La Vista Avenue AC Paving Restoration Project
Project Information
- Bid Title
- La Vista Avenue AC Paving Restoration Project
- Issuing Agency
- Carmichael Water District
- Location
- California
- Published Date
- Apr 17, 2026
- Closing Date
- May 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: La Vista Avenue AC Paving Restoration Project
Category: Design and Construction Management Services Status: Open Description: The Carmichael Water District La Vista Avenue Paving Restoration Project is located at La Vista Avenue, bound by Robertson Avenue and Marconi Avenue, Carmichael, CA. The project scope of work includes construction of onsite asphalt concrete (AC) pavement on the recently constructed water storage and pump station facility. As well as, grinding and paving La Vista Avenue, south of the water storage tank site (to Marconi Avenue), and complete restoration of a concrete driveway at 5605 Marconi Avenue. Construction of the facilities on the site have been completed, we are now finishing the site grading and AC paving.
A mandatory pre-bid meeting will be held on Tuesday, April 21, 2026 at 10:00 AM at La Vista Avenue next to the Carmichael Regional Library, 5605 Marconi Avenue, Carmichael, California 95608. At this meeting, representatives of the District will discuss the bid documents, site constraints, order of work and other items specific to the project. Attendance by contractors and/or subcontractors is mandatory, and all interested prospective bidders must attend in order for their bids to be accepted.
Sealed bids addressed to Carmichael Water District Attention Greg Norris, Engineering Manager will be received at the Carmichael Water District, 7837 Fair Oaks Boulevard, Carmichael, California 95608 on Thursday, May 7, 2026 until 2:00 p.m. Bids received after 2:00 p.m. will not be accepted and will be returned unopened. Accepted bids will be opened publicly at 2:00 p.m.
Publication Date/Time: 4/10/2026 12:00 AM Closing Date/Time: 5/7/2026 2:00 PM Related Documents: - Attachment Preview
-
FOR BIDDING PURPOSESforLA VISTA WELL AND TANK FACILITY PAVING PROJECTBIDS DUE: BY 2:00 p.m. on Thursday, May 7, 2026 at7837 Fair Oaks BoulevardCarmichael, CA 95608PUBLIC WORKS BID AND CONTRACT DOCUMENTSTABLE OF CONTENTS1 BIDDING REQUIREMENTS......................................................................................... 1-11.1 INVITATION TO BID ........................................................................................ 1-11.2 BID....................................................................................................................... 1-31.3 BID SCHEDULE................................................................................................. 1-51.4 DESIGNATION OF SUBCONTRACTORS ...................................................... 1-71.5 BID BOND .......................................................................................................... 1-91.6 EXPERIENCE QUALIFICATIONS................................................................. 1-111.7 NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER ANDSUBMITTED WITH BID (PUBLIC CONTRACT CODE SECTION 7106) .. 1-131.8 ACKNOWLEDGMENT OF INSURANCE REQUIREMENTS...................... 1-141.9 IRAN CONTRACTING ACT CERTIFICATION ............................................ 1-152 CONTRACT FORMS ..................................................................................................... 2-12.1 CONTRACT ........................................................................................................ 2-12.2 FAITHFUL PERFORMANCE BOND ............................................................... 2-32.3 PAYMENT BOND .............................................................................................. 2-62.4 CONTRACTOR'S WORKERS’ COMPENSATION CERTIFICATE (LABORCODE SECTION 1861) ...................................................................................... 2-83 ABBREVIATIONS AND DEFINITIONS...................................................................... 3-13.1 ABBREVIATIONS ............................................................................................. 3-13.2 DEFINITIONS..................................................................................................... 3-24 INSTRUCTIONS TO BIDDERS .................................................................................... 4-14.1 INTRODUCTION ............................................................................................... 4-14.2 PLANS ................................................................................................................. 4-14.3 LOCAL CONDITIONS....................................................................................... 4-14.4 FORM OF BID AND SIGNATURE ................................................................... 4-34.5 SUBMISSION OF BIDS ..................................................................................... 4-34.6 PREPARATION OF THE BID ........................................................................... 4-44.7 BID GUARANTEE ............................................................................................. 4-44.8 LIST OF SUBCONTRACTORS; SUBCONTRACTING LIMITS .................... 