MAISD Bid Requests
Project Information
- Bid Title
- MAISD Bid Requests
- Issuing Agency
- Muskegon Area Intermediate School District
- Location
- Michigan
- Published Date
- Nov 24, 2025
- Closing Date
- Dec 8, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
MAISD Bid Requests
- Attachment Preview
-
Muskegon Area ISDRequest for Proposals –Admin Training RoomSealed Proposals must be delivered to:Muskegon Area ISD630 Harvey StreetMuskegon, MI 49442ATTN: Technology Services231-767-7294PART 1 - GENERAL1.1 REQUEST FOR PROPOSALSA. Muskegon Area ISD is requesting proposals for an Admin TrainingCenter/Room (“RFP”). Bidders shall provide, install, configure, test and commission afully operational Admin Training Room with a technology package suitable for bothonsite and hybrid engagement.B. A complete list of the buildings (“Sites”) is provided in the schedule of values atthe end of this document1.2 Due on or before 12:00 PM (local time) on December 8, 2025 (“Due Date”), the Ownerwill receive bid proposals for the project. The Owner will not consider or accept a bidproposal received after the due date for bid proposal submission. All bid proposals receivedafter the due date will be returned by making them available to the respective Bidder,unopened, for said Bidder to pick-up at their sole cost and expense. Bid proposals shall besubmitted to:1.3 PROPOSALS/QUOTESMuskegon Area ISD630 Harvey StreetMuskegon, MI 49442ATTN: Technology Services231-767-7294A. One (1) “hard” copy and one (1) “soft” (electronic) copy on a USB “flash” driveof the proposals are to be submitted in sealed packaging, clearly marked: “AdminTraining Room” for school district and shall be identified with the Bidder’s name andaddress and the date and time of the bid proposal opening. The Owner is notresponsible for any postal or delivery delays. No email, facsimile or other electronic bidproposals will be accepted.B. Bid Opening will happen at the MAISD Administration Building at 630 HarveyStreet, Muskegon MI 49442 at 1:00 PM on December 8,20251.4 Proposal FormatA. The bid response shall be structured as follows:1Section 1 – Submittal Letter and Executive Summary2Section 2 – Pricing Sheet3Section 3 – Narratives, System Description, Information, and Brochures4Section 4 – Bidder References1.5 Withdrawal of Bid Proposals/QuotesA. All bid proposals submitted shall not be withdrawn and shall be irrevocable for aminimum period of sixty (60) calendar days following the due date for receipt of bidproposals set forth above.1.6 Request for ClarificationA. Bidders may request that the school district clarify information contained in thisRFP. All such requests must be made in writing via email to Jeff Fielstra, MuskegonArea ISD, at jfielstra@muskegonisd.org1.7 Schedule of ValuesQDescriptiontyCisco Room Kit EQ, Quad Cam, First Light1Power Cord for United States of America 2m 10A2Cisco Room Navigator Wall Mount, First Light (White)1Cable Cover for Quad Camera1Cisco Room Vision PTZ Camera, Arctic White1Wall Bracket E RoomVision PTZCam - Arctic White1Cisco Ceiling Microphone Pro, Arctic White3Drop Ceiling Grid Mounting Kit for Ceiling Microphone Pro3Rack ears for the Codec EQ - for mounting in rack1SNTC-8X5XNBD SNTC-8X5XNBD Room Ki1SNTC-8X5XNBD Cisco Room Vision PTZ Camera, Arctic Whi1SNTC-8X5XNBD Cisco Ceiling Microphone Pro, Arctic Whi3EX4100 48-Port 10/100/1000BaseT PoE+, 4x 10G SFP+ Uplink ports, 4x 25G SFP28Stacking/Uplink ports, redundant fans, 1 AC PSU JPSU-920-AC-AFO included13 Year Wired Assurance & Virtual Network Assistant (VNA) subscription for EX-48 portswitches including JTAC Support1EX4100 and EX3400 920W AC Power Supply, Front-to-Back airflow1Vertiv 3000VA UPS - GXT5-3000LVRT2UXL1Vertiv Network Management Card for GTX5 series UPS - RDU101186IN LCD TV 3840X2160 UHD MNTR NON-WIFI 3YR WARR TV HDMI SPKR275IN