Carteret County Department of Social Services Second Story Ceiling Modifications RFP

Project Information

Bid Title
Carteret County Department of Social Services Second Story Ceiling Modifications RFP
Issuing Agency
County of Carteret
Location
North Carolina
Published Date
Feb 14, 2026
Closing Date
Feb 27, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid Title: Carteret County Department of Social Services Second Story Ceiling Modifications RFP
Category: Public Buildings
Status: Open
Description:

Please see attached / related document(s) for all information.

Publication Date/Time:
2/13/2026 12:00 AM
Closing Date/Time:
2/27/2026 10:00 AM
Related Documents:
Attachment Preview
Request for Proposal
Carteret County Government
Department of Social Services
Second Story Ceiling Modifications
Issued: February 13, 2026
Submission Deadline: February 27, 2026 by 10:00 AM, EST.
Carteret County Government Department of Social Services Second Story Ceiling Modifications RFP
1
CARTERET COUNTY PUBLIC BUILDINGS
Phone: 252-648-7877
REQUEST FOR PROPOSAL
Date:
To:
Project Name:
02/13/2026
Interested Contractors
Department of Social Services Second Story Ceiling Modifications
Scope of Work:
Carteret County Government is seeking competitive proposals to install vinyl ceiling tiles, LED lighting, ABS
plastic supply vents, returns, exhaust covers, and grate covers for the second story of the Department of Social
Services located at 210 Craven Street, Beaufort, NC 28516.
The Contractor shall abide by the details and shall refer to the diagrams and associated pictures in addition to the
scope of work specified within the documents provided below.
General Scope of Work
Work shall consist of removing and replacing of all existing ceiling tiles, lighting fixtures, HVAC supply
vents, returns, grates and exhaust covers.
Replacement of damaged or missing sections of the existing grid system, including those that are bent,
rusted or have holes.
Adjustment and/or addition of the grid system to accommodate new materials or tiles.
Installation of new grid support ties as needed.
Modify new tiles to accommodate existing ceiling accessories.
All new materials listed shall be furnished and installed by the Contractor.
Ceiling Tiles
The Contractor shall install DuraClean Smooth White 2’ x 2’ vinyl ceiling tiles (or equivalent) that are
mildew and mold resistant.
Tiles shall be installed throughout all areas of the second story where existing ceiling tiles are currently in
place.
HVAC Fixtures
Install approximately twenty-six (26) new ABS plastic drop in HVAC supply vents that are white and
feature a three (3) cone face with an eight-inch (8”) boot. If an existing diffuser is equipped with a damper,
the new diffuser shall have a new damper installed. Trunk lines shall be reconnected.
Install approximately sixteen (16) 2’ x 2’ ABS plastic, white, quarter-inch (1/4”) perforated tiles with a
one-inch (1”) solid border for any existing returns, exhaust or grates. Any modifications to accept these
tiles shall be the Contractors responsibility.
Carteret County Government Department of Social Services Second Story Ceiling Modifications RFP
2
Lighting Fixtures
Remove the exiting lighting fixtures in the hallway and install approximately ten (10) four-foot by two-foot
(4’ X 2’) drop in flat panel LED fixtures.
Remove the existing lighting fixtures in all the offices identified, modify the grid system to accommodate
approximately fifty-five (55) two-foot by two-foot (2’ X 2’) drop in flat panel LED fixtures.
All new lighting fixtures shall be “Lithonia Lighting – Adjustable-Lumen Switchable White LED Panel
Light” (or equivalent).
Ensure all new lighting fixtures are set to the same color temperature, with a preferred setting of 3000k.
All new lighting fixtures shall remain in the same locations as the existing fixtures.
Ceiling Accessories
Existing ceiling accessories attached to the grid shall remain in place.
The Contractor shall cut out new ceiling tiles to fit any fixtures that are currently fixed to a ceiling tile. No
gaps shall be present.
All ceiling fire and safety fixtures being removed and reinstalled may require a specific schedule.
Scheduling for this task shall be coordinated with the County POC.
All existing ceiling fixtures shall remain in their current locations.
Schedule
Work shall be performed in phases outside normal business hours as dictated by the County POC.
Each phase of work shall be fully completed before the start of business.
At no time shall there be missing or open sections of the ceiling during normal business hours.
Interested Contractors shall contact the County POC below to schedule a site visit.
Cleaning and Miscellaneous
The Contractor shall provide all necessary labor, materials, Safety Data Sheets (SDS), equipment, and a
competent supervisor to oversee and direct work as outlined in these documents.
Protect all surfaces below the ceiling and all ceiling accessories from damage, dust and debris while
working. All associated debris shall be cleaned and hauled off at the end of each working day. All cleaning
equipment shall be provided by the Contractor.
Should the new tiles experience uplift from opening and closing doors, identify the tiles and apply clips or
tape to better secure the tiles to the grid system.
Replace any grid “T” bars to match the existing style, size and color.
All new material shall be installed per the manufacture’s recommendations and instructions.
All newly installed materials shall be fire-rated, if required.
Any and all measurements and material quantities shall be verified by the Contractor.
The Contractor shall submit any and all warranty documentation on behalf of the County.
Any damages caused by the Contractor shall be the Contractor’s responsibility to fix or replace at the
County’s discretion.
All new materials are subject to approval by Carteret County. If the Contractor proposes using materials
equivalent to those specified above, detailed submittals shall be included with the Contractor’s proposal
for review and approval.
The Contractor shall obtain the required permits, if required, give all notices to the County POC (including
a copy of any permits), and comply with all laws, ordinances, codes, rules and regulations bearing on the
conduct of the work. Permits shall be posted onsite at the project location. No time extensions shall be
granted or financial consideration given to the Contractor for time or monies lost due to violations of any
such ordinance, code, law or regulations that may occur.
Carteret County Government Department of Social Services Second Story Ceiling Modifications RFP
3
Carteret County Government Department of Social Services Second Story Ceiling Modifications RFP
4
Carteret County Government Department of Social Services Second Story Ceiling Modifications RFP
5
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Catholic Priest Services, Sey...

Follow Catholic Priest Services, Seymour Johnson AFB Active Contract Opportunity Notice ID A05976

DEPT OF DEFENSE

Bid Due: 10/16/2026

Residential Reentry Center Se...

Follow Residential Reentry Center Services and Home Confinement Services Located Within the City

JUSTICE, DEPARTMENT OF