Bunten Road Park Improvement Project
Project Information
- Bid Title
- Bunten Road Park Improvement Project
- Issuing Agency
- City of Duluth
- Location
- Georgia
- Published Date
- Jan 12, 2026
- Closing Date
- Jan 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Bunten Road Park Improvement Project
Addendum 4
December 10, 2025
:
January 22, 2026
11:00
AM
- Attachment Preview
-
Bunten Road Park Improvement ProjectAddendum #4 – Issued January 12, 2026Notes:1) This Addendum includes a revised Bid Form. The unit of measure for Bid Items 103and 207 has been changed to EA (Each).2) FOR ACCESS TO CAD FILES: Complete and sign Columbia’s Electronic FileRelease Waiver (last page of addendum) and return to erinwhite@columbia-engineering.com. A link to .dwg files will be emailed to you.Questions with Response from end of day on 12/23/2026 thru 01/09/2026:01/09/20261) There are 5 Bioretention Water Quality units called out on the plans, but there isno details or information on them, so we are unsure on how to price. Pleaseadvise.a. RESPONSE: Refer to SHEET C-7.6 (page 46 of 102) for:• Bioretention Area with Underdrain DETAIL• Bioretention Basin Outlet Structure DETAIL• Outlet Control Structure with Orifice DETAIL• Special Construction Underdrain DETAIL• Outlet Structure TABLE01/07/20261) Will the park be shut down during the period of construction? If not, pleaseprovide a phase plan for acceptable closure of portions of the park along with aduration of permitted closure.a. RESPONSE: A full park closure is not anticipated. The park is expected togenerally remain open to the public in accordance with the Bunten Road Park1 of 5Activity Schedule included in the RFP, which identifies seasonal and peak-use periods for park facilities, including but not limited to:• Soccer Fields (Fields 1–4):o Fall season: August–Novembero Spring season: March–Mayo Peak usage: Weekdays 5:30 p.m.–9:30 p.m.; Saturdays andSundays 9:00 a.m.–6:00 p.m.• Softball/Baseball Fields (Fields 5–6):o Season: August–Novembero Peak usage: Weekdays 5:30 p.m.–9:30 p.m.; weekends• Tennis / Pickleball Courts:o General play: evenings and weekendso Lessons/programming: daily, approximately 4:00 p.m.–9:00 p.m.• Activity Building (Community Center):o Peak usage: morning and evening activities year-round• Playground:o Peak usage: weekday afternoonsAs stated in the RFP Instructions and discussed during the pre-bid meeting,the Contractor is responsible for developing a detailed constructionschedule and phasing plan that identifies which portions of the park will betemporarily closed during each phase of construction. The proposed phasingplan shall minimize impacts to scheduled park activities, avoid peak usageperiods where feasible, maintain safe public access, and be coordinated withand approved by the City prior to implementation.Temporary closures of specific park areas will be permitted as necessary tosafely complete the work; however, extended or blanket closure of the entirepark is not expected.2) Does the City of Duluth have a spoil area where the materialsremoved/demolished may be deposited?a. RESPONSE: No. The City of Duluth does not have a designated spoil ordisposal area available for this project. The Contractor shall be responsiblefor off-site disposal of all excess or unsuitable materials in accordance withapplicable regulations.3) It appears the entire parking lot and roadway has either standard curb or headercurb. In areas where header curb exists are we to tie in flush with top headercurb or will overlay of header curb be permitted?2 of 5a. RESPONSE: As previously clarified, header curb shall not be overlaid.Pavement shall be milled as necessary to match existing grades, tie in flushwith the top of header curb, and maintain positive drainage. Care shall betaken to ensure smooth transitions and compliance with applicable gradingand drainage requirements.12/26/20251) What is the thickness for overlay of roadway & parking lot? Mix type also? Onoverlay of roads & parking lot. Does overlay need to match lip of curb? Or paveinto gutter? Edge mill to tie in?a. RESPONSE: (same as above) The asphalt overlay shall consist of 1.5 inches(compacted thickness) of 9.5 mm Superpave Type II hot mix asphalt, placedin accordance with Section 32 12 16 Asphalt Paving and GDOT Section400 requirements. A tack coat shall be applied prior to placement, andsmooth transitions shall be provided at all tie-ins including curb lines,driveways, and adjacent pavement. Overlay limits shall be adjusted in thefield as necessary to maintain positive drainage and existing curb and gutterfunction. Milling, if required, shall be performed as needed to receive thespecified overlay thickness while maintaining drainage.12/23/20251) Could you please provide the CAD file for the referenced project?a. RESPONSE: All bidders requesting CAD files must first execute a release formprior to receiving any digital files. Upon receipt of the signed release, CADfiles will be made available during the week of January 5.b. Release form is last page of Addendum.12/23/20251) What is thickness & type mix for overlay?a. RESPONSE: The asphalt overlay shall consist of 1.5 inches (compactedthickness) of 9.5 mm Superpave Type II hot mix asphalt, placed inaccordance with Section 32 12 16 Asphalt Paving and GDOT Section3 of 5400 requirements. A tack coat shall be applied prior to placement, andsmooth transitions shall be provided at all tie-ins including curb lines,driveways, and adjacent pavement. Overlay limits shall be adjusted in thefield as necessary to maintain positive drainage and existing curb and gutterfunction. Milling, if required, shall be performed as needed to receive thespecified overlay thickness while maintaining drainage.4 of 55 of 5
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
26-272 Deans Bridge Road MSW ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-72155-NONST-2026-000000194
State Government of Georgia
Bid Due: 8/06/2026
160-172 Dalrymple Road Stormw...
Project: 160-172 Dalrymple Road Stormwater Improvement Ref. #: 26-053 Type: ITB Status: Open
City of Sandy Springs
Bid Due: 7/07/2026