Andrews High School Chiller Replacement
Project Information
- Bid Title
- Andrews High School Chiller Replacement
- Issuing Agency
- Guilford County Schools
- Location
- North Carolina
- Published Date
- Dec 11, 2025
- Closing Date
- Dec 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 6793
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
QuoteID Description Bids Closed Scope of Work 6793Andrews High School Chiller Replacement Andrews High School Chiller Replacement Andrews High School Chiller Replacement12/16/2025 - Attachment Preview
-
TRIAD ENGINEERING CONSULTANTS, INC.2638 Willard Dairy RdSuite 100(336) 338-8943ProvidingPlumbing, Mechanical andElectrical Engineering Services Since 1984High Point, NC27265admin@TriadEngMEP.comTO: All BiddersNovember 26, 2025TEC File No:2507RE: Chiller Replacement for Andrews High SchoolHigh Point, NCGCS Q#: 6793ADDENDUM No. 1:Information contained in this Addendum and the changes directed in the project Plans and/or Specifications herebybecome a part of the Contract. Bidders are instructed to acknowledge receipt of this addendum on the Bid Form. Thisaddendum is published to the official shared folder containing official Bid Documents for access by qualified bidders.Each Bidder should insure that all sub-bidders and suppliers have included the information contained in this addendum intheir pricing. The Bid and contract documents are clarified and/or amended as follows:GENERAL:1. See the PreBid Meeting Sign-in form included with this addendum.2. See the PreBid Meeting Minutes document included with this addendum.CLARIFICATIONS:noneSPECIFICATIONS:None.DRAWINGS:Sheet M0.1:1. Detail 4/M0.1:a. The key cylinder will also be included in the Door Hardware allowance. Ensure that the keying iscoordinated with the Owner’s current system. Add the following note to this detail: COORDINATE KEYCYLINDER WITH OWNER’S SCHLAGE KEYING SYSTEM BEFORE ORDERING.2. Detail 5/M0.1: Correct the note referencing Sheet M1.0 to reference M1.1. There is no M1.0 sheet in the set.Sheet M6.1:1. Add the document entitled Controls Description Supplement attached with this addendumEND OF ADDENDUMAttachments:PreBid Sign-in SheetPreBid Meeting MinutesControls Description Supplement(1 page)(6 pages)(4 pages)2507_Addendum01.docx1 of 1TRIAD ENGINEERING CONSULTANTS, INC.2638 Willard Dairy RdSuite 100(336) 338-8943ProvidingPlumbing, Mechanical andElectrical Engineering Services Since 1984High Point, NC27265Email: Admin@TriadEngMEP.comNovember 25, 2025Meeting Date: November 25, 2025Chiller Replacement for Andrews High School1920 McGuinn Dr. High Point, NC 27265TEC File No:GCS Quote #25076793PreBid Conference MinutesIWelcome and IntroductionsPerry GulledgeTracy NanceBrooke ScottTriad Engineering Consultants, Inc.GCS Building ServicesBrownstone GroupIIReview of Bidding Requirements1) Bids will be received in by Guilford County Schools in conference room 2A at 714 Green Valley Rd. inGreensboro, NC 27408 until 3:00pm Tuesday December 16, 2025. Bids may be delivered in person, bymail or by shipping carrier. Faxed or e-mailed bids will not be accepted. Bids will be publicly opened andread aloud.2) Bid is formal and will be conducted under the formal procedure.3) Attendance at the PreBid Meeting is not mandatory but is highly recommended for Bidders to have theopportunity to ask questions and to become familiar with the existing site and conditions. Lack of familiaritywith existing site or conditions will not be accepted as a basis for adjustments to the contract price. Seecontact information appearing later in these minutes to make arrangements for visiting the site after thismeeting.4) Bids must be submitted in a sealed envelope and marked “Confidential Bid Enclosed for Andrews HighSchool”.5) Bid is for a single prime contract and all work required for the project is to be included in bid price.6) Bids will be accepted from licensed contractors only. Bidders must hold the appropriate license for the workof the project in accordance the NC General Statutes and state licensing boards.7) A 5% Bid Bond is required to be submitted with the bids.8) A 100% Performance Bond and Labor and Material Payment Bond will be required for the full amount ofthe contract.9) Include all sales taxes, equipment rentals, supplies, transportation, etc in the bid price.10) Be sure to complete the Bid Form in its entirety and sign the bid. The signature must be of an officer of thecompany or other individual duly authorized to commit the company to a contract.11) Include the applicable M/WSEDBE forms with the Bid Form. Failure to do so could result in the bid beingruled non-responsive and possibly rejected. Refer to the section entitled PARTICIPATION BY WOMENAND MINORITY OWNED BUSINESSES (DK-P) of the Project Manual for requirements. Be sure to submitbackup documentation to support items claimed for Good Faith Efforts with the Bid. Backup documentationshould be specific and detailed to clearly support the items checked on Affidavit A. Note the 5 documentswith the header stating “Attach to Bid”. All of these sections that are applicable to the bidder’s status must2507_PreBid_Minutes.docx1 of 6be completed and submitted with the bid. Guilford County Schools goal for MWSEDBE participation is12.46%.12) Note that if you check Items 1 or 7 in the Good Faith Efforts Checklist, all of your supporting documentationrequired to demonstrate compliance for these items must be included with your bid. If this documentationis not submitted with the bid the or is found to be lacking, the points will be deducted from your Good FaithEfforts score. If your score then falls below 50 points, the bid will be rejected as non-responsive. Items 2-6 require submittal of support documentation within 72 hours after being notified as being the lowestresponsible responsive Bidder. Bidders are encouraged to obtain the required score utilizing Items 2-6 or to exceed the minimum score to reduce the likelihood of disqualification due to a deficiency in thedocumentation that is required to be submitted if you check Items 1 or 7.13) Do not modify the Bid Form in any way. Do not include any instructions for changing or interpreting the bid.The prices listed on the appropriate lines of the Bid Form will be prices submitted for the work. Anyinstructions to increase or decrease the amounts listed on the Bid Form will be disregarded and the priceslisted on the Bid Form will be considered as the official bid prices offered. If