Addendums 1 & 2 for Bids 26 005 BOE WHS Locker Room Replacement of Heating Unit, 006 BOE HES Core Boiler Replacement, 007 BOE HES East House Boiler Replacement

Project Information

Bid Title
Addendums 1 & 2 for Bids 26 005 BOE WHS Locker Room Replacement of Heating Unit, 006 BOE HES Core Boiler Replacement, 007 BOE HES East House Boiler Replacement
Issuing Agency
Weston Public Schools
Location
Connecticut
Published Date
Apr 16, 2026
Closing Date
Apr 24, 2026
Government Level
State & Local
Status
Closed
Ref. #
Addendums 1 & 2 for Bids 26 005
Original Source
Join to Access Full Details
Attachment Preview
Addendum 1 for Bids #26-005, 26-006, and 26-007
1. Is this project prevailing wage? If the project is over $100,000 it would be
prevailing wage
2. Is a project schedule required with the bid? Yes
3. Is a DAS prequalification certificate required with the bid? No
4. What is the retainage? 15%
5. What are the daily liquidated damages? TBD
6. How many copies of the bid would you like us to submit? One hard copy and
One electronic copy on USB
7. Is this project CHRO? No
8. Are permit fees waived? No
9. Are we required to provide preventative maintenance once the job is done? If so,
for how long? No
Addendum 2 Bid #26-006 HES Core Boiler and Pumps
1. During the walkthrough it was pointed out that the work shall commence on
August 14th, 2026. Please confirm or clarify whether this is the case or not? 8/21
completion date.
2. Please confirm that we are required to hire ABS to do all of the associated
control work on the project? Yes
3. Are alternate manufacturers allowed for the boilers, pump, expansion tanks,
feeder etc.? Yes, as long as they are comparable or exceed what is currently in
place.
4. Is there glycol in the system? If so what percentage is it? No glycol.
5. Are the existing S/R hydronic isolation valves on the boilers to remain or to be
replaced? Replaced
6. Are the existing S/R hydronic isolation valves on the pumps to remain or to be
replaced? Replaced
7. Are we allowed to work during school hours if required? Yes
8. Are we to pump out the entire oil tank to turn over to the owner or just what is in
the existing oils lines within the mechanical room? Just what is in the existing oil
lines within the mechanical room.
9. In order to remove the existing 3-way valve are we going to be required to drain
down the entire system & refill/purge? Yes
10. Are the existing concrete housekeeping pads going to need to be extended or
will the existing ones be large enough for the new boilers? If the replacement is
larger than the existing pads, it is the contractors responsibility to extend the
pad.
Commodity Codes
  • NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Storefront Modifications

Storefront Modifications Storefront Modifications at 72 Church Street in New Haven. Start Date

State Government of Connecticut

Bid Due: 7/30/2026

Gymnasium Floor Replacements ...

Number 8857 Title Gymnasium Floor Replacements at Maloney and Bunker Hill Schools Available

City of Waterbury

Bid Due: 7/13/2026