Hastings SE Water Main Improvement Phase 2 HU 2026-12
Project Information
- Bid Title
- Hastings SE Water Main Improvement Phase 2 HU 2026-12
- Issuing Agency
- City of Hastings
- Location
- Nebraska
- Published Date
- Jan 8, 2026
- Closing Date
- Feb 4, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Hastings SE Water Main Improvement Phase 2 HU 2026-12
- Attachment Preview
-
General LegendGas MainGas ServiceNew Water Main on Plan SheetsExisting Water Main on Plan SheetsNew Water Service on Plan SheetsExisting Water Service on Plan SheetsNew Water Main on Fitting Detail SheetsExisting Water Main on Fitting Detail SheetsSanitary Sewer MainSanitary Sewer ServiceUnderground Electrical CableUnderground Electrical ServiceOverhead Electrical CableOverhead Electrical ServiceUnderground Telephone CableUnderground Telephone ServiceUnderground Cable TVUnderground Cable TV ServiceExisting ReducerNew ReducerExisting ValveNew ValveStop BoxExisting Fire HydrantNew Fire HydrantMeter PitExisting ManholeNew ManholeUtility PoleProperty PinPoured Thrust BlockGas MeterTelephone PedestalExisting Storm SewerTracer Wire RiserAbandon In-Place Existing Water Mains and Remove Old Valve Boxes and Stop Boxes.After New Main Passes Tests and Services Have Been Reconnected to the New Main.Existing Permanent EasementNew Permanent EasementNew Right of WayTemporary EasementCoverQuantitiesCW1.1 to CW1.12CW2.1 to CW2.2CW3.1 to CW3.2Sheet IndexPlan Cover SheetSheet Layout and QuantitiesWater Main Improvements Plan and Profile SheetsWater Main Improvements Civil Fitting DetailsWater Main Improvements Civil Standard Plan DetailsONLY EXISTING SANITARY SEWER ANDPROPOSED STORM SEWER ARE SHOWN INTHE PROFILE. ALL OTHER EXISTINGUNDERGROUND UTILITIES ARE TO BE FIELDVERIFIED DURING CONSTRUCTION.RKnow what's below.Call before you dig.HASTINGSUTILITIESCity of HastingsHastings Southeast WaterMain Improvements Phase 2WA-342 HU 2026-1226th Street26th StreetHastingsLakeSouth Shore DriveHastings Municipal AirportSouth Shore DriveYMCA/ChampionsWharfside DriveBurlington Avenue / Highway 281Med.22nd StreetPark19th StreetSunmartParadiseParkDriveLaneDriveSt.Michael's2nd Street17th StreetWatsonSchoolWestchester DriveDrainageway14th StreetEdgewood Lane32Elk LaneIndian Acres DriveSheridan DriveHeritage Drive12th StreetImperialMall9th StreetHome Street10th StreetHawthorneSchool11th Street10th Street9th StreetLibs ParkImperial Drive18th StreetYMCA16th Street14th StreetMorningside DriveCrestmoor DriveWestwood Terrace12th Street13th Street11th Street9th StreetBoyce Street8th StreetBateman Street7th Street6th Street5th Street3rd Street4th Street2nd StreetBoyce Street8th StreetBateman Street7th StreetChataquaParkOswegoField6th Street5th Street4th Street3rd Street2nd StreetMortonSchool8th StreetHastingsSeniorHigh SchoolHill StreetSumner Street18th Street17th Street16th Street15th St14th StreetHastingsMuseumFireStation12th