4-44.9 INTERPRETATION OF CONTRACT DOCUMENTS ..................................... 4-5Carmichael Water DistrictiLa Vista Well & Tank Facility Paving ProjectApril 10, 20264.10 MODIFICATION OF BIDS ................................................................................ 4-54.11 WITHDRAWAL AND RETURN OF BIDS....................................................... 4-54.12 RELIEF OF BIDDERS AFTER BID OPEN....................................................... 4-54.13 DISCREPANCIES............................................................................................... 4-64.14 SERVICING AND MAINTENANCE ................................................................ 4-64.15 DISQUALIFICATION OF BIDDERS................................................................ 4-64.16 AWARD OF CONTRACT.................................................................................. 4-74.17 CONTRACT BONDS ......................................................................................... 4-74.18 EXECUTION OF CONTRACT .......................................................................... 4-84.19 RETURN OF BID GUARANTEES .................................................................... 4-84.20 POWER OF ATTORNEY ................................................................................... 4-84.21 TIME OF COMPLETION................................................................................... 4-84.22 LICENSING REQUIREMENTS FOR CONTRACTORS ................................. 4-84.23 PREVAILING WAGES ...................................................................................... 4-94.24 BID PROTEST .................................................................................................... 4-94.25 INELIGIBLE CONTRACTORS AND SUBCONTRACTORS ....................... 4-104.26 AUDIT OF BID DOCUMENTS ....................................................................... 4-104.27 SUBSTITUTIONS DURING BIDDING .......................................................... 4-105 GENERAL CONDITIONS ............................................................................................. 5-15.1 INTENT OF CONTRACT DOCUMENTS/MEANS AND METHODS ........... 5-15.2 CONTRACTOR'S UNDERSTANDING ............................................................ 5-15.3 CHANGES IN THE WORK ............................................................................... 5-25.4 CLAIMS AND RESOLUTION OF DISPUTES ................................................. 5-55.5 GUARANTEE ................................................................................................... 5-115.6 AUTHORITY OF THE ENGINEER ................................................................ 5-115.7 DRAWINGS ...................................................................................................... 5-125.8 CONSTRUCTION STAKING AND SURVEYS ............................................. 5-135.9 PERMITS AND REGULATIONS .................................................................... 5-145.10 CONFORMITY WITH CONTRACT DOCUMENTS ..................................... 5-145.11 COORDINATION & INTERPRETATION OF CONTRACT DOCUMENTS5-145.12 SUBCONTRACTS ............................................................................................ 5-155.13 COOPERATION OF CONTRACTORS ........................................................... 5-15Carmichael Water DistrictiiLa Vista Well & Tank Facility Paving ProjectApril 10, 20265.14 SUPERINTENDENCE...................................................................................... 5-155.15 INSPECTION OF WORK................................................................................. 5-165.16 TESTS................................................................................................................ 5-185.17 REMOVAL OF REJECTED/UNAUTHORIZED WORK AND MATERIALS.. 5-185.18 DEDUCTIONS FOR UNCORRECTED WORK. ............................................ 5-185.19 EQUIPMENT AND PLANTS........................................................................... 5-185.20 CHARACTER OF WORKER ........................................................................... 5-195.21 SEPARATE CONTRACTS .............................................................................. 5-195.22 MATERIALS..................................................................................................... 5-205.23 STORAGE OF MATERIALS; STORAGE AREAS ........................................ 5-205.24 TRADE NAMES AND ALTERNATIVES....................................................... 5-205.25 CERTIFICATES OF COMPLIANCE............................................................... 5-215.26 ASSIGNMENT.................................................................................................. 5-215.27 DISTRICT ENTRY ON WORK SITE; RIGHT TO OPERATEUNSATISFACTORY EQUIPMENT OR FACILITIES ................................... 5-215.28 LANDS FOR WORK; RIGHTS OF WAY; CONSTRUCTION ROADS;TEMPORARY UTILITY SERVICES .............................................................. 5-225.29 PROGRESS SCHEDULE ................................................................................. 