticipated start date, weather
permitting, is May 11, 2026 and substantially completed by November 27, 2026.
SEALED BIDS will be accepted at the Office of the City Clerk, 6000 Middlebelt, Garden
City, MI 48135. Bid must be clearly labeled “2026 SIDEWALK REPLACEMENT PROGRAM”
Two (2) copies of the bid proposals shall be submitted to:
Bryan Smith, City Clerk
City of Garden City
6000 Middlebelt Road
Garden City, MI 48135
Deadline: 10:00 am (est) on Monday, April 13, 2026.
Bids shall be publicly opened and read.
All RFI’s shall be emailed to Nick Yuvan, PE, For security reasons, you must enable JavaScript to view this E-mail address. . (No calls)
The deadline for Request for Information (RFI) is Wednesday, April 8, 2026, 10 a.m. EST.
Contract Documents can be downloaded directly from BidNet.
The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 60 days after the date of bid opened.
The OWNER and ENGINEER will further assess the bids based on the following criteria.
1. COST EFFECTIVENESS
2. SIMILAR PAST PROJECT EXPERIENCE
3. ABILITY TO RESPOND PROMPTLY WHEN NEEDED
The following items are required for a complete bid submittal:
1. 5% Bid Bond
2. Completed Itemized Bid Sheet
3. Completed and Signed Exhibit ‘A’ Proposal
4. (2) Project References with similar scope
Publication Date/Time: 3/26/2026 5:00 PM Closing Date/Time: 4/13/2026 10:00 AM Submittal Information: Physical Bid Submission: Submit 2 copies of bid proposal in one sealed envelope Bid Opening Information: Monday, April 13, 2026 @ 10AM Contact Person: Nick Yuvan, Hennessey Engineers E-Mail: nryuvan@hengineers.com
Plan & Spec Available: Project specs can be found under Related Documents tab at top of posting. Special Requirements: The following items are required for a complete bid submittal: 1. 5% Bid Bond
2. Completed Itemized Bid Sheet
3. Completed and Signed Exhibit ‘A’ Proposal
4. (2) Project References with similar scope
Related Documents: - Attachment Preview
-
GARDEN CITY2026 SIDEWALK REPLACEMENT PROGRAMAdvertisementInstructions to BiddersGeneral Conditions of Construction ContractContract SpecificationsMayorMark JacobsCity ManagerTim GibbonsCity ClerkBryan SmithCouncilJeff Dold, Mayor Pro-TemKim DoldKaren HughesDominic KingStacy KarafotisZachary WittDirector of Public WorksBrad Ohman471211March 2026TABLE OF CONTENTSPART I - BIDDING REQUIREMENTSPAGE NO.Invitation to Bid ...................................................................................................................................... 4Site Map.................................................................................................................................................. 5Bid Sheet................................................................................................................................................. 6Instructions to Bidders ...................................................................................................................... 7-10Special Instructions to Bidders ........................................................................................................ 11-13Bid Bond .......................................................................................................................................... 14-15PART II - CONTRACT FORMSProposal EXHIBIT A ............................................................................................................................... 16Agreement ....................................................................................................................................... 17-20Exhibit B: Performance Bond..........................................................................................................21-22Exhibit C: Payment Bond ................................................................................................................ 23-24Exhibit D: Maintenance and Guarantee Bond................................................................................25-26Contractor's Affidavit for Current Estimate ......................................................................................... 27Contractor's Affidavit for Final Estimate .............................................................................................. 28Contractor’s Affidavit for Construction Materials................................................................................ 29Contractor’s Affidavit for Site Visit and Understanding ....................................................................... 30PART III - CONDITIONS OF THE CONTRACTArticle 1 — Definitions .................................................................................................................... 31-32Article 2 — Preliminary Matters........................................................................................................... 33Article 3 — Contract Documents: Intent and Reuse ........................................................................... 34Article 4 — Availability of Lands; Physical Conditions; Reference Points ............................................ 35Article 5 — Bonds and Insurance .................................................................................................... 36-39Article 6 — Contractor's Responsibility...........................................................................................40-45Article 7 — Work by Others.................................................................................................................. 46Article 8 — Owner's Responsibility ...................................................................................................... 47Article 9 — Engineer's Status During Construction ......................................................................... 47-48Article 10 — Changes in Work.............................................................................................................. 49Article 11 — Change of Contract Price ............................................................................................ 50-52Article 12 — Change of Contract Time ................................................................................................. 52Article 13 — Warranty and Guarantee: Tests and Inspections; Correction,..................................53-54Removal or Acceptance of WorkArticle 14 — Payments to Contractor and Completion...................................................................55-58Article 15 — Suspension of Work and Termination ........................................................................ 59-60Article 16 — Miscellaneous .................................................................................................................. 60Article 17 — Construction Follow Up ................................................................................................... 61PART IV - STANDARD NOTESGarden City Standard Notes ............................................................................................................ 