Demolition New Jasper Twp.
Project Information
- Bid Title
- Demolition New Jasper Twp.
- Issuing Agency
- County of Greene
- Location
- Ohio
- Published Date
- Mar 9, 2026
- Closing Date
- Mar 24, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP-D001 JASPER RD.
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFP-D001 JASPER RD.
Bid Title: Demolition New Jasper Twp.
Category: Department of Development Status: Open Description: On behalf of the Greene County Department of Development, Patriot Engineering and Environmental, Inc. (Patriot) is requesting proposals for the Building Demolition of selected structures throughout Greene County, Ohio. Generally, this work will consist of demolition and permanent removal of existing structures at the property locations identified in this Request for Proposal (RFP). This work is being performed under a grant agreement between the Greene County Department of Development and the Ohio Department of Development (ODOD) under the Building Demolition and Site Revitalization Program. Detailed information concerning the RFP, including the scope of work, due date for submittal, and prebid meeting, submittal procedures, requests for additional information, etc., is provided in the enclosed form.
Publication Date/Time: 3/9/2026 9:00 AM Closing Date/Time: 3/24/2026 10:59 AM Bid Opening Information: 03/24/2026 11 AM Pre-bid Meeting: 03/16/2026 at 1:00 PM Contact Person: Kristie Tidd
Greene County Department of Development
937-562-5644
[email protected]Download Available: Yes Fee: 0.00 Business Hours: 7:30 AM - 4:00 PM Special Requirements: Asbestos Testing and Universal Waste Surveys have been performed for each property, and a report is included with this RFP as Attachment D. Contractor
is responsible for OEPA Notification and to have asbestos abatement performed by a licensed company and universal waste disposal in accordance with applicable regulations. The Ohio Department of Development Asbestos Compliance Form, included as Attachment E, is to be completed and returned with project close-out documentation. Costs for these items should be included in the project quote. A 10-working-day notification to OEPA is required from the contractor before demolition of any commercial or residential property begins (unless emergency demolition). All work which the Contractor is required to perform shall commence within 30 working days after the OEPA ten-day notification expires and shall be completed by the date specified by Greene County Department of Development on the NTP. In no case shall project completion extend past 75 calendar days, unless previous arrangements have been made and agreed upon in writing by Greene County Department of Development. In addition, local permits and notification are required as per applicable County and/or local ordinance. Contractor must provide at least 48 hours' advance notification to Patriot Engineering and Environmental (Patriot) to allow for scheduling of contractor oversight. At a minimum, Patriot will complete, in conjunction with the contractor, the Pre-Demolition (this is required to be completed by a Patriot representative before site demolition activities commence) and Post-Demolition (this is required to be completed by a Patriot representative and signed by the demolition contractor upon completion of work, prior to demobilization of contractor equipment) Site Checklists. Examples of both are included in Attachment F.Related Documents: - Attachment Preview
-
March 6, 2026RE: Request for ProposalBuilding DemolitionGreene County Department of DevelopmentDear Prospective Bidder:On behalf of the Greene County Department of Development, Patriot Engineering andEnvironmental, Inc. (Patriot) is requesting proposals for the Building Demolition of selectedstructures throughout Greene County, Ohio. Generally, this work will consist of demolition andpermanent removal of existing structures at the property locations identified in this Request forProposal (RFP). This work is being performed under a grant agreement between the GreeneCounty Department of Development and the Ohio Department of Development (ODOD) underthe Building Demolition and Site Revitalization Program.Detailed information concerning the RFP including the scope of work, due date for submittal, pre-bid meeting, submittal procedures, requests for additional information, etc., is provided in theenclosed form.Sincerely,Patriot Engineering and