StreetNorthDenverStation13th Street12th Street11th Street10th Street9th StreetLong-fellowSchoolHospital7th Street6th Street5th Street4th Street3rd Street2nd Street1st StreetMiddleSchoolCourthouse6th Street5th Street4th Street3rd StreetHighway 6/"J" StreetZion LutheranChurch & SchoolAg Processing, Inc.Grain ElevatorsA StreetA StreetB StreetB StreetC StreetD StreetBrickyardParkE StreetD StreetE StreetLincolnSchoolF StreetCentralLogisticsVanDiestG StreetUPSAdamsCountyFairGroundsThermo-KingDanaGreatPlainsHighway 6/"J" StreetI StreetArmourL&HScherbarthJESCOServi-TechCarterParkElizabeth LaneRenae LaneH StreetK StreetL StreetM StreetA StreetB StreetC StreetD StreetE StreetF StreetG StreetH StreetKent StreetLincolnParkFitzgerald LaneFireStationBy Pass Road/26th Street16th StreetUnion Pacific RailroadPacific Street14th StreetCrosierPark13th StreetRingland RoadLakeside DriveHeartwellForest BoulevardParkParkviewCemetaryMt SinaiCemetary12th Street9th StreetPleasant StreetUniversity StreetWaynoka StreetHastingsCollege7th Street9th StreetUniversity StreetWaynoka StreetPleasant Street7th StreetAlcottSchool6th Street5th Street4th Street3rd Street2nd StreetPark StreetSouth StreetA StreetB StreetC StreetD Street2nd StreetBurlington Northern RailroadDuncanFieldHarmParkE Street6th Street5th StreetGreenhouse3rd Street2nd StreetPerkinsEast Park StreetSouth Street / Highway 6B StreetC StreetD StreetE StreetGood Samaritan VillageF StreetF StreetG StreetPaul StreetH StreetKent StreetWayfair DriveHighway 6/"J" StreetAvalonBentwoodCranbrookDurwoodHastings Southeast NDOTProject S-6-4(1022)C.N.41086 Water MainImprovements.WR-13912th Street7th StreetHighway 6/South StreetPollutionControlFacilities26th Street12th StreetAg Processing, Inc.Ethanol Plant7th StreetBurlington Northern RailroadHighway 6/South StreetI, Keith A. Miller, am the Coordinating Professionalon the HASTINGS SOUTHEAST WATER MAINIMPROVEMENTS PHASE 2WA-342 HU 2026-12Hastings Southeast NDOTProject S-6-4(1022) C.N.41086Water Main ImprovementsPhase 2HASTINGSUTILITIESFORBIDDsn K. MillerDrwn S. StrussDate 12/30/2025Sup't. B. LubkenW.O. No. WA-342CkdCkdSheet No. CoverNo.WR-139(Paid by Hastings Utilities)General Notes1. The Contractor will be Responsible for Notifying the City StreetDepartment Office at (402)461-2341 and the CommunicationsCenter at (402)461-2364 for all Temporary Street Closings Priorto Construction.2. The Contractor is Responsible for the Traffic Control and Closureof any Lanes of Traffic and is Subsidiary to the Bid. AllBarricades and Barricading Shall Comply with the Latest Editionof Part VI of the Manual on "Uniform Traffic Control Devices".3. The Contractor will be Responsible for Calling "Diggers Hotline"for Locations of all Underground Facilities.4. The Contractor will be Responsible for Any and All SurfaceDisturbance caused by them.5. Tracer Wire, Tracer Wire Risers, Marking Tape, and