Morad Well Field Out Building, Project No. 25-055
Project Information
- Bid Title
- Morad Well Field Out Building, Project No. 25-055
- Issuing Agency
- City of Casper
- Location
- Wyoming
- Published Date
- May 11, 2026
- Closing Date
- May 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Morad Well Field Out Building, Project No. 25-055
Addendum 1 (5/11/26) ~ Emily Bennett
April 29, 2026
8:00
AM
May 27, 2026
4:00
PM
- Attachment Preview
-
ADDENDUM NO. 1to theREQUEST FOR PROPOSALSENGINEERING SERVICES FOR THEMORAD WELL FIELD OUT BUILDING, PROJECT NO. 25-055FOR THE CITY OF CASPER PUBLIC SERVICES DEPARTMENTCITY ENGINEERING DIVISIONRFP DATE: April 29, 2026ADDENDUM DATE: May 11, 2026APPROVED: (CITY OF CASPER)Emily BennettEngineer I, E.I.T.ACKNOWLEDGMENT OF RECEIPT OFADDENDUM (BIDDER)_________________________________Firm__________________________________By: Signature__________________________________Title__________________________________Date ReceivedAddendum 1, Page 1 of 4ADDENDUM NO. 1to theREQUEST FOR PROPOSALSENGINEERING SERVICES FOR THEMORAD WELL FIELD OUT BUILDING, PROJECT NO. 25-055FOR THE CITY OF CASPER PUBLIC SERVICES DEPARTMENTCITY ENGINEERING DIVISIONRFP DATE: April 29, 2026ADDENDUM DATE: May 11, 2026This addendum to the request for proposals is hereby made a part of the Contract Documents for the abovetitled project, to the same extent as though it were originally contained therein.All bidders are expected to thoroughly examine each item enumerated herein, regardless of its apparentapplication and shall be responsible for furnishing all labor and materials required in the division of workthat the items indicate.CONTRACT DOCUMENTS• In the TIMETABLE section of the RFP, on page 10, directly above the first bullet point whichstates “Proposal Due: May 27, 2026,”: ADD:“Pre-Proposal walkthrough meeting at the Casper Water Treatment Plant: May 21 at 2 pm”• In the TIMETABLE section of the RFP, on page 10, bullet point 3. Award of Contract,REPLACE “Award of Contract: June 23, 2026” with:“Award of Contract to selected Consultant by the Central Wyoming Regional Water SystemJoint Powers Board: July 21, 2026• In the TIMETABLE section of the RFP, on page 10, bullet point 4. Completion of Design,REPLACE “July 30, 2026” with:“September 30, 2026”Addendum 1, Page 2 of 4QUESTIONS AND ANSWERSThe following questions were asked by consultants and are summarized here with the answers givenby the City. This information is being provided to clarify the scope and details of the project.Proposed Schedule and TimelineQuestion: The five-week timeline given for design completion seems short. Could this timeline beextended?Answer: The award date has been changed to July 21, 2026, and the design completion deadline hasbeen moved to September 30, 2026. This gives approximately 10 weeks for the design to becompleted.PEMB Designated DesignQuestion: Will the project’s pre-engineered metal building (PEMB) be designated as delegated designwith the final frame and building framing system designed by a PEMB manufacturer, or is the PEMBdesign and girt framing system to be included in the construction document set provided by theConsultant?Answer: The PEMB is to be designated as a delegated design. The Consultant will not be required toprovide the PEMB design or design for the girt framing system. The Consultant will be required toprovide a design for the foundation and building which provides enough detail for the PEMBmanufacturer to provide a finished design, and the Consultant will be required to provide a designwhich, after delegated design by the PEMB manufacturer, can be fully constructed.Scope Clarification for Consultant ServicesQuestion: Will the Consultant be required to provide a full set of architectural drawings (includingdoor and window details, elevations, roof plan, building frame details, etc.)