RFP: Sedamsville Residential Renovations
Project Information
- Bid Title
- RFP: Sedamsville Residential Renovations
- Issuing Agency
- The Port Hamilto County
- Location
- Ohio
- Published Date
- Dec 8, 2025
- Closing Date
- Jan 6, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Due Date: January 6, 2026The Port and Landbank are excited to release a Request for Proposal (RFP) to general contractors to renovate four properties in the Cincinnati neighborhood of Sedamsville . This opportunity is a continuation of our multi-year commitment to revitalizing this historic neighborhood. It is also an example of The Port and Landbank's dedication in partnering with local real estate development firms and professionals of all sizes to create affordable housing opportunities for our neighbors.Please review the RFP and the attached drawings. The RFP has instructions on the Request for Information (RFI) process if you require any additional information; this is located in Section 4. Please reach out to Andrew Fisher if you need additional accommodations or information.Representatives of The Port and Landbank will conduct a site walk-through at 9:00 AM on Wednesday, December 10, 2025, beginning at 654 Steiner St, Cincinnati, OH 45204 before proceeding to other properties. A representative from interested General Contractors is strongly encouraged to attend to assess the existing property conditions and review Section 3. Contractors will be able to tour each address with members of The Port from 9:00 AM to 11:00 AM.Contractors who cannot attend this event or would like additional time to tour subcontractors, vendors, or partners through the properties may contact me to coordinate times, access, and liability forms.Thank for taking the time to review and please feel free to share this opportunity to other interested and qualified parties.Refer all inquiries and submissions to:Andrew Fisher
afisher@cincinnatiport.org
513.632.3723
The Port Authority of Greater Cincinnati Development Authority
3 East 4th Street, Suite 300
Cincinnati, Ohio 45202
- Attachment Preview
-
Hamilton County LandbankSedamsville Residential RenovationsRequest for PricingTable of Contents:• Section 1: Introduction• Section 2: RFP Schedule• Section 3: Scope of Work• Section 4: Requests for Information• Section 5: Program Eligibility• Section 6: Proposal Requirements• Section 7: Proposal AdministrationThe Landbank | The Port of Greater Cincinnati Development Authority221 East Fourth Street, Suite 200Cincinnati, OH 452021 of 16Section 1 – IntroductionThe Port is leading a long-term effort to preserve and reinvest in Sedamsville, creating new opportunities forfamilies to plant roots in this historic hillside community. Since 2021, The Port has worked alongside the City of Cincinnatiand the Hamilton County Landbank to acquire and stabilize local housing stock, laying the foundation for increasedhomeownership. Together, they purchased a 65-property portfolio out of receivership, 23 structures, 41 vacant lots, andone parking lot, for strategic redevelopment. Continued acquisitions through tax lien certificates have expanded theportfolio to 98 properties. The Port’s CARE model will guide the renovation and sale of 18 homes, priced between$120,000 and $180,000, balancing quality and affordability.While addressing modern housing needs, The Port remains committed to protecting Sedamsville’ s historiccharacter. Many of the neighborhood’s homes date back to the 1800s, and each project emphasizes architecturalpreservation and energy-efficient updates. In partnership with MSA Design, The Port is also helping to establish an OhioHistorical Marker celebrating Sedamsville’s legacy as one of Cincinnati’s earliest hillside neighborhoods. Throughthoughtful renovation and design, The Port aims to ensure that new development reflects the community’s cultural andhistoric identity.By combining resident support with targeted redevelopment, The Port is acting as a “market maker,” addressingyears of disinvestment and positioning Sedamsville for sustainable, inclusive growth rooted in community pride andhomeownership.The Port is seeking proposals from qualified and registered General Contractors to complete remodels of theproperties listed in Section 2, according to the standards listed in Section 3.This RFP is being emailed to prospective bidders and will be posted on both The Port’s and the Landbank’swebsites (www.CincinnatiPort.org and www.HamiltonCountyLandbank.org). The Port encourages all qualified firms toapply.AddressesAddresses659 Sedam St, Cincinnati, OH 45204745 Sedam St, Cincinnati, OH 45204632 Delhi Ave, Cincinnati, OH 45204654 Steiner Street, Cincinnati, OH 45204Parcell ID153-0002-0145-00153-0003-0091-00153-0002-0062-00153-0002-0199-00Nothing in this RFP shall be construed to create any legal obligation on the part of the Port or any respondents. The Portreserves the right, in its sole discretion, to amend, suspend, terminate, or reissue the RFP in whole or in part, at any stage.In no event shall the Port be liable to respondents for any cost or damage incurred in connection with the