Anodes willbe Supplied By Hastings Utilities, Installed by the Contractor,and Shall be Subsidiary to the Bid.6. Any Potholing or Excavating of Existing Utilities Needed toComplete this Project is Subsidiary to the Bid.7. Some Properties in the Project Area May Have UndergroundSprinklers on them. Any Damages and Repairs will be theResponsibility of the Contractor.RKnow what's below.Call before you dig.HASTINGSUTILITIESCity of HastingsHastings Southeast WaterMain Improvements Phase 2WA-342 HU 2026-12NEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINCW1.1CW1.2CW1.3CW1.4NEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" HDD CLASS 52 DIP WATER MAINNEW 12" CLASS 52 DIP WATER MAINNEW 12" CLASS 52 DIP WATER MAINCW1.5CW1.6NEW 12" CLASS 52 DIP WATER MAINNEW 12" CLASS 52 DIP WATER MAINFUTURE 24" WATER MAINCW1.7CW1.8NEW 10" CLASS 52 DIP WATER MAIN12" HDD Class 52 DIP Water Main10" HDD Class 52 DIP Water Main12" Class 52 DIP Water Main10" Class 52 DIP Water Main6" Class 52 DIP Water Main12" DIP Water Main w/Retaining Gaskets10" DIP Water Main w/Retaining Gaskets18" Casing, tw=.25"16" Casing, tw=.25"12" Gate Valve and Box10" Gate Valve and Box6" Gate Valve and BoxFire Hydrant (9'-0" Bury)Fire Hydrant (7'-0" Bury)Fire Hydrant (6'-6" Bury)Fire Hydrant (6'-0" Bury)12"x 12" MJ Tee (4)12"x 10" MJ Tee (1)12"x 6" MJ Tee (4)10"x 10" MJ Tee (9)10"x 6" MJ Tee (3)12" 45° MJ Bend (2)12" 22.5° MJ Bend (2)10" 90° MJ Bend (1)10" 45° MJ Bend (2)6" 90° MJ Bend (4)1349.001219.0017.0089.0020.0092.00250.0085.00190.0011.0013.0010.001.002.003.003.00640.00140.00440.001080.00330.00172.00160.0089.00140.00156.00Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.EachEachEachEachEachEachEachPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsWATER MAIN QUANTITIES24"x 12" MJ Reducer (1)12"x 10" MJ Reducer (2)10"x 6" MJ Reducer (3)6", 72" SW x SW Adapter (1)6", 36" SW x SW Adapter (8)6" 90° Hydrant Ell (7)12" MJ Plug (3)10" MJ Plug (8)6" MJ Plug (1)10" MJ Cap (2)12" Foster Adaptor10" Foster Adaptor6" Foster Adaptor24" MEGA Lug12" MEGA Lug10" MEGA LugRemove Fire Hydrant Assembly2" Water Service w/Casing 120' to 140'2" Water Service w/Casing 100' to 120'1.5" Water Service w/Casing 80' to 100'1" Water Service w/Casing 80' to 100'1" Water Service w/Casing 20' to 40'1.5" Water Service 0' to 20'1" Water Service 0' to 20'305.00122.00141.00174.00696.00364.00138.00288.0016.0064.0016.0024.005.001.009.0013.004.001.001.004.007.001.002.008.00PoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsEachEachEachEachEachEachEachEachEachEachEachEachEachEach3 lb. AnodeBlue Water Marking TapeTracer WireTracer Wire RiserThrust Block9.003198.003198.009.0024.00EachLin. Ft.Lin. Ft.EachEachI, Keith A. Miller, am the Coordinating Professionalon the HASTINGS SOUTHEAST WATER MAINIMPROVEMENTS PHASE 2WA-342 HU 2026-12Hastings Southeast NDOTProject S-6-4(1022) C.N.41086Water Main ImprovementsPhase 