Environmental, Inc.Erik CorbinSenior Project ManagerEnclosureDemolition Request for ProposalMichael D. Weinstein, PG, CPRegional Environmental ManagerGREENE COUNTY DEPARTMENT OF DEVELOPMENTREQUEST FOR PROPOSALBUILDING DEMOLITIONRFP D001-26MARCH 6, 2026PLEASE NOTE: THIS DOCUMENT CONSTITUTES A REQUEST FOR PROPOSALS. THISREQUEST FOR PROPOSALS IS NOT A BID AND IS NOT GOVERNED BY STATE ORFEDERAL BIDDING REQUIREMENTS.PATRIOT ENGINEERING AND ENVIRONMENTAL, INC., ON BEHALF OF THE GREENECOUNTY DEPARTMENT OF DEVELOPMENT, RESERVES THE RIGHT TO ACCEPT ORREJECT ANY AND ALL QUOTATIONS IF THEY DETERMINE THAT IT IS IN THEIR BESTINTEREST TO DO SO, AND/OR REQUIRE THE SUBMISSION OF MODIFICATIONS ORADDITIONS TO PROPOSALS AS A CONDITION OF FURTHER PARTICIPATION IN THESELECTION PROCESS OR SEEK ADDITIONAL INFORMATION FROM RESPONDENTS.SUBMIT SEPARATE PROPOSALS AND PRICING FOR EACH PROPERTY, IF NECESSARY.NOTICE TO RESPONDENTS:Sealed bids will be received by the Board of CountyCommissioners of Greene County, Ohio, 35 Greene St.,Xenia, OH 45385, until 10:59 AM, TUESDAY, MARCH 24,2026. At such time, the bids will be opened and read aloud.PROPOSALS DUE:DATE:March 24, 2026Time:10:59 AMRFP CONTACT:Erik CorbinPhone: (937) 353-2850Email: ecorbin@patrioteng.comBids shall be submitted in sealed envelopes, properly identified with the Bidder's name, contactnumber, bid opening date, and a statement that it is a sealed bid covering the materials or servicesfor which the bid is submitted. Bids shall be addressed to:Greene County Board of Commissioners3381 Jasper Road Demolition35 Greene St.Xenia, OH 45385A mandatory pre-bid meeting will be held at the site on Monday, March 16th at 1:00 p.m.EDT. Parking at the site is very limited and bidders should park along the driveway at 3341 JasperRoad (see parking map included). Proposals should be submitted on the attached Greene CountyDepartment of Development Proposal Form. Fill in all the requested information. Asbestosabatement and universal waste removal is to be included. Provisions contained in AttachmentA, Greene County Department of Development Demolition Project Specifications, apply to thiswork.Greene County Commissioners reserve the right to reject any and all bids, to waive any and allinformalities, and to disregard all non-conforming, non-responsive, or conditional bids. Thebasis for Contract award shall be based on a Best Value Selection for this project. As such,Greene County intends to use a selection process for services where total cost, as well as othernon-cost factors, are considered in the evaluation, selection, and final award of this contract.Greene County will consider the below factors to help determine the best value. Each proposalwill be scored on a points system, with the bidder achieving the highest number of points, out ofa maximum of 25 points total, being selected as the winning bidder.i. Total Cost (0-10 points). Total cost will be evaluated for each bidder. The bidder withthe lowest cost will be assigned 10 points, while the next lowest bidder will receive 9points, third lowest bidder awarded 8 points, etc.ii. Past Performance and the qualifications and experience of the Bidder, specificallywith prior projects executed with the Greene County Department of Development (0 –5 points).iii. Bidder maintains an office within Brown County, Ohio (0 – 1 point).iv. Compliance of Bid Response with the prescribed requirements of this Bid Package (0– 4 points).v. Bidder’s proposed schedule for completion of tasks specified in this Bid Package (0 –5 points).A purchase order or a Notice of Award and Authorization to Proceed letter (example included asAttachment B) will be issued for each demolition project. The selected bidder will be required toreturn a signed copy of the “Notice of Award and Authorization to Proceed” letter, along with thecompleted Proposed Project Schedule.The Contractor shall submit the Contract Completion Certificate and Pay Application for theDemolition of Residential Structures Affidavit, included as Attachment C, along with theappropriate invoice, manifest/waste shipment records (ACM/C&DD) of disposal, permits andnotifications, and photos. Copies of all disposal documentation shall be provided with the paymentapplication as instructed. As this work is being completed with ODOD grant funding, Contactorsshall only submit one (1) invoice per month. Greene County will pay invoices within 10 businessdays of receiving reimbursement