Bid 2526-28 Summit Lakes Storm Sewer Replacement Project
Project Information
- Bid Title
- Bid 2526-28 Summit Lakes Storm Sewer Replacement Project
- Issuing Agency
- City of Norman
- Location
- Oklahoma
- Published Date
- Mar 2, 2026
- Closing Date
- Mar 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid 2526-28 Summit Lakes Storm Sewer Replacement Project
NOTICE TO BIDDERS
CITY OF NORMAN
INVITATION TO BID NUMBER 2526-28
SUMMIT LAKES STORM SEWER REPLACEMENT
Notice is hereby given that pursuant to an order by the CITY OF NORMAN (OWNER), a municipal corporation, sealed bids will be received at the Office of the Purchasing Officer, 225 North Webster Avenue, Norman, OK 73069, until 2:00 p.m., local time, Thursday, the 26th day of March, 2026, for and on behalf of the CITY OF NORMAN, for furnishing all tools, material and labor, and performing the work necessary for construction of the SUMMIT LAKES STORM SEWER REPLACEMENT. Bids will be opened and read aloud at the Office of the Purchasing Officer, 225 North Webster Avenue, Norman, OK 73069 at 2:00 p.m. No bids will be accepted after 2:00 p.m.
A non-mandatory Pre-bid Conference will be held on Friday, March 6, 2026 @ 11:00 am at Conference Room B, located at 225 N. Webster Avenue, Norman, Oklahoma 73069. Questions related to this contract will be answered up to Friday, March 13, 2026 by 4:00 pm. Bidders are expected to inspect the sites of the work and to inform themselves regarding all local conditions. For information concerning the proposed work, or the scheduled Pre-bid Conference, contact Brandon Brooks, P.E., CFM, Capital Projects Engineer for OWNER, at brandon.brooks@normanok.gov .
REMOVAL AND REPLACEMENT OF 300 L.F. STORM SEWER LINE IN THE SUMMIT LAKES ADDITION OFF OF E. ALAMEDA STREET
Specifications and the other bidding documents are available for public inspection at the following location:
- Engineering Division, Mr. Brandon Brooks, P.E., CFM, 225 N. Webster Ave, Norman, OK 73069, brandon.brooks@normanok.gov
Bid information, plans, specifications, and any addenda may be obtained from:
- Office of the City Engineer located at 225 N. Webster Ave, Norman, Oklahoma.
- City of Norman website: https://www.normanok.gov/businesses/bids-rfps-rfqs
Each Bid must be accompanied by an original executed Bidding Documents contained within the Contract Documents and a Certified or Cashier’s Check or Bidder’s Surety Bond, in the sum of five percent (5%) of the amount of the total bid. Said Surety Bond will be retained as liquidated damages in the event the successful bidder fails, neglects, or refuses to enter into said contract for the construction of said public improvements for said project, and furnish the necessary Performance, Statutory, and Maintenance Bonds within ten (10) days from and after the date the award is made. All addenda issued will be posted to https://www.normanok.gov/businesses/bids-rfps-rfqs a minimum of 48 hours prior to bid opening.
- Attachment Preview
-
SPECIFICATIONSANDCONTRACT DOCUMENTSFOR THESUMMIT LAKES STORM SEWER REPLACEMENTContract No. – K-2526-143Maintenance Bond No. – MB-2526-40Performance Bond – B-2526-49Statutory Bond – B-2526-50Project Agent Resolution – R-2526-99Bid No. – 2526-28CITY OF NORMAN225 N. WEBSTERNORMAN, OKLAHOMA 73069(405) 366-54521TABLE OF CONTENTSSPECIFICATIONSANDCONTRACT DOCUMENTSCONTRACT DOCUMENTS ...........................................................................................................................1NOTICE TO BIDDERS ...................................................................................................................................5INSTRUCTIONS TO BIDDERS .....................................................................................................................6QUALIFICATION STATEMENT OF BIDDERS ........................................................................................8QUALIFICATION STATEMENT OF BIDDER’S SURETY ....................................................................12BID PROPOSAL.............................................................................................................................................13PAY ITEM NOTES (BASE BID) ..................................................................................................................16GENERAL CONSTRUCTION NOTES (BASE BID).................................................................................16SPECIAL PROVISIONS................................................................................................................................18100 SPECIAL PROVISIONS.....................................................................................................................18101 PRE-CONSTRUCTION CONFERENCE .........................................................................................18102 TAX STATUS.......................................................................................................................................18103 MATERIAL SPECIFICATIONS.......................................................................................................18103.1 Compacted Fill...............................................................................................................................18104 TESTING ..............................................................................................................................................18105 SOLID SLAB SODDING ....................................................................................................................18SPECIAL PROVISIONS................................................................................................................................19HIGH PERFORMANCE (HP) STORM PIPE -- ADS............................................................................19200 DESCRIPTION ....................................................................................................................................19201 MATERIALS........................................................................................................................................19202 INSTALLATION .................................................................................................................................19203 FIELD QUALITY CONTROL...........................................................................................................19204 ACCEPTANCE ....................................................................................................................................19SPECIAL PROVISIONS................................................................................................................................206-FOOT TALL CASON CEDAR PRIVACY FENCE WITH STEEL POSTS ....................................20300 DESCRIPTION ....................................................................................................................................20301 MATERIALS........................................................................................................................................20301.1 Cedar Fence Boards (Pickets) ......................................................................................................20301.2 Rails (Stringers).............................................................................................................................20301.3 Steel Posts.......................................................................................................................................20301.4 Fasteners ........................................................................................................................................202301.5 Concrete Footings..........................................................................................................................20302 CONSTRUCTION REQUIREMENTS .............................................................................................20302.1 Installation .....................................................................................................................................21302.2 Workmanship ................................................................................................................................21303 MEASUREMENT................................................................................................................................21304 PAYMENT............................................................................................................................................21SPECIAL