FO503096 North Campus Abatement
Project Information
- Bid Title
- FO503096 North Campus Abatement
- Issuing Agency
- University of Connecticut
- Location
- Connecticut
- Published Date
- Feb 6, 2026
- Closing Date
- Mar 4, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- FO503096
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
FO503096 North Campus Abatement
Number FO503096 Open 2/05/2026 Close 3/04/2026 2:00 PM Type ITB - Invitation to Bid Pre-Bid
Non-Mandatory 2/11/2026 8:30 AM UPDATED
3 Discovery Drive, Purchasing Bid Room
Storrs, Connecticut 06269
United States
Map ItRFI
2/20/2026 2:00 PM Contact Chris Peters chris.peters@uconn.edu (860) 486-6324 Details Only previously prequalified contractors may submit a bid for this project. Documents FO503096-Solicitation-Information-Sheet_REV1 .pdf UPDATED - Attachment Preview
-
SOLICITATION INFORMATION SHEETCONSTRUCTION - GENERAL CONTRACTOR/TRADE CONTRACTORINVITATION TO BID REV1 2/5/2026The University of Connecticut is accepting sealed Bids for:ITB RELEASE DATE: 2/4/2026PROJECT NUMBER: FO503096PROJECT NAME:North Campus AbatementPROJECT LOCATION: 82 North Eagleville Road, Storrs, CT 06269PROCUREMENT AGENT: Chris Peters, chris.peters@uconn.edu, 860-486-6324INTENT OF THIS SOLICITATION: The purpose of this Invitation to Bid (“ITB”) is to solicit bids for the NorthCampus Abatement project.LOCATION OF THIS SOLICITATION: Submit a Bid for this solicitation through the HuskyBuy Portal:https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UConnFullSuite.CRITICAL DATES:Pre-Bid Conference Date and TimePre-Bid Conference LocationQ&A (RFI) Due Date and TimeBid Due Date and TimeScope Review Meeting (with lowestqualified Bidder)2/11/20268:30 AMBid Room, Procurement Services, 3 Discovery Drive,Storrs, CT 062692/20/20262:00 PM3/4/20262:00 PM3/6/20262:00 PMPRE-BID CONFERENCE: During the Pre-Bid Conference, the ITB and Scope of Work will be discussed. Therealso will be an opportunity to view existing conditions (if applicable). The Pre-Bid Conference is notmandatory, however, interested Bidders are strongly encouraged to attend.There are limited short-term and PayByPhone parking spaces around the University Business Servicesbuilding. The North Parking Garage is recommended to all vendors as parking on campus is at your ownConstruction GC-Trade ITB, July 2024Page 1 of 4risk. The North Garage parking is paid via online app (PaybyPhone or Flowbird) or at a kiosk and is requiredwhen parking vehicle and not when exiting the garage.REQUEST FOR INFORMATION QUESTIONS: All Requests for Information (“RFI”) questions are to be postedunder the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFIquestions emailed directly to the Procurement Agent will be accepted.CLARIFICATIONS, ADDENDA, and INTERPRETATIONS: Bidders shall promptly notify the University of anyambiguity, inconsistency, or error which they may discover upon examination of the plans, specifications,and contract documents.Any and all interpretations of the drawings, specifications, RFI Responses, contract documents, andsupplemental instructions, will be in the form of a clarification/addendum, and posted as part of theHuskyBuy sourcing event. Failure of a Bidder to receive any such clarification/addendum or interpretationshall not release a Bidder from the obligations under its Bid as submitted.BID OPENING: Bid openings are conducted via virtual conference at 2:15 p.m. on the due date. It is theresponsibility of the Bidder to request access to the bid opening prior to the bid due date and time viaemail to the Procurement Agent listed for this solicitation.CONSIDERATION OF BIDS: Cost Proposals received in response to this ITB are opened during a publicopening. To ensure the integrity of the bidding process, the Total Bid Amount and prices for anyAlternates are read at the bid opening. After the bid opening and before the contract award, the lowestresponsible Bidder is determined by adding together the Total Bid Amount plus any Alternates (additiveor deductive) accepted by the University. The University reserves the right to elect to implement some,all, or none of the Alternates (if applicable) set forth in this Bid, as may be in the best interest of theUniversity. Prices for Alternates are not negotiable since they are a component in determining the lowestresponsible Bidder.ELIGIBLE PREQUALIFIED BIDDERS: The following Contractors are prequalified and may submit a bid forthis Project:•Stamford Wrecking Company•Strategic Environmental Services IncPROJECT SCHEDULE/DURATION:•Anticipated Contract Issuance/Notice to Proceed: April 2026•Construction is planned to start: May 17, 2026•Substantial Completion: July 26, 2026LIQUIDATED DAMAGES: Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendarday shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to theSubstantial Completion of any portion of the work within the Contract Time.WAGE RATES: Prevailing Wages are required for this Project if the total cost of all work to be performedby the Contractor and Subcontractors is $100,000.00 or more and subject to Connecticut General Statutes§31-53, §31-54, and §31-55: https://www.cga.ct.gov/current/pub/chap_557.htm#sec_31-53.Construction GC-Trade ITB, July 2024Page 2 of 4PROJECT DESCRIPTION/SCOPE OF WORK: Drop light fixtures on each floor, remove all ACM floor tile andmastic, remove all non-ACM ceiling tiles, glue daubs and ACM skim coat from all dorm