REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
Project Information
- Bid Title
- REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
- Issuing Agency
- Brownsburg town
- Location
- Indiana
- Published Date
- Aug 5, 2025
- Closing Date
- Sep 10, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
Category: Capital Projects Status: Open Description: The Town of Brownsburg (TOB) is seeking turn-key professional Engineering services necessary for improvements along the North Green Street Corridor.
Earlier this year, First Group Engineering performed a traffic impact analysis of the corridor. The results of this study are attached for reference purposes only. The finalized recommended improvements approach is as follows:
“Alternative 2: Traffic Warrants + Additional Lane Improvements. This improvement was found to have the lowest overall delay and the second lowest cost. It should be noted that the intersections of Green St and the I-74 ramps fall under INDOT jurisdiction and thus any improvements to these intersections will require coordination with the INDOT Crawfordsville District.
The existing traffic signals along Green Street operate as part of a coordinated system. Any proposed signal installations in this study are intended to integrate with that system to support efficient corridor-wide traffic flow and minimize delay during peak periods. This coordinated system will help closely spaced signalized intersections operate in a way to avoid traffic queues from one signalized intersection backing up into another signalized intersection.”
The agreed upon final intersection improvements are below:
-
Green St & Loraine Dr
- Traffic Signal
-
Green St & Kroger Entrance
- Right In – Right Out Intersection, Restricted Left Turn
-
Green St & Northfield Dr
- Westbound Thru Lane
-
Green St & WB Ramps to I-74
- Change the Eastbound Thru Lane to an Eastbound Left Thru Lane
-
Green St & Maplehurst Dr
- Traffic Signal
-
Green St & Whittington Dr
- Right In – Right Out Intersection, Northbound Right Turn Lane
Publication Date/Time: 8/5/2025 8:00 AM Closing Date/Time: 9/10/2025 2:00 PM Submittal Information: Proposal shall be electronically submitted by 2:00 PM on 9/10/25 Contact Person: RFP questions shall be submitted via email only. Response to questions shall
be distributed by addendum via email only. Emails shall be submitted to as
follows:
Sarah Craft sarah@kramercorporation.com
Shawn Pabst spabst@brownsburg.org
Aaron Kaytar akaytar@brownsburg.orgRelated Documents: -
Green St & Loraine Dr
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
W912QR26BA008 - Construction ...
Follow W912QR26BA008 - Construction of TMAC at NSWC - Crane, IN Active Contract
DEPT OF DEFENSE
Bid Due: 7/29/2026
Project Number: 82016000-25-022-C1 Notice To Bidder: New Unit and Salt Building Project Manager
State Government of Indiana
Bid Due: 7/23/2026