PROVISIONS................................................................................................................................2230-INCH NYLOPLAST BASIN WITH STEEL BAR METAL ACCESS GRATE (MAG) ................22400 DESCRIPTION ....................................................................................................................................22401 MATERIALS........................................................................................................................................22401.1 Nyloplast Basin ..............................................................................................................................22401.2 Access Grate...................................................................................................................................22401.3 Appurtenances...............................................................................................................................22402 CONSTRUCTION REQUIREMENTS .............................................................................................22402.1 General ...........................................................................................................................................22402.2 Installation .....................................................................................................................................22402.3 Final Adjustment...........................................................................................................................22403 MEASUREMENT AND PAYMENT .................................................................................................23SPECIAL PROVISIONS................................................................................................................................2424-INCH ADS INSERTA TEE DROP INLET WITH ROAD & HIGHWAY GRATE.......................24500 DESCRIPTION ....................................................................................................................................24501 MATERIALS........................................................................................................................................24501.1 Inserta Tee Drop Inlet...................................................................................................................24501.2 Road and Highway Grate .............................................................................................................24501.3 Appurtenances...............................................................................................................................24502 CONSTRUCTION REQUIREMENTS .............................................................................................24502.1 General ...........................................................................................................................................24502.2 Installation .....................................................................................................................................24502.3 Final Placement .............................................................................................................................24503 MEASUREMENT AND PAYMENT .................................................................................................25SPECIAL PROVISIONS................................................................................................................................264-FOOT RESIDENTIAL ALUMINUM FENCING ................................................................................26600 DESCRIPTION ....................................................................................................................................26601 MATERIALS........................................................................................................................................26601.1 Product Submittal .........................................................................................................................26602 CONSTRUCTION REQUIREMENTS .............................................................................................263603 MEASUREMENT AND PAYMENT .................................................................................................26BID AFFIDAVITS ..........................................................................................................................................27CERTIFICATE OF NONDISCRIMINATION ...........................................................................................29“FALSE INFORMATION AFFIDAVIT” ....................................................................................................30C O N T R A C T.............................................................................................................................................31CONTRACT AFFIDAVIT.............................................................................................................................35M A I N T E N A N C E B O N D.................................................................................................................36P E R F O R M A N C E B O N D................................................................................................................39S T A T U T O R Y B O N D ........................................................................................................................42A F F I D A V I T ........................................................................................................................................454NOTICE TO BIDDERSCITY OF NORMANINVITATION TO BID NUMBER 2526-28SUMMIT LAKES STORM SEWER REPLACEMENTNotice is hereby given that pursuant to an order by the CITY OF NORMAN (OWNER), a municipalcorporation, sealed bids will be received at the Office of the Purchasing Officer, 225 North Webster Avenue,Norman, OK 73069, until 2:00 p.m., local time, Thursday, the 26th day of March, 2026, for and on behalfof the CITY OF NORMAN, for furnishing all tools, material and labor, and performing the work necessary forconstruction of the SUMMIT LAKES STORM SEWER REPLACEMENT. Bids will be opened and readaloud at the Office of the Purchasing Officer, 225 North Webster Avenue, Norman, OK 73069 at 2:00p.m. No bids will be accepted after 2:00 p.m.A non-mandatory Pre-bid Conference will be held on Friday, March 6, 2026 @ 11:00 am at ConferenceRoom B, located at 225 N. Webster Avenue, Norman, Oklahoma 73069. Questions related to this contract willbe answered up to Friday, March 13, 2026 by 4:00 pm. Bidders are expected to inspect the sites of the workand to inform themselves regarding all local conditions. For information concerning the proposed work, or thescheduled Pre-bid Conference, contact Brandon Brooks, P.E., CFM, Capital Projects Engineer for OWNER, atbrandon.brooks@normanok.gov.REMOVAL AND REPLACEMENT OF 300 L.F. STORM SEWER LINE IN THE SUMMIT LAKESADDITION OFF OF E. ALAMEDA STREETSpecifications and the other bidding documents are available for public inspection at the following location:1. Engineering Division, Mr. Brandon Brooks, P.E., CFM, 225 N. Webster Ave, Norman, OK 73069,brandon.brooks@normanok.govBid information, plans, specifications, and any addenda may be obtained from:1. Office of the City Engineer located at 225 N. Webster Ave, Norman, Oklahoma.2. City of Norman website: https://www.normanok.gov/businesses/bids-rfps-rfqsEach Bid must be accompanied by an original executed Bidding Documents contained within the ContractDocuments and a Certified or Cashier’s Check or Bidder’s Surety Bond, in the sum of five percent (5%) of theamount of the total bid. Said Surety Bond will be retained as liquidated damages in the event the successfulbidder fails, neglects, or refuses to enter into said contract for the construction of said public improvements forsaid project, and furnish the necessary Performance, Statutory, and Maintenance Bonds within ten (10) daysfrom and after the date the award is made. All addenda issued will be posted tohttps://www.normanok.gov/businesses/bids-rfps-rfqs a minimum of 48 hours prior to bid opening.5
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Williams Tower I 4th Floor Bu...
Procurement #164694 Title Williams Tower I 4th Floor Buildout Status Cancelled OpenDate 06/18/2026
Cherokee Nation
Bid Due: 7/17/2026
Radio Road Turn Lane Street I...
Bid Title: Radio Road Turn Lane Street Improvement Project Category: City Clerk's Office
Durant city
Bid Due: 7/16/2026