2HASTINGSUTILITIESFORBIDDsn K. MillerDrwn S. StrussDate 12/30/2025Sup't. B. LubkenW.O. No. WA-342CkdCkdSheet No. QuantitiesNo.WR-139(Paid by Hastings Utilities)819 East South Street1007 East South StreetP1d1921.841917.09 (FL)1916.42 (Btm Ftg)South StreetAsphalt/ConcreteP2d1919.521915.52 (FL)1914.85 (Btm Ftg)P3d1919.521914.52 (FL)1913.85 (Btm Ftg)P4d1919.751915.25 (FL)1914.58 (Btm Ftg)South StreetAsphalt/Concrete910 East South Street916 East South StreetP6d1914.401909.40 (FL)1908.73 (Btm Ftg)P6d1914.401909.40 (FL)1908.73 (Btm Ftg)P8d1913.981910.65 (FL)1909.98 (Btm Ftg)P9d1913.551910.55 (FL)1909.88 (Btm Ftg)P10d1913.111910.36 (FL)1909.69 (Btm Ftg)P11d1913.521910.10 (FL)1909.43 (Btm Ftg)South StreetAsphalt/ConcreteP1s1913.891909.22 (FLS)1908.55 (Btm Ftg)P7d1913.451910.45 (FL)922 East South Street1909.78 (Btm Ftg)ACW1.1A806 East South Street2372+001920191519102373+00Proposed GradePHASE 1 10" WATER MAIN2374+00Phase 1 10" WATER MAIN20'2375+00NORTHScale: 1" = 20'(Reduced Scale: 1" = 30')0'20'40'60'2376+00Proposed GradePROPOSED 18" STORM SEWER1905190018952372+00No.RKnow what's below.Call before you dig.Revision2373+00ByDateCkd2374+00App10" HDD Class 52 DIP Water Main10" Class 52 DIP Water Main10" Gate Valve and Box6" Gate Valve and BoxFire Hydrant (6'-0" Bury)10"x 10" MJ Tee (1)10"x 6" MJ Tee (1)10" 45° MJ Bend (2)6" 90° Hydrant Ell (1)6", 36" SW x SW Adapter (1)10" MJ Plug (2)48.005.002.001.001.00120.0090.00140.0052.0087.0072.00Lin. Ft.Lin. Ft.EachEachEachPoundsPoundsPoundsPoundsPoundsPounds2375+00WATER MAIN QUANTITIES10" Foster Adaptor10" MEGA LugRemove Fire Hydrant Assembly3 lb. AnodeBlue Water Marking TapeTracer WireTracer Wire RiserThrust Block1" Water Service 0' to 20'4.003.001.001.0058.0058.001.005.001.00EachEachEachEachLin. Ft.Lin. Ft.EachEachEach2376+00ANOTE 922 SERVICEInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection8 LF - 1" Service Line2377+002378+00Proposed Grade19201915PROPOSED 30"STORM SEWERPROPOSED 30" STORM SEWER48 LF OF 10" HDD WATER MAIN1910190519002377+00I, Keith A. Miller, am the Coordinating Professionalon the HASTINGS SOUTHEAST WATER MAINIMPROVEMENTS PHASE 2WA-342 HU 2026-1218952378+00Hastings Southeast NDOTProject S-6-4(1022) C.N.41086Dsn K. MillerDrwn S. StrussDate 12/30/2025Sta. 2372+00 to Sta. 2378+00 Sup't. B. LubkenWater Main ImprovementsW.O. No. WA-342CkdPhase 2CkdHASTINGSUTILITIESFORBIDSheet No. CW1.1No.WR-139(Paid by Hastings Utilities)1007 East South StreetBNOTE 1007 SERVICEInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection81 LF - 1" Service Line73 LF - 2 21" Poly CasingBDSouth StreetAsphalt/ConcreteQ4d1912.281908.78 (FL)1908.11 (Btm Ftg)Q1d1911.431909.43 (FL)1908.76 (Btm Ftg)Q2d1912.571908.49 (FL)1907.82 (Btm Ftg)Q3d1912.571907.90 (FL)1907.23 (Btm Ftg)1103 East South StreetQ5d1912.281908.61 (FL)1907.94 (Btm Ftg)CCW1.115'-0"CSouth StreetAsphalt/ConcreteDNOTE 203,1113 SERVICESInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection12 LF - 1" Service Line1113 East South StreetQ7d1910.491908.24 (FL)1907.57 (Btm Ftg)DQ8d1911.681907.76(FL)1907.09 (Btm Ftg)CQ9d1911.671907.00 (FL)1906.33 (Btm Ftg)CSouth StreetAsphalt/ConcreteBCW1.11100 E. South St.Q6d1911.051908.05 (FL)1907.38 (Btm Ftg)2378+001920191519101905190018952378+00No.RKnow what's below.Call before you dig.2379+00NORTHScale: 1" = 20'(Reduced Scale: 1" = 30')20'0'20'40'60'2380+002381+002382+001108 East South Street2383+001120 East South StreetCNOTE 1100,1108,1120 SERVICESInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection80 LF - 1" Service Line75 LF - 2 21" Poly Casing2384+001920Proposed GradePROPOSED 30" STORM SEWER297 LF OF 10" HDD WATER MAINFinished Grade Sameas ExistingPROPOSED 36" STORM SEWERProposed GradeProposed Grade304 LF OF 10" HDD WATER MAIN1915191019051900Revision2379+00ByDateCkd2380+00App10" HDD Class 52 DIP Water Main10" Cl. 52 DIP w/Retaining Gaskets6" Class 52 DIP Water Main16" Casing, tw=.25"10" Gate Valve and Box6" Gate Valve and BoxFire Hydrant (6'-6" Bury)10"x 10" MJ Tee (2)10"x 6" MJ Tee (1)6" 90° MJ Bend (4)10"x 6" MJ Reducer (2)601.0081.0020.0060.003.003.002.00240.00110.00156.0094.00Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.EachEachEachPoundsPoundsPoundsPounds2381+00WATER MAIN QUANTITIES6" 90° Hydrant Ell (1)6", 72" SW x SW Adapter (1)6", 36" SW x SW Adapter (1)10" MJ Plug (1)10" Foster Adaptor6" Foster Adaptor10" MEGA Lug1" Water Service w/Casing 80' to 100'1" Water Service 0' to 20'52.00174.0087.0036.007.004.002.004.002.00PoundsPoundsPoundsPoundsEachEachEachEachEach3 lb. AnodeBlue Water Marking TapeTracer WireTracer Wire RiserThrust Block2382+002.00660.00660.002.005.00EachLin. Ft.Lin. Ft.EachEach2383+00I, Keith A. Miller, am the Coordinating Professionalon the HASTINGS SOUTHEAST WATER MAINIMPROVEMENTS PHASE 2WA-342 HU 2026-1218952384+00Hastings Southeast NDOTProject S-6-4(1022) C.N.41086Dsn K. MillerDrwn S. StrussDate 12/30/2025Sta. 2378+00 to Sta. 2384+00 Sup't. B. LubkenWater Main ImprovementsW.O. No. WA-342CkdPhase 2CkdHASTINGSUTILITIESFORBIDSheet No. CW1.2No.WR-139(Paid by Hastings Utilities)1117 East South StreetEGR1d1911.361908.11 (FL)197.44 (Btm Ftg)R2d1911.131907.63 (FL)1906.96 (Btm Ftg)South StreetAsphalt/ConcreteENOTE 1117 SERVICEInstall1 - 1 21" Service Saddle1 - 1 21" Curb Stop and Box1 - 1 21"" Service Connection12 LF - 1 21"" Service LineFNOTE 1211,1301 SERVICESInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection12 LF - 1" Service LineGR4d1910.851906.85 (FL)1906.18 (Btm Ftg)R5d1910.611906.19 (FL)1905.52 (Btm Ftg)R6d1910.671906.00 (FL)1905.33 (Btm Ftg)1211 East South StreetFSouth StreetAsphalt/ConcreteGNOTE 1200,1200 1/2,1400 SERVICESInstall1 - 1" Service Saddle1 - 1" Curb Stop and Box1 - 1" Service Connection75 LF - 1" Service Line70 LF - Bore 2 21" Poly CasingDCW1.11301 E. South St.F1327 E. South St.ECW1.11906.50 