5-235.30 COMMENCEMENT AND PROGRESS OF THE WORK AND TIME OFCOMPLETION; CONSTRUCTION SEQUENCE; DELAYS ......................... 5-235.31 SUSPENSION OF WORK ................................................................................ 5-275.32 TERMINATION FOR DEFAULT; DAMAGES FOR DELAY; TIMELYEXTENSION ..................................................................................................... 5-285.33 RIGHTS OF DISTRICT UPON TERMINATION ........................................... 5-305.34 FAILURE TO COMPLETE THE WORK IN THE TIME AGREED UPON;LIQUIDATED DAMAGES .............................................................................. 5-315.35 CLEAN UP ........................................................................................................ 5-325.36 COMPLIANCE WITH LAWS; PERMITS; TAXES........................................ 5-325.37 PREVAILING WAGE PENALTIES; WAGE CLAIMS PROHIBITED ......... 5-335.38 LABOR DISCRIMINATION............................................................................ 5-335.39 EIGHT HOUR DAY LIMITATION; CERTIFIED PAYROLL REPORTS .... 5-345.40 EMPLOYMENT OF APPRENTICES .............................................................. 5-355.41 WATER POLLUTION ...................................................................................... 5-35Carmichael Water DistrictiiiLa Vista Well & Tank Facility Paving ProjectApril 10, 20265.42 PATENTS .......................................................................................................... 5-365.43 PUBLIC CONVENIENCE................................................................................ 5-375.44 UNDERGROUND UTILITIES......................................................................... 5-375.45 SAFETY AND TRENCHING........................................................................... 5-385.46 PROTECTION OF PERSON AND PROPERTY ............................................. 5-405.47 HAZARDOUS MATERIALS; HAZARD COMMUNICATION .................... 5-415.48 RESPONSIBILITY FOR REPAIR OF FACILITIES ....................................... 5-425.49 DISTRICT'S REPAIR ....................................................................................... 5-425.50 CONTRACTOR'S LICENSE NOTICE ............................................................ 5-425.51 PUBLIC WORKS CONTRACTOR REGISTRATION.................................... 5-435.52 INSURANCE..................................................................................................... 5-435.53 INDEMNITY AND DEFENSE OBLIGATION ............................................... 5-465.54 PROTECTION OF WORK ............................................................................... 5-475.55 ACCIDENTS ..................................................................................................... 5-495.56 NO PERSONAL LIABILITY ........................................................................... 5-495.57 MEASUREMENT OF QUANTITIES .............................................................. 5-505.58 SCOPE OF PAYMENT..................................................................................... 5-505.59 PROGRESS ESTIMATE................................................................................... 5-505.60 PROGRESS PAYMENTS................................................................................. 5-515.61 COMPLETION AND FINAL ACCEPTANCE ................................................ 5-555.62 FINAL PAYMENT ........................................................................................... 5-575.63 FINAL RELEASE ............................................................................................. 5-575.64 RIGHT TO WITHHOLD PAYMENTS............................................................ 5-605.65 WAIVER OF INTEREST.................................................................................. 5-605.66 SATISFACTION OF CLAIMS AND LIENS ................................................... 5-605.67 ASSIGNMENT OF ANTI-TRUST CLAIMS ................................................... 5-615.68 AVAILABILITY AND AUDIT OF INFORMATION ..................................... 5-615.69 INTEGRATION ................................................................................................ 5-625.70 COUNTERPARTS AND ELECTRONIC SIGNATURES............................... 5-625.71 WAIVER............................................................................................................ 5-625.72 REMEDIES NOT EXCLUSIVE ....................................................................... 5-625.73 SEVERABILITY ............................................................................................... 5-62Carmichael Water DistrictivLa Vista Well & Tank Facility Paving ProjectApril 10, 2026
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238910Site Preparation Contractors
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFB 24-25-63 Replacement of T...
RFB 24-25-63 Replacement of Two (2) Groundwater Monitoring Wells Deadline extended to: July
City of Visalia
Bid Due: 7/21/2026
RFB 24-25-63 Replacement of T...
RFB 24-25-63 Replacement of Two (2) Groundwater Monitoring Wells Deadline extended to: July
City of Visalia
Bid Due: 7/21/2026