City of Woodstock Gould Street Water Main Replacement
Project Information
- Bid Title
- City of Woodstock Gould Street Water Main Replacement
- Issuing Agency
- Woodstock city
- Location
- Illinois
- Published Date
- Jun 4, 2025
- Closing Date
- Jun 26, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: City of Woodstock Gould Street Water Main Replacement
Category: Bids Status: Open Description: NOTICE is hereby given sealed bids will be received by the City of Woodstock for the project entitled “Gould Street Water Main Replacement” until 10:00 am on June 26, 2025, at the City Hall, 121 W. Calhoun Street, Woodstock, IL 60098. The Bids will be publicly opened and read aloud immediately afterwards in the Council Chambers.
Bids shall be received in a sealed envelope addressed to:
City of Woodstock
121 W Calhoun St.
Woodstock, IL 60098
The sealed envelope shall be marked in the lower left-hand corner EXACTLY as follows:
BID: City Clerk
City of Woodstock
Gould Street Water Main Replacement
Provide all labor, services, and materials necessary for the construction of:
Approximately 1180 lineal feet of 8″ water main, 4 lineal ft of 12” water main, 83 lineal feet of 6″ water main, and 23 lineal feet of 4″ water main installed by open cut construction methods, including: trench excavation; water main pipe and fitting materials and installation; connection to existing water mains; water service connections; abandonment of existing water mains; pipe bedding; trench backfill; valves and valve vaults; fire hydrant assemblies including fire hydrant and auxiliary gate valve; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main replacement installation as shown, specified, or required.
Approximately 261 lineal feet of 8″ sanitary sewer, and 23 lineal feet of 10″ sanitary sewer installed by open cut construction methods, including: trench excavation; sanitary sewer pipe materials and installation; connection to existing sanitary sewers; pipe bedding; trench backfill; and all other work necessary for a complete and functional sanitary sewer installations as shown, specified, or required.
Approximately 15 lineal feet of 15″ storm sewer and 241 lineal feet of 12″ storm sewer installed by open cut construction methods, including: trench excavation; storm sewer pipe materials and installation; connection to existing storm sewers; storm sewer manholes, catch basins, and inlets; pipe bedding; trench backfill; and all other work necessary for a complete and functional storm sewer installations as shown, specified, or required.
Full depth pavement removal including HMA pavement removal and aggregate base course removal; installation of aggregate base course, HMA binder course, and HMA surface course; aggregate base repair; driveway removal and replacement; sidewalk removal and replacement; curb and gutter removal and replacement; erosion control; parkway restoration; traffic control; and all other work necessary for a complete and functional installation as shown, specified, or required.
https://www.trotter-inc.com/city-of-woodstock-gould-street-water-main-replacement
Publication Date/Time: 6/2/2025 10:00 AM Closing Date/Time: 6/26/2025 10:00 AM Contact Person: Document Inspection and Procurement
The Contract Documents may be inspected and purchased at:
Trotter and Associates, Inc.
38 W. Grand Avenue, Suite 300
Fox Lake, Illinois 60020
224/225–1300Contact Heidi Patla at h.patla@trotter-inc.com to schedule an appointment or to purchase the contract documents. Hard or electronic copies of the documents are available for purchase.
Payment for Contract Documents is nonrefundable and shall be payable to Trotter and Associates, Inc. in the form of cash, certified check or money order. No partial sets of specifications or drawings will be issued. The non–refundable cost for plans and specifications is $250.00 for a hard copy and $50.00 for an electronic copy. Addenda will be issued only to plan holders.
Plan & Spec Available: https://www.trotter-inc.com/city-of-woodstock-gould-street-water-main-replacement
Special Requirements: BID SECURITY
Each bid shall be accompanied by a bid bond, bank draft, cashier's check or certified check payable to the order of the City of Woodstock in an amount not less than five (5) percent of the amount of the bid, as a guaranty that the bidder will execute the contract, if it is awarded, in conformity with the bid form.The Successful Bidder will be required to furnish Performance and Completion and Payment Bonds on forms provided in the Specifications and Contract Documents, each in an amount equal to 100 percent of the contract sum.
Miscellaneous: Questions regarding the project received by 2:00 pm on June 23, 2025, will be answered by addendum. Questions submitted after this deadline may not be answered prior to the close of the bidding period. All questions shall be submitted in writing to:
Steve Cieslica, PE
s.cieslica@trotter-inc.com
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Z1DA--Modernize Damen (Bldg. ...
Follow Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 Active Contract Opportunity Notice ID
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/07/2026
Z1DA--Remodel ENT Procedure R...
Follow Z1DA--Remodel ENT Procedure Rooms CON 537-19-109 Active Contract Opportunity Notice ID 36C25226B0026
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/10/2026