Ground1906.50 (FL)R9d1909.831905.58 (FL)1904.91 (Btm Ftg)20'-0"R10d1909.821905.15 (FL)1904.48 (Btm Ftg)South StreetAsphalt/ConcreteR11d1909.501905.08 (FL)1905.13 (Btm Ftg)R1s1909.181904.85 (FL)1904.18 (Btm Ftg)R12d1909.501905.00 (FL)1904.33 (Btm Ftg)R14d1909.581905.25 (FL)1904.58 (Btm Ftg)R13d1909.621905.12 (FL)1904.45 (Btm Ftg)R3d1911.281907.28 (FL)1906.61 (Btm Ftg)1200 East South Street1120 East South Street2384+001200 1/2 East South StreetBuilding Behind Barrel Bar2385+00R7d1910.711906.71 (FL)1906.04 (Btm Ftg)R8d1910.131906.88 (FL)1906.21 (Btm Ftg)FCW1.1GFCW1.12386+00NORTHScale: 1" = 20'(Reduced Scale: 1" = 30')20'0'20'40'60'2387+002388+001400 E. South St.2389+002390+001920191519101905190018952384+00No.RKnow what's below.Call before you dig.1920Proposed GradeProposed GradeProposed Grade19151910380 LF OF 10" HDD WATER MAIN190 LF OF 10" HDD WATER MAIN30 LF OF12" HDDWATER MAIN19051900Revision2385+00ByDateCkd2386+00App12" HDD Class 52 DIP Water Main10" HDD Class 52 DIP Water Main10" Cl. 52 DIP w/Retaining Gaskets10" Class 52 DIP Water Main16" Casing, tw=.25"12" Gate Valve and Box10" Gate Valve and Box6" Gate Valve and BoxFire Hydrant (7'-0" Bury)12"x 12" MJ Tee (1)12"x 10" MJ Tee (1)10"x 10" MJ Tee (4)30.00570.0080.0075.0060.001.006.001.001.00160.00140.00720.00Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.Lin. Ft.EachEachEachEachPoundsPoundsPounds2387+00WATER MAIN QUANTITIES10"x 6" MJ Tee (1)12" 22.5° MJ Bend (1)10" 90° MJ Bend (1)10" 45° MJ Bend (2)12"x 10" MJ Reducer (1)6" 90° Hydrant Ell (1)6", 36" SW x SW Adapter (1)12" MJ Plug (1)10" MJ Plug (3)6" MJ Plug (1)10" MJ Cap (2)12" Foster Adaptor90.0080.0089.00140.0061.0052.0087.0046.00108.0016.0064.004.00PoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsPoundsEach2388+0010" Foster Adaptor12" MEGA Lug10" MEGA LugRemove Fire Hydrant Assembly1 1/2" Water Service 0' to 20'1" Water Service w/Casing 80' to 100'1" Water Service 0' to 20'3 lb. AnodeBlue Water Marking TapeTracer WireTracer Wire RiserThrust Block10.001.007.001.001.003.002.002.00830.00830.001.007.00EachEachEachEachEachEachEachEachLin. Ft.Lin. Ft.EachEach2389+00I, Keith A. Miller, am the Coordinating Professionalon the HASTINGS SOUTHEAST WATER MAINIMPROVEMENTS PHASE 2WA-342 HU 2026-1218952390+00Hastings Southeast NDOTProject S-6-4(1022) C.N.41086Dsn K. MillerDrwn S. StrussDate 12/30/2025Sta. 2384+00 to Sta. 2390+00 Sup't. B. LubkenWater Main ImprovementsW.O. No. WA-342CkdPhase 2CkdHASTINGSUTILITIESFORBIDSheet No. CW1.3No.WR-139(Paid by Hastings Utilities)
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NOTICE OF TAKING BIDS FOR THE...
NOTICE OF TAKING BIDS FOR THE CONSTRUCTION OF THE LORRAINE AVENUE RESURFACING PROJECT
City of Sioux City
Bid Due: 8/21/2026
Water/Sanitary Sewer Relocati...
Water/Sanitary Sewer Relocation HU 2026-69 Open: 2026-06-30 Status: Active Department: Engineering Bid Plans
City of Hastings
Bid Due: 7/29/2026