RFP 26-025 7001 East 163rd Street Roof Replacement - Belton, MO
Project Information
- Bid Title
- RFP 26-025 7001 East 163rd Street Roof Replacement - Belton, MO
- Issuing Agency
- Drexel Technologies
- Location
- Missouri
- Published Date
- Sep 9, 2026
- Closing Date
- Oct 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFP 26-025 7001 East 163rd Street Roof Replacement - Belton, MO26-025StatusAccepting Bids
Prebid Date 9/14/26 10:00am Bid Date 10/2/26 10:00am Company & ContactsCity of BeltonGreg Rokos, Assistant City Manager/Public Works Director816-892-1269LocationBelton, MO
Date Issued: 9/4/2026
Sealed proposals will be received by the Assistant City Manager/Public Works Director of the City of Belton at the City of Belton Public Works Facility located at 700 Seabee Road, Belton, Missouri, 64012 at the Administration Building (Building A) until 10:00 a.m., local time, on October 2, 2026, at which bidding will be closed. All bids will be opened and read aloud. A late Proposal Packet is one received after 10:00 a.m., local time, at the time and place of the opening as stated. The decision as to the correct time for the openings shall be made by the Assistant City Manager/Public Works Director of the City of Belton and that decision shall be final. Proposals received after the deadline date and time will be returned unopened. It shall be the responsibility of those submitting a proposal to assure themselves that their proposal has been received by the City of Belton.
Project Description
The project shall consist of the complete removal and replacement of the existing roofing system to the top of the existing roof deck, including removal and replacement of all roof membranes, insulation, flashings, edge metal, expansion joints, transitions, penetration flashings, and associated roofing accessories. The new roofing system shall consist of a fully-adheredtpo membrane and all components necessary to provide a complete, watertight assembly.
The work shall also include the temporary removal and reinstallation of rooftop mechanical equipment as required to facilitate roofing operations, together with alternate bid items for the replacement of designated rooftop mechanical units, including all associated curbs, flashing modifications, and mechanical and electrical connections necessary for a complete and operational installation.
The specific locations of the work to be done shall be contained in the special provisions section of the bid document. The Contractor shall bid on all work.
All equipment, materials, and workmanship must be in accordance with the Specifications and other Contract Documents.
RFP documents can be seen (viewing low resolution images online is free) or purchased for a non-refundable fee online at www.drexeltech.com in their online Plan Room. For access assistance, please contact Drexel directly by phone at 913-471-4430 or by email at distribution@drexeltech.com . Information regarding this RFP can be found in the “Public Jobs” link on Drexel’s website.
A copy of the City of Belton Design and Construction Manual may be downloaded at no cost from the City’s website at https://www.belton.org/Departments/Public-Works-Department/Design-and-Construction-Manual .
A mandatory Pre-Bid Meeting will be held on September 14, 2026, at 10:00 a.m., local time, and September 16, 2026, at 10:00 a.m., local time, at the City of Belton Police Station located at 7001 East 163rd Street, Belton, Missouri 64012. Due to the importance of all bidders having a clear understanding of the specifications and scope of work requirements, bids will only be accepted from those who are represented at one of the Pre-Bid Meetings. Attendance at the Pre-Bid Meeting will be evidenced by the representative’s signature on the attendance roster.
All bids must be accompanied by a Bid Bond from a surety or certified check from a bank acceptable to the Assistant City Manager/Public Works Director in the amount equal to or greater than 5% of the maximum total bid price. Prior acceptability of the proposed surety or bank furnishing the bid security before the bid date is recommended. An unacceptable bid security may be cause for rejection of the proposal. No bidder may withdraw his bid for a period of sixty (60) days after the date of opening of bids.
Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction safety program for all employees who will be on-site at the project. The construction safety program shall include a course in construction safety and health that is approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations that is at least as stringent as an approved OSHA program as required by Section 292.675, RSMo.
All wages paid for work under this contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through 290.340, RSMo 1969, as amended.
Pursuant to 610.021 RSMo Item 12, all documents within a request for proposal will become open record to the public upon a negotiated contract being executed. All documents within a request for bid become open record as soon as the bid is opened. Bidders and proposers should be aware that all documents within a submittal will become open records.
The Owner reserves the right to reject any or all proposals and to waive informalities or deficiencies therein to negotiate with any or all bidders or others for more favorable terms or prices and to award a contract to other than the bidder submitting the lowest cost bid proposal with or without negotiation and to determine which is the lowest, best, and most responsive to accept, at its option, any alternates and to approve the bond.
On all requests and correspondence, please reference RFP Number 26-025.
Requests for information related to this RFP should be directed to:
Greg Rokos, Assistant City Manager/Public Works Director
Telephone: 816-892-1269
E-Mail: grokos@belton.org
- Commodity Codes
-
- NAICS 238160Roofing Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Replacement of Bridge 9 on MK...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Columbia
Bid Due: 10/20/2026
Billy Mills Middle School Dom...
Billy Mills Middle School Domestic Water Boiler Replacement IFB-FY-27-0024 StatusAccepting Bids Prebid Date
Drexel Technologies
Bid Due: 10/28/2026