Hurricane Ian Revetment Repairs at Centennial Fishing Pier

Project Information

Bid Title
Hurricane Ian Revetment Repairs at Centennial Fishing Pier
Issuing Agency
Charlotte County
Location
Florida
Published Date
Dec 23, 2025
Closing Date
Jan 6, 2026
Government Level
State & Local
Status
Closed
Ref. #
26-197
Original Source
Join to Access Full Details
Project Description
File No:

26-197
Description:

Hurricane Ian Revetment Repairs at Centennial Fishing Pier
Contact:

stacey.trowbridge@charlottecountyfl.gov
File number:

20260197
Due Date:
1/6/2026 3:00:00 PM
Notice:
Package:
Registered Vendors Notified:
Presubmittal Sign-in:
Tabulation:
Recommendation:
Commodity Codes:

08500, 08573, 12000, 12035, 91200, 98800, 98814, 95900, 95935, 95939, 95990, 96800, 96834
Attachment Preview
Board of County Commissioners
Request for Quotation
THIS IS NOT AN ORDER
RFQ #20260197 - Addendum #4
Date: 12/23/25
Page: 1 of 1
Charlotte County Purchasing Division
18500 Murdock Circle, Room 344
Port Charlotte, Florida 33948-1094
Contact Person: Stacey Trowbridge, Contract Specialist
Phone: 941.743.1526
Email: Stacey.Trowbridge@charlottecountyfl.gov
FAX: 941.743.1384
Reply No Later Than: January 6, 2026 @ 3:00 p.m. (EST)
HURRICANE IAN REVETMENT REPAIRS AT CENTENNIAL FISHING PIER
Quoters are hereby notified that this Addendum shall be made a part of the above-named quote documents. The following
items are issued to add to, modify, and clarify the quote documents. These items shall have the same force and effect as the
original quote documents. Quote Forms, to be submitted on the specified date, shall conform with the additions, deletions and
revisions listed herein
ITEM #1: QUESTIONS/ANSWERS
Q1: Under scope of services, it states "Replace geotextile fabric". Is the Contractor required to remove the existing
fabric in these areas before installing new?
A1: Yes, the existing fabric will have to be removed before installing new.
Q2: Is the Contractor required to remove current rip rap and other rock in these areas to a certain depth before installing
the 12" base layer?
A2: The base will need to be excavated to meet existing grade. There is some rip rap that will need to be removed and set to
the side but can be reused along with the new added rip rap.
Q3: Will the new fabric be installed at a minimum depth after these materials have been excavated?
A3: The geotextile will be added under the new base layer at a depth of 12”. Most of the existing fabric is exposed already under
the rip rap.
Quoters are required to acknowledge receipt of this addendum on their quote forms. All other terms and conditions of the
original bidding and contract documents remain the same.
for
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager - Purchasing
KAC/st
1
Commodity Codes
  • NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Orange County Corrections Dep...

Project ID: Y25-790-RC Title: Orange County Corrections Department Female Detention Center Two Cell

Orange County

Bid Due: 7/14/2026

Drainage Repair and/or New Pu...

Project ID: 25/26-094 Title: Drainage Repair and/or New Public Works Construction Addenda: 0

Clay County

Bid Due: 7/09/2026