funds from the State.Submit a proposal for the demolition of the following property:PROPERTY#1COMMERCIAL/RESIDENTIALResidentialADDRESS3381 Jasper Road Xenia, OhioMANDATORY PRE-BIDMEETINGMarch 16, 2026, at1:00pmProperty #1 InformationAddress: 3381 Jasper Road Xenia, OhioSpecial Notes: Demolish and remove 2-story residential home and associated foundation,including basement walls. Backfill basement. Properly abandon well on property. Removesurrounding trash around residential structure. Remove and properly dispose of universalwaste. Limited tree removal will be required and discussed during pre-bid meeting. Grade,seed/straw disturbed areas.ASBESTOS: Results of the sampling indicate that transite siding, joint compound andtextured drywall, contain asbestos percentages greater than 1%- see report.Abatement required before demolition begins.PRE- BID MEETING DATE/TIME: March 16, 2026 @ 1:00pmASBESTOS / UNIVERSAL WASTE: Asbestos Testing and Universal Waste Surveys have beenperformed for each property and a report is included with this RFP as Attachment D. Contractoris responsible of OEPA Notification and to have asbestos abatement performed by licensedcompany and universal waste disposal in accorance with applicable regulations. The OhioDepartment of Development Asbestos Compliance Form, included as Attachment E, is to becompleted and returned with project close-out documentation. Costs for these items should beincluded in the quote for this project.Ten working day notification to OEPA is required from contractor before demolition of anycommercial or residential property begins (unless emergency demolition). All work which theContractor is required to perform shall commence within 30 working days after the OEPA ten daynotification expires and shall be completed by the date specified by Greene County Departmentof Development on the NTP. In no case shall project completeion extend past 75 calender days,unless previous arangements have been made and agreed upon in writing by Greene CountyDepartment of Development. In addition, local permits and notification are required as perapplicable County and/or local ordinance. Contractor must provide at least 48-hours advancenotification to Patriot Engineering and Environmental (Patriot) to allow for scheduling ofcontractor oversight. At a minimum, Patriot will complete, in conjunction with the contractor,the Pre-Demolition (this is required to be completed by a Patriot representative before sitedemolition activities commence) and Post-Demolition (this is required to be completed by a Patriotrepresentative and signed by the demolition contractor upon completion of work, prior todemobilization of contractor equipment) Site Checklists. Examples of both are included inAttachment F.Photographic evidence shall be submitted of the property before, during, and after demolitionwork is completed.In the event borrow source material is required to be imported from an off-site source(s), theEnvironmental Questionnaire for Proposed Borrow Source form, included as Attachment F, mustbe completed and submitted by email to Patriot (ecorbin@patrioteng.com andmweinstein@patrioteng.com) for approval prior to bringing borrow material on-site. Beforeproperty is backfilled Photographic evidence shall be submitted of empty basement voids.BOND REQUIREMENTSA BID BOND is not required to be submitted for this proposal.In lieu of a PERFORMANCE BOND, the successful BIDDER will be required to enter into aRetainage Agreement with Patriot as an assurance for timely completion of the entire project in aquality manner in accordance with the CONTRACT DOCUMENTS. Implementation of thisRetainage Agreement eliminates the requirements for a BID BOND, PERFORMANCE BOND,and PAYMENT BOND. The schedule of this Retainage Agreement will be structured as follows:1.Retainage Amount: Eight percent (8%) of each monthly progress payment requestwill be withheld from payment.2. Maximum Retainage Amount: When fifty percent (50%) of the project is completed(as determined by 50% of total project costs being billed via monthly progresspayment requests), no additional retainage will be withheld.3. Retainage Release: Within thirty (30) days of the project acceptance all retainageswithheld will be released to the Contractor.INSURANCE REQUIREMENTSRequired insurance is detailed in Item #3 under the General Conditions of the Contract section ofthis RFP.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.