rooms. Remove allnon-ACM floor tile and mastic from all hallways.COST PROPOSAL: Submit a Cost Proposal utilizing the Form provided. No substitution of the Form ispermitted.MISCELLANEOUS REQUIRED DOCUMENTS: The Bid shall include the following documents:1. SEEC Form 10: Review the SEEC Form 10: Notice to Executive Branch State Contractors and ProspectiveState Contractors of Campaign Contribution and Solicitation Limitations (acknowledgment of receiptof the explanation of prohibitions) and upload the executed Form where applicable. The Form can befound at: https://seec.ct.gov/Portal/data/forms/ContrForms/seec_form_10_final.pdf.2. Bidder Contract Compliance Monitoring Report: Review the Commission on Human Rights andOpportunities Bidder Contract Compliance Regulations Notification to Bidders and upload thecompleted Report where applicable. The Form can be found at: https://portal.ct.gov/-/media/chro/cc-documents/notificationtobidders.3. Bid Security: A bid security in the form of a bid bond, certified check or a treasurer’s or cashier’s checkissued by a responsible bank or trust company, payable to the University of Connecticut (referencethe attached bid bond form) must accompany all bids if the Total Bid Amount is over $50,000.00. Bidbonds must be issued by a surety licensed in Connecticut and listed on the Department of Treasury’sListing of Approved Sureties with an underwriting limitation of no less than the full amount of the bid.The bid security shall be in the amount equal to TEN PERCENT (10%) of the amount of the bid. In lieuof a bid bond or certified check, a letter of credit that shall be in the amount of TEN PERCENT (10%)of the total bid amount for a bid valued less than $100,000 and in the amount of twenty-five percent(25%) of the bid amount for any bid value that exceeds $100,000 may be submitted4. Bonding Capacity: Provide a letter from your bonding company or representative confirming bondingcapacity and include if they have ever had to complete or finance work on your behalf. Bondingcapacity shall be for, at a minimum, the Total Bid Amount submitted for this Project.CONTRACT: A draft of the contract has been provided with the solicitation documents. The Universityreserves the right to modify the contract or waive any informality as it deems to be in the best interest ofthe University. By submitting a Proposal, your Company accepts the contract and any modifications thatthe University deems necessary to it without exception. Proposers will be notified of any modificationsto the contract made by the University. Any exceptions to the contract submitted by the Proposer willnot be considered.GOOD FAITH EFFORTS PLAN: The Spending Allocation Goal for this Project is that (1) not less than thirtypercent (30%) of the Total Contract Price be awarded to subcontractors who are certified by theConnecticut Department of Administrative Services as “Small Business Enterprises” (“SBEs”) and (2) notless than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified bythe Connecticut Department of Administrative Services as “Minority Business Enterprises” (“MBEs”) (the10% Spending Allocation Goal for MBEs may be included in the 30% Spending Allocation Goal for SBEs).If the Contractor is an S/MBE, then any self-performed work may be included in the Spending AllocationGoal, however, self-performing MBE’s must still demonstrate good faith efforts to employ other MBEs assubcontractors and supplier of materials. The Contractor is responsible for ensuring that they, and theS/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. Failure to make goodfaith efforts will be subject to enforcement that may lead to withholding of contract payments,Construction GC-Trade ITB, July 2024Page 3 of 4disqualification from future bidding, and/or civil penalties and legal action by CHRO. For furtherinformation see: CHRO's Contract Compliance Program.Listed below is a sample of suggested categories (if applicable) and possibilities for the breakout of theschedule of values for inclusion of S/MBE participation:01 – General Conditions: temporary electric and wiring; cleaning02 – Existing Conditions: demolition and salvage; abatement03 – Concrete: sidewalks and flatwork05 - Metals: metal stairs and railings; miscellaneous metals; decorative metal06 - Woods Plastics and Composites: rough carpentry and blocking07 – Thermal and Moisture Protection: insulation; sealers and waterproofing08 – Openings: door hardware09 – Finishes: tile installation; acoustic ceilings; flooring installations; painting and coatings;firestopping10 – Specialties: signage12 – Furnishings: window treatments14 – Conveying Equipment: lifts23 – HVAC (Heating, Ventilating, Air Conditioning): HVAC duct insulation27 – Communications: low voltage cabling28 – Electronic Safety & Security: fire alarm and security wiring32 – Exterior Improvements: retaining walls; paving; fencing and gates; landscaping44 – Pollution and Waste Control Equipment: truckingEnd of Solicitation Information SheetConstruction GC-Trade ITB, July 2024Page 4 of 4
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Merryall Road Roadway Reconst...
Project ID: Title: Merryall Road Roadway Reconstruction & Improvement Project, State Project #0095-0261
Town of New Milford
Bid Due: 7/16/2026
New Haven Harbor Improvement ...
Follow New Haven Harbor Improvement Dredging, New Haven, CT Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/10/2026