Replacement of Asbestos Flooring at George L. Dilworth Middle School
Project Information
- Bid Title
- Replacement of Asbestos Flooring at George L. Dilworth Middle School
- Issuing Agency
- Washoe County School District
- Location
- Nevada
- Published Date
- Jan 29, 2026
- Closing Date
- Mar 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-65-B-01-BC
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
×Project: Replacement of Asbestos Flooring at George L. Dilworth Middle School
Project #:
26-65-B-01-BCScope of Work:Replace carpet and base in classrooms E-6, E-10, E-12, and W-7. Includes the demolition and removal of existing carpet, resilient base, floor tiles, and adhesives.
Remove the floor tiles and base, and replace with quartz tiles in rooms 3, 44, 54, 73, 75, and 96. Includes demolition and removal of resilient base, floor tiles, and adhesives. Move and store furniture and other items as required, to facilitate flooring installation. Repair all damage caused by demolition of existing flooring and flooring installation as drawn and specified. Asbestos containing materials are present.
Sealed bids for the Replacement of Asbestos Flooring at George L. Dilworth Middle School will be received by the Washoe County School District’s (WCSD) Purchasing Department located at the Brown Center 14101 Old Virginia Road, Room #0, Reno, NV 89521, until 2:00 p.m., (Local Time) on March 2, 2026. The bids will be opened publicly via a TEAMS Meeting at 2:30 pm (local time).
https://teams.microsoft.com/meet/2383377830236?p=qW1C85xoYG8GhHg4oe
Meeting ID: 238 337 783 023 6
Passcode: F4TD74WY
There will be a NON-MANDATORY Pre-Bid Meeting held at 2:30 p.m. on February 13, 2026, at George L. Dilworth Middle School (Meet in Front of the Office) 255 Prater Way, Sparks, NV 89431. Due to access and coordination involved in this project we highly recommend that contractors walk the project site that we are making available.
Estimate:Range Low $204,525.00 High $249,975.00 Force Account $34,000.00 Milestones:
* - All times are Local TimeAdvertisement Date: Thu 01/29/2026 Pre-Bid Meeting: Fri 02/13/2026 2:30 PM * This meeting is Non-Mandatory
Location:
George L. Dilworth Middle School
(Meet in Front of the Office)
255 Prater Way
Sparks, NV 89431
Question Deadline: Fri 02/20/2026 4:30 PM * Bid Due Date: Mon 03/02/2026 2:00 PM * Attached Documents
Secure Documents
Note: By downloading "Secured Documents" you will be added to the Planholders list.Notes:See Scope of Work for details on Bid Opening and Pre-Bid Meeting. - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238330Flooring Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Demolition of Edward L Pine M...
xProject: Demolition of Edward L Pine Middle School Project #: 26-112-B-06-BC Scope of
Washoe County School District
Bid Due: 7/13/2026
CSN North Las Vegas Campus Cl...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Nevada Government eMarketplace (NGEM)
Bid Due: 7/08/2026