there is a discrepancy betweenthe price in numerical figures and the written-word price, the written-word price shall govern.14) Bidders must make an entry for each of the Subcontractors listed on the Bid Form. Do not leave any ofthese lines blank. Enter “N/A” on the lines for any Subcontractor trades that are not used or not applicablefor this project.15) Alternate bids or unit pricing may be added before bids are received. Provide pricing for each bid alternateor Unit Price on the appropriate line of the Bid Form. The work in the alternates would either be includedin the initial contract or may be added to the contract scope at the price listed on the Bid Form within 60days of the contract date. Should the work be added after 60 days from the contract date any changes inthe price for the work will be negotiated based on the original quote and documentation of price increasesor additional work required due to the delay in adding the work to the contract.16) Currently there are two alternates consisting of the following:a) Alternate #1: State the price to add to the Base Bid Amount to extend the chiller parts, labor andrefrigerant warranty for years 6 through 10.b) Alternate #2: State the price to add to the Base Bid Amount for the additional cost to access fourteen(14) existing air handling units and close the chilled water coil bypass valves including eight (8) units inmechanical rooms plus six (6) exposed units mounted high in the gym. Include lift rental if required andfloor protection to access the exposed high-mounted gym units.17) Following receipt of bids, the lowest responsible responsive bidder will be identified by review of the biddocuments who may be contacted for any additional MWBE documentation needed. The project mustthen receive Board of Education approval before a contract can be awarded. Upon approval by theBoard to award a contract for the project, the contracts will be delivered electronically to the contractor forsignature, bonds and insurance certificates. Upon receipt of signed contract with bonds and insurancecertificates, the contract will be delivered to the Board for signature.18) This project is funded from the 2022 School Bond Program funds. There is no federal funding used forthis project.19) If there is no delay in receipt of bids and no complications with the bids submitted the anticipated date forBoard approval of bids is January 13, 2026, followed by issuance of a contract to the Low Bidder. Theexpected date for a fully executed contract is February 12, 2026.20) The Substantial Completion date for work related to cooling system operation is March 1, 2027 withliquidated damages of $2,000 per calendar day.221) The Final Completion Date for the entire project is April 5, 2027 with additional liquidated damages of$1,000 per calendar day.22) All Addenda will be published to the Addenda folder in the shared online Project Link and may also bepublished to the Purchasing Department website under the GCS bid number 6793 . Bidders will beresponsible for checking the official online Project Link for addenda and ensuring that all subcontractorsand suppliers affected by the information contained in the addenda receive the information. Note thedocument in the Project Folder titled “Summary Document” in the link will be maintained to list the Bid Date,Addenda Issued, and any drawing revisions issued. These documents can be found in the respective folderin the link. Addenda will not be transmitted individually to Bidders, suppliers, or plan rooms. Ensure thatyour subs and suppliers have the latest information when pricing the work. Anyone obtaining informationfrom sources other than the Project Link does so at their risk of not having the latest information.23) Note that if there are questions asked that are not addressed in the contract documents or that requirechanges or interpretations to the documents, these questions and answers will be published in theaddenda. There will not be a separate document or location to search for questions and answers.24) Work within utility rooms, and outside the building on the project site can begin after the contract is executedprovided the work does not disturb the educational environment or block access for student pickup or dropoff; scheduled sports activities, maintenance activities or deliveries to the facility. Work in other areas ofthe building must be performed after hours, over weekends, school holidays or school breaks unless otherarrangements can be made with staff. No work will be allowed anywhere on the site during school hourson testing days. Work and building access must be closely coordinated with the school principal ordesignated representative. Factor these conditions into the bid price for all work that would be affected.25) The school campus will be occupied throughout the school year and the site must be maintained in safeand usable condition for each work day. GCS Staff will be on a 4-day work week (Mon-Thurs) duringSummer Break.26) The existing chiller must remain in operation until October 15, 2026.27) The drive and dock area must remain clear for deliveries during working hours throughout the contractperiod. Work that would block access must be performed after hours, over breaks, unless it can becoordinated with staff to occur during the school day.28) Plans will be submitted to local authorities for permit review by the Contractor. The successful bidder willsubmit drawings, pay for and pick up the permits for the project and ensure that all subcontractors obtainpermits that are required.29) The 2026-2027 school holiday and break schedule for the school is as follows (subject to change if anyweather makeup days are required):a) August 17:First day of school for teachers.b) August 24:First day of school for students.c) November 11Veterans Dayd) November 25-27:(Holiday) Thanksgivinge) Dec 21-Jan 2:Winter Breakf) January 18:(Holiday) M.L. Kingg) March 22-March 26 Spring Break.h) May 31:(Holiday) Memorial Dayi) June 10:Last day of school for students (unless makeup days are added)3
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Fabrication Lab HVAC Renovati...
Institution NC School of Science and Math Institution URL for Additional Information about
North Carolina State University
Bid Due: 7/07/2026
DSS Chiller, Cooling Tower, a...
Bid Number: FB26251 Bid Title: DSS Chiller, Cooling Tower, and Boiler Replacement Category:
City of Winston-Salem
Bid Due: 7/07/2026