62-66471212March 2026PART V – STANDARD SPECIFICATIONSTraffic Maintenance & Control............................................................................................................. 67Removing Drive Approaches ................................................................................................................ 68Removing Sidewalks ............................................................................................................................. 69Remove Existing Trees & Landscaping ................................................................................................. 69Aggregate Base (CIP) ............................................................................................................................ 70Adjusting Structures ............................................................................................................................. 71Concrete Drive Approach ................................................................................................................ 72-73Concrete Sidewalk ........................................................................................................................... 74-75Concrete ADA Ramp with Detectable Warning...............................................................................76-77Restoration ..................................................................................................................................... 78-81Sprinkler Repairs................................................................................................................................... 82Project Cleanup .................................................................................................................................... 82Utility Coordination .............................................................................................................................. 83PART V - METHODS AND MEASUREMENT OF PAYMENTMobilization.......................................................................................................................................... 84Traffic Maintenance & Control............................................................................................................. 84Removing Sidewalks / Ramps............................................................................................................... 85Removing Existing Trees & Landscaping .............................................................................................. 85Adjusting Structures ............................................................................................................................. 85Concrete Drive Approach ................................................................................................................ 85-86Concrete Sidewalk ................................................................................................................................ 867” Concrete ADA Sidewalk Ramp with Detectable Warning...........................................................86-87Restoration ........................................................................................................................................... 87Sprinkler Repairs................................................................................................................................... 87Project Cleanup .................................................................................................................................... 87PART VIII – DETAILSCONCRETE SIDEWALK CROSS SECTION ................................................................................................ 88DETAIL OF CROSS SLOPE TRANSITION.................................................................................................. 89DRIVE APPROACH JOINT LAYOUT DETAIL............................................................................................. 90DETAIL OF EXPANSION JOINT ............................................................................................................... 91DETAIL OF EXPANSION JOINT AT SERVICE SIDEWALKS ........................................................................ 92471213March 2026INVITATION TO BIDGARDEN CITY, WAYNE COUNTY, MICHIGAN2026 SIDEWALK REPLACEMENT PROGRAMThe one-year project consists of replacing deficient sidewalks throughout Garden City bounded byFord, Venoy, Warren and Merriman (see attached map). The anticipated start date, weatherpermitting, is May 11, 2026 and substantially completed by November 27, 2026.SEALED BIDS will be accepted at the Office of the City Clerk, 6000 Middlebelt, GardenCity, MI 48135. Bid must be clearly labeled “2026 SIDEWALK REPLACEMENT PROGRAM”Two (2) copies of the bid proposals shall be submitted to:Bryan Smith, City ClerkCity of Garden City6000 Middlebelt RoadGarden City, MI 48135Deadline: 10:00 am (est) on Monday, April 13, 2026.Bids shall be publicly opened and read.All RFI’s shall be emailed to Nick Yuvan, PE, nryuvan@hengineers.com. (No calls)The deadline for Request for Information (RFI) is Wednesday, April 8, 2026, 10 a.m. EST.Contract Documents can be downloaded directly from BidNet.The OWNER reserves the right to waive any information or to reject any and/or all bids. Biddersmay not withdraw their bid within 60 days after the date of bid opened.The OWNER and ENGINEER will further assess the bids based on the following criteria.1. COST EFFECTIVENESS2. SIMILAR PAST PROJECT EXPERIENCE3. ABILITY TO RESPOND PROMPTLY WHEN NEEDEDThe following items are required for a complete bid submittal:1. 5% Bid Bond2. Completed Itemized Bid Sheet3. Completed and Signed Exhibit ‘A’ Proposal4. (2) Project References with similar scopeCity of Garden CityBryan Smith, City Clerk471214March 2026BridgeCambridgeWindsorDoverMarcoMarcelloManor ParkRushJamesBridgeCambridgeWindsorDoverChesterMaplewoodBalmoralElmwoodBlockWarrenParkIndustrialBirchlawnBeechwoodKrauterPardoFordPardoJohn HaukDonnellyBockPierceHennepinBrownMarquetteBartonFlorenceAlvinKathrynAltaLeonaKathrynAlta VenoyCirBrownBrownBartonSheridanFlorenceKathrynAlvinKathrynLeonaCherry HillLeonaMarquetteRosslynPavillionRushRushJamesBridgeCambridgeWindsorDoverChesterBalmoralDawsonBeechwoodFordJohn HaukLeonaBalmoralBlockDawsonBirchlawnBeechwoodKrauterFordPardoBockDonnellyHennepinBrownMarquetteBartonSheridanRosslynFlorenceAlvinKathrynLytleWinterAlvinKathrynLeonaCherry HillChesterElmwood®2026 SIDEWALKSGARDEN CITYSTREET MAPSIDEWALK REPLACEMENT PROGRAM
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Site Improvements at St. Aubi...
Project: Site Improvements at St. Aubin, Belle Isle, and Baby Creek CSO Facilities
Great Lakes Water Authority
Bid Due: 7/07/2026
Description: Summer Renovations Project Department: Davison Community Schools Buyer: Rod Hoover Solicitation Number:
State of Michigan
Bid Due: 7/14/2026