Addendums 1 & 2 for Bids 26 005 BOE WHS Locker Room Replacement of Heating Unit, 006 BOE HES Core Boiler Replacement, 007 BOE HES East House Boiler Replacement
Project Information
- Bid Title
- Addendums 1 & 2 for Bids 26 005 BOE WHS Locker Room Replacement of Heating Unit, 006 BOE HES Core Boiler Replacement, 007 BOE HES East House Boiler Replacement
- Issuing Agency
- Weston Public Schools