RFP process,including, but not limited to, any costs, expenses, or fees related to this RFP. All supporting documentation submitted inresponse to this RFP will become the sole property of the Port. Respondents may also withdraw their interest in the RFP, inwriting, at any point in time as more information becomes known.The Landbank | The Port of Greater Cincinnati Development Authority221 East Fourth Street, Suite 200Cincinnati, OH 452022 of 16Section 2 – RFP ScheduleDate of RFP ReleaseContract Information Session*Requests for Information DueProposal DueNotification of AwardCommencement of WorkDecember 5th, 2025December 10th, 2025* (9:00AM – 11:00AM)December 17th, 2025January 6th, 2026January 14th, 2026February 2nd, 2026*Site walk-throughs will be held on December 10th 2025, at 9:00AM. Members of the Real EstateDevelopment Team from The Port will be onsite at 654 Steiner St, Cincinnati, OH 45204. A representative frominterested General Contractors is strongly encouraged to attend, to assess the existing property conditions andreview Section 3. Contractors will be able to tour each address with members of The Port from 9:00AM to 11:00AM.Contractors who cannot attend the event or would like additional time to tour subcontractors, vendors or partnersthrough the properties may email Andrew Fisher (afisher@cincinnatiport.org) to coordinate times, access andliability forms.Section 3 – Scope of WorkThis Scope of Work (SOW) outlines the requirements for the renovation of single-family structures in theneighborhood of Sedamsville. The selected contractor will be responsible for all aspects of construction, includingpermitting, site management, utility coordination and billing, final finishes, and project closeout, in strict accordancewith the provided plans and specifications included in this RFP.I. Generala. Drawings and Specifications: All work must be performed precisely based on the drawings andspecifications included in this RFP. This includes, but is not limited to, all construction divisionsfrom site work to finishes, utilities, foundations, structural framing, exterior envelope, roofing,interior framing, drywall, flooring, painting, millwork, specialties, plumbing, HVAC, electrical,and landscaping.b. Permit Management: The contractor is also responsible for assuming management of theexisting City of Cincinnati-issued building permit and must obtain all other required andnecessary permits, pay all associated fees and costs, coordinate all regular and specialinspections, and handle any other required regulatory matters.c. Site Management: The contractor will be responsible for the provision and management of alldumpsters and waste disposal throughout the project lifecycle, ensuring compliance with localregulations. The sites will always be maintained and safe while being respectful of theneighboring community.i. Street Cleaning: One street cleaning must be performed upon substantial completion ofthe project as approved by the Landbank/Port staff. Additionally, the contractor will berequired to perform street cleaning if soil and erosion control practices fail, asdetermined by the Landbank/Port staff.d. Utilities: Upon contract award, the selected contractor will be required to transfer all projectThe Landbank | The Port of Greater Cincinnati Development Authority221 East Fourth Street, Suite 200Cincinnati, OH 452023 of 16utility accounts into their firm's name and maintain all associated payments until the point ofsubstantial completion.e. Construction Schedule: Upon award of the contract, the contractor must provide The Landbankwith a comprehensive overall construction schedule. This schedule should include keymilestones, critical path activities, and projected completion dates for each major phase ofwork. The contractor shall also provide regular updates on project progress as mutually agreedupon.f. Address Specific Anomalies: Each interested contractor is responsible for reviewing the address-specific set of drawings, identifying all unique details or requirements, and incorporating thenecessary work into their distinct, tailored bid for that specific address.g. Value Engineering and Material Selectionsi. Value Engineering (VE): Proposers are strongly encouraged to submit value engineeringproposals that offer cost savings or enhanced project value without compromisingquality, durability, or the project's affordable housing objectives. Each value engineeringitem must be clearly identified as a Voluntary Alternate on the proposal, with a detaileddescription of the proposed change, its cost impact, and any effects on the schedule orperformance.ii. Finish Materials and Owner Approval: All finish materials and color selections are to besubject to The Landbank’s review and final approval. Bidders should assume standard,durable, and cost-effective building finish materials suitable for quality housing, asdetailed in the plans and specifications.iii. Finish Schedules: A schedule of preferred finish selections is included in each drawingand should be used as a guide to contractors.h. Compliance and Quality Assurancei. Building Codes and