Woodhaven Driveway Replacement and Asphalt Paving
Project Information
- Bid Title
- Woodhaven Driveway Replacement and Asphalt Paving
- Issuing Agency
- City of Duluth
- Location
- Georgia
- Published Date
- Jun 11, 2026
- Closing Date
- Jun 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Woodhaven Driveway Replacement and Asphalt Paving
Addendum 1 - Questions
May 13, 2026
:
June 25, 2026
1:45
PM
- Attachment Preview
-
ADDENDUM NO. 1TOCONTRACT DOCUMENTSWOODEHAVEN DRIVEWAY REPLACEMENT AND ASPHALT PAVINGDULUTH, GEORGIABIDS DUE JUNE 25, 2026No. QUESTIONRESPONSE1 The curb is poured monolithic on Folkstone Dr, Remove driveway and curb and replace both.is it the city’s preference to remove drivewayand curb or pour driveway and saw cut, leavingoriginal curb?2 There is no line item for asphalt patching, can Asphalt patching will be added.one be added in case it is needed?3 For the milling, is the 1.5” off of the existing or 1.5” off the existing.below the gutter line? Some of the streets havebeen overlayed and asphalt is above the curb.4 Home owners have poured concrete in theWe expect careful effort be made to not disturbgutter line in front of the driveways. When we the concrete in the gutter in front of driveways,are milling and paving if those come loose orbut they are not the contractor’s responsibilitybreak, are we required to pour those back?to fix because Duluth does not allow these.5 Will payment be based on field measurements Payment will be based on field measurements.or the exact quantities on the line items?6 Asphalt PatchingAsphalt patching will be added.The plans reference patching as part of the milland inlay detail; however, the bid form doesnot appear to include a separate patching item.Should asphalt patching be consideredincidental to the milling/asphalt items, or will itbe paid separately if required?7 Unsuitable SoilsYes, it should include the items you mentioned.For the unsuitable soils item, please confirm57 Stone.whether the unit price should includeexcavation, haul-off, disposal, replacementmaterial, placement, and compaction. Also,please clarify what replacement material shouldbe assumed.8 Resident Parking / Driveway AccessThe City will coordinate with residents onWill the City or HOA provide temporary parking temporary parking during construction. Thereareas for residents during concrete removal,is on-street parking to be utilized.replacement, and curing, or will the contractorbe responsible for coordinating and maintainingresident parking/access?Addendum Prepared ByKECK & WOOD, INC.June 12, 2026
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
26-272 Deans Bridge Road MSW ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-72155-NONST-2026-000000194
State Government of Georgia
Bid Due: 8/06/2026
160-172 Dalrymple Road Stormw...
Project: 160-172 Dalrymple Road Stormwater Improvement Ref. #: 26-053 Type: ITB Status: Open
City of Sandy Springs
Bid Due: 7/07/2026