LCD TV 3840X2160 UHD MNTR NON-WIFI 3YR WARR TV HDMI SPKR1CONNEXSYS VIDEO WALL SYSTEM WITH RAILS318U/24"DEEP,CONFIGURED RK1Extender, HDMI + USB-C, 4K, Tx-WP+ Rx-Box1Extender Set, HDMI 4K, 18G w/Local Loop Out3Standard HDMI Cable, 4K, 18G, 6ft6Standard HDMI Cable, 4K, 18G, 3ft6Premium HDMI Cable, 4K, 18G, 15ft1Project Pack: RemoteCam8Extension Kit + RC-CUBBY-CQC1Saros 4 2-Way In-Ceiling Speaker, White Textured, Single (must be ordered in multiples of 2) 4X-Series Amplifier, 300 W1(2) RCA Female to (1) 3.5MM Male Cable, 6 Inch1RCA Stereo Audio Cable, Male to Male, 3ft1RCA Stereo Audio Cable, Male to Male, 6ft11.8 Scope/Clarification of WorkA. Install locations.a. ESC South Buildingb. All structural low voltage cabling required to complete installation (18/2speaker cable, and Cat6 with required male terminations).B. Install and configure new network switch in nearest network closet rackC. Install Vertiv GTX5 UPS in rack and interconnect power to all new network and AVequipmentD. Register Codec EQ and all associated Cisco hardware components to control hubE. Assist MAISD with resource account creation for room scheduling and OBTPmeeting joinF. Configure Solution integration to operate with all of the following: Zoom Meetings,Google Meet, Microsoft Teams, and Cisco WebexG. Calibrate Cisco microphone in room for optimal audio pickupH. Configure Presenter TrackI. Complete testing and acceptance tasks to ensure implementation of a fullyfunctional room solution was successful.J. Switches must be able to stack with existing Juniper network switches.K. Vendors should assume there is adequate rack space for the new switches to beadded however there may need to be some reorganization to properly stack them.AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACTMichigan Public Act No. 517 of 2012The undersigned, the owner or authorized officer of the below-named contractor (the“Contractor”), pursuant to the compliance certification requirement provided in the______________________ (the “School District”) Request For Proposals For_____________________________ (the “RFP”), hereby certifies, represents and warrants thatthe Contractor (including its officers, directors and employees) is not an “Iran linked business”within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012(the “Act”), and that in the event Contractor is awarded a contract as a result of theaforementioned RFP, the Contractor will not become an “Iran linked business” at any time duringthe course of performing any services under the contract. The Contractor further acknowledgesthat any person who is found to have submitted a false certification is responsible for a civilpenalty of not more than $250,000.00 or 2 times the amount of the contract or proposedcontract for which the false certification was made, whichever is greater, the cost of the SchoolDistrict’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, anyperson who submitted a false certification shall be ineligible to bid on a request for proposal forthree (3) years from the date that it is determined that the person has submitted the falsecertification.CONTRACTOR:___________________________Name of ContractorBy:Its:Date:STATE OF ____________ )COUNTY OF ____________ )This instrument was acknowledged before me on the _____ day of ____________, 2025,by__________________________.____________________________________, Notary Public______________ County, __________My Commission Expires:___________Acting in the County of :___________
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Release Date Project with Bid Documentation Mandatory Pre-Bid Site Visit Bid Due Date
Oakland University
Bid Due: 7/08/2026
FORM 5550 #10 FF WINDOW COLLE...
Description: FORM 5550 #10 FF WINDOW COLLECTIONS ENVELOPE Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/17/2026