Regulations: All construction of the homes shall strictly conform toall applicable City of Cincinnati Building Code criteria, including but not limited tostructural, electrical, plumbing, mechanical, and fire safety codes. The contractor isresponsible for all inspections required by the city and for addressing any deficienciesidentified.ii. Safety Standards: The contractor shall adhere to all Occupational Safety and HealthAdministration (OSHA) regulations at all times. This includes maintaining a safe workenvironment, providing appropriate personal protective equipment (PPE), andimplementing a comprehensive safety plan for all on-site personnel and visitors.iii. Quality of Materials and Workmanship: The contractor warrants that all materialsfurnished will be of good quality and new, conforming to the requirements of thecontract documents. All work must be performed in a professional and workmanlikemanner, consistent with industry standards and best practices.1. All extended manufacturer's warranties for installed products and systems (e.g.,roofing, windows, HVAC equipment) must be provided to the owner uponcompletion of the project.2. The contractor shall furnish owner’s manuals for all installed equipment andsystems, including warranty information.i. Project Closeout and Warrantyi. Final Retainage: A final retainage of 10% (ten percent) of the total project budget mayThe Landbank | The Port of Greater Cincinnati Development Authority221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 16be held by The Port until both a "Certificate of Occupancy" or comparable equivalent,issued by the City of Cincinnati, and a final inspection walkthrough with a representativeof The Port have been successfully completed.ii. Contractor's Warranty: The contractor shall provide a one-year warranty on all laborand materials from the date of substantial completion, ensuring the project remainsfree from defects in workmanship and materials. This warranty shall cover anydeficiencies that arise due to faulty construction or materials during this period.iii. The site and work area must be clean. Trade contractors are required to clean up trashdaily and organize materials, tools, ladders, or any other items required to completetheir work in a safe and orderly manner.iv. Additional Insured will be The Port of Greater Cincinnati Development Authority (aslisted on the first page of the contract).v. Field measuring and quantity takeoffs are the responsibility of each contractor's scopeof work.vi. Any contractor digging on the project is required to have utilities marked before digging.Utility marking is the responsibility of the contractor doing the digging.II. Construction Divisions - Please review the drawing set in detail, noting that while many of the items aresimilar in each address, there are nuances and differences in each address. Items required below thatare not shown on the drawings should also be included in the proposal.III. The drawings and scope of work are meant to be complimentary. Where discrepancies do exist, thecontractor may be required to take the more stringent, difficult and/or expensive approach required bythe documents.IV. The notes on the drawings and scope of work may require materials or work from divisions other thanwhere they occur. Contractors are responsible for the work described regardless of where organized oroccurring.ADDRESS SPECIFIC ANOMALIES ARE CALLED OUT AFTER THE DIVISIONS SECTION IN THIS RFP-PLEASE PAY CLOSE ATTENTION TO THE ENTIRE DOCUMENTV. Cleaninga. All labor, material, and equipment necessary for maintaining a clean site during constructionand final cleanings upon completion of the project, with approval of The Landbankb. All final cleaning work includes leaving all finished surfaces and fixtures free of soil, dirt, smears,and contaminants.c. The windows must be cleaned and free of smears, dirt, and other contamination uponcompletion of the project.d. A new furnace filter must be installed at owner turnover.e. Ductwork must be fully protected during construction and professionally cleaned prior to ownerturnover.VI. Selective Demolitiona. All labor, material, and equipment necessary for demolition of any material or structure perattached drawings or further demolition to complete renovation per drawing.b. Contractors abide by OSHA standards, including but not limited to personal protectiveequipment and fall protection, along with hard hats at all times.c. Contractors are responsible for safely removing any hazardous materials.The Landbank | The Port of Greater Cincinnati Development Authority221 East Fourth Street, Suite 200Cincinnati, OH 452025 of 16
- Commodity Codes
-
- NAICS 236118Residential Remodelers
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Islamic Religious Services - ...
Solicitation ID: SRC0000036259 Solicitation Name: Islamic Religious Services - DRC260119 - TOCI Original
State Government of Ohio
Bid Due: 7/10/2026
G-004 Pre-Solicitation Notice...
Follow G-004 Pre-Solicitation Notice for Homeless Care for Homeless (HCHV) Services Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/08/2026