?Answer: The Consultant will not be required to provide a full set of architectural drawings. Thedrawings are to be finalized to the extent that a delegated design can be obtained from themanufacturer of the PEMB.Power Requirements (insulation, lighting, heating/cooling)Question: What are the building’s power needs? Will power need to be provided for the crane,lighting, miscellaneous outlets, and heating? Will cooling be required? Will there be any need forhigher output outlets to accommodate specialty tools and equipment? (e.g., welder)? Is this facilityplanned to be an all-season structure, meaning it needs insulation and lighting, heating, and/or cooling?Answer: Power will be supplied to the building for the crane, lighting, miscellaneous outlets, and theoverhead doors. There will be no heating or cooling in the building. Currently, there is no planned needfor higher output outlets. The City is working with Rocky Mountain Power to provide an electricalhookup for the building. The building will be used all season; there will be lighting, there will not beany heating or cooling, there will be insulation. The Rocky Mountain Power Work Order Number is7512105.Addendum 1, Page 3 of 4PlumbingQuestion: Will the building have any plumbing requirements for sinks or a bathroom?Answer: The building will not have any plumbing, and there will no amenities such as a bathroom,sink, eye wash station, etc.HVACQuestion: Can you please describe the nature of the HVAC system that is anticipated?Answer: No HVAC system is anticipated.Trench DrainsQuestion: Is there a need for any trench drains within the building?Answer: It is not anticipated that trench drains will be needed.Floor FinishQuestion: What is the desired floor finish? Is this a concrete slab or a gravel floor?Answer: Concrete slab floor finish is desired.Surveying or Mapping ServicesQuestion: Will topographic surveying/mapping services be required?Answer: It is likely that some surveying/mapping services will be required in order to providecoordinates for the geotechnical work and the details for any necessary design elevations.Cost EstimatesQuestion: At what levels of design will cost estimates need to be delivered?Answer: An initial cost estimate will be required at about 30% design, and a more finalized costestimate will be required at about 90% design for this project.END OF ADDENDUM NO. 1Addendum 1, Page 4 of 4REQUEST FOR PROPOSALSENGINEERING SERVICES FOR THEMORAD WELL FIELD OUT BUILDINGFOR THE CITY OF CASPER PUBLIC SERVICES DEPARTMENTCITY ENGINEERING DIVISIONDate: April 29, 2026Proposals are being requested from qualified engineering consultants to furnish design services forthe construction of a well field out building at the City of Casper Morad Well Field. The intent ofthe building is to provide a storage area for pumps and also to provide a work space. Theconstruction of the Well Field Out Building will improve longevity and serviceability of the pumps.Such proposals will be received by the City of Casper Public Services Department,City Engineering Division, 200 North David, Casper, Wyoming, until 4:00 p.m., Local time,May 27, 2026.PROJECT DESCRIPTIONThe City of Casper (“City”) would like to request proposals for structural design, constructionrecommendations, and total project cost estimation for a pre-engineered metal building. Thisbuilding is for the City’s Water Treatment/Distribution Morad Well Field. This building is toserve as both a storage space for pumps used in the well field and as a workshop. The pumps areas long as 40 feet and weigh up to 2 tons. The building will have overhead doors on both ends sothat a truck and trailer carrying the pumps will be able to pull through the building. A crane orhoist will be needed to unload the pumps and place them on storage racks. Attached for referenceis a conceptual floor plan layout with a proposed location for the building.FUNDINGThe funds for this project come from the Water Distribution Service, and $400,000.00 areavailable for the Morad Well Field Out Building design, procurement, and construction.City of Casper – Morad Well Field Out BuildingPage 1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Fleet Maintenance Mechanic Sh...
Project ID: Title: Fleet Maintenance Mechanic Shop Design Addenda: 1 Release Date: 5/27/2026
City of Cheyenne
Bid Due: 7/07/2026
Fleet Maintenance Mechanic Sh...
Project ID: Title: Fleet Maintenance Mechanic Shop Design Addenda: 1 Release Date: 5/27/2026
City of Cheyenne
Bid Due: 7/07/2026