Re-Bid Accelerated Lead Service Line Replacement Program – Contract 3.2 Addendum 2
Project Information
- Bid Title
- Re-Bid Accelerated Lead Service Line Replacement Program – Contract 3.2 Addendum 2
- Issuing Agency
- City of Providence
- Location
- Rhode Island
- Published Date
- Apr 14, 2026
- Closing Date
- Apr 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Re-Bid Accelerated Lead Service Line Replacement Program – Contract 3.2 Addendum 2
- Attachment Preview
-
Procurement #: 52577>CITY OF PROVIDENCE, RHODE ISLANDDepartment: Providence WaterRFP Title: Re-Bid Accelerated Lead Service Line Replacement Program-Contract 3.2Opening Date: 20 Apr 2026Addendum #: 2Issuing Date: 14 Apr 2026The purpose of this addendum is to provide additional information to bidders.Providence City Hall25 Dorrance StreetProvidence, RI 02903ADDENDUM NO. 2TO:FROM:ALL CONTRACT DOCUMENT HOLDERS OF RECORDALL PROSPECTIVE BIDDERSPROVIDENCE WATER125 DUPONT DRIVEPROVIDENCE, RHODE ISLAND 02907PHONE: (401) 521-6300DATE ISSUED:RE:BID OPENINGDATE:BID OPENINGLOCATION:TUESDAY, APRIL 14, 2026ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAM –RE-BID CONTRACT 3.2CONTRACT NO. 20234MONDAY, APRIL 20, 2026 AT 2:15 PMBOARD OF CONTRACT AND SUPPLY MEETINGCITY COUNCIL CHAMBERSPROVIDENCE CITY HALL25 DORRANCE STREETPROVIDENCE, RHODE ISLAND 02903LAST WRITTEN FRIDAY, APRIL 10, 2026QUESTIONS DUE:This Addendum No. 2, including all referenced attachments, modifies, amends, andsupplements designated parts of the Contract Documents to the above-referenced project andshall be part of the Contract Documents as provided in the “Instructions to Bidders” for theabove-referenced project.Acknowledge receipt of this Addendum by inserting its number and date on page 00 41 00 – 1of the Bid Form. Failure to do so may subject the Bidder to disqualification.The Contract Documents are hereby modified, amended, and supplemented as follows:Contract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAMRE-BID CONTRACT 3.2CONTRACT NO. 20234ADDENDUM NO. 2APRIL 14, 2026Page 2 of 4SPECIFICATIONS1. SPECIFICATION 00 41 00 – BID FORM: REMOVE Section 00 41 00 in its entirety andREPLACE with Attachment 1.2. SPECIFICATION 01014 – Construction Sequence and Schedule Requirements:ADD the following after Paragraph 1.08.A.8:“9. Owner shall provide direction, if applicable, to prioritize outreach and replacementson specific streets prior to proceeding to replacements in the remainder of the contractareas.”3. SPECIFICATION 01025 – MEASUREMENT AND PAYMENT:a. ADD the following new paragraph after Paragraph 3.12.C.2:“3.13 LIQUID ASPHALT PRICE ADJUSTMENT ALLOWANCE (ITEM S-6)A. General1. Liquid Asphalt Price Adjustment Allowance (Item S-6) will beutilized to account for fluctuating costs of liquid asphalt in BidItems 1G, 1H, 1I.2, and S-5B from the established base priceestablished herein.B. Measurement1. (Item S-6) Liquid Asphalt Price Adjustment Allowance - shallbe measured on a per ton basis for each month liquid asphalt ispurchased and price adjustment calculated as further describedbelow in the Payment section.C. Payment1. Payment for Item S-6 Liquid Asphalt Price AdjustmentAllowance shall be as follows – Price and payment will be madein the event the performance of the work, including change orders,requires liquid asphalt that differs from the Base Price which isestablished as $640.00 per ton. The liquid asphalt priceadjustment shall be calculated in accordance with the formula andrelevant instructions published in the most recent edition of theRhode Island Department of Transportation StandardContract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAMRE-BID CONTRACT 3.2CONTRACT NO. 20234ADDENDUM NO. 2APRIL 14, 2026Page 3 of 4Specifications for Road and Bridge Construction Section 938 PriceAdjustments. All invoices for payment shall be accompanied bythe calculation of the price adjustment including the Period Pricefor liquid asphalt for any one-month period following the Notice toProceed during which the Period Price increases or decreasesfrom the Base Price.4. SPECIFICATION 01300 – SUBMITTALS:a. ADD “asbestos pipe handling and safety measures,” to Paragraph 1.01.B.2.eimmediately after “types of hazards onsite,”.b. ADD “02663 Pipe Insulation” to the Preliminary Shop Drawing List - ConstructionMaterials in Paragraph 2.01.A.5. SPECIFICATION 02663 – WATER SERVICE CONNECTIONS: ADD the followingparagraph after Paragraph 2.11.D:“2.12 INSULATIONA. Insulation kits consisting of preformed rigid polyisocyanurate or polyurethane foamhalf-shells and 12-mil thick black polyethylene tape shall be used for field applicationof insulation for pipe, fittings, and joints. The polyethylene tape jacket shall have amodified butyl rubber adhesive to ensure positive adhesion to the foam insulationand shall be field applied with a minimum of ¾-inch overlap for one layer, or a 50%overlap for a two layer finished product.B. Insulation should only be used when services are installed with less than 4.5-feet ofcover and Engineer/Owner has approved the piping depth.”6. SPECIFICATION Appendix A – Contract Addresses: REMOVE Appendix A in itsentirety and REPLACE with Attachment 2.ATTACHMENTS1. Attachment 1: Section 00 41 00 Bid Form2. Attachment 2: Appendix A Contract AddressesContract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAMRE-BID CONTRACT 3.2CONTRACT NO. 20234ADDENDUM NO. 2APRIL 14, 2026Page 4 of 4WRITTEN QUESTIONS AND COMMENTS SUBMITTED1. QUESTION: The project deadline listed for questions in the specifications is 3/27 but itwasn’t advertised for bid until 3/25, see below. Is this a typo? Please advise.ANSWER: Refer to Addendum No. 1 for revised date.2. QUESTION: Also, two weeks is not a lot of time to prepare a bid of this size. Since usalong with two other bidders already bid the original project, can you please provide allbidders with an outline of what the differences are between the two bids please. This willsave all of us a lot of time in preparing this re-bid.ANSWER: It is the bidder's responsibility to fully examine the Contract Documentsthoroughly before submitting a bid.3. QUESTION: Also, can you please provide the bid unit pricing from the three bidders onthe original bid. I don’t recall ever seeing the bid tabulation from the original bid onFebruary 9, 2026.ANSWER: Bid packages opened during Board of Contract and Supply meetings arepublicly available on the City of Providence website.4. QUESTION: Is there a liquid asphalt escalation clause in this contract in accordancewith RIDOT standards? Given the volatility of the current oil market, it is a concern forGCs and paving contractors.ANSWER: Refer to this Addendum No. 2.5. QUESTION: Can an item be added for concrete sidewalk restoration by the SY? Thatwould help bidders to separate costs as right now the few bid items included in thesebids are a “catch all” for a large number of misc. work that is sometimes used andsometimes not used, but you have to carry it just in case.ANSWER: No, the concrete sidewalks will remain under the replacement bid items.-END OF ADDENDUM NO. 2-Contract No. 20234
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 541330Engineering Services
- NAICS 562910Remediation Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
WPS Professional Development ...
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 7/21/2026
O2X Human Performance Worksho...
Follow O2X Human Performance Workshops - IFLEX and AFLEX Active Contract Opportunity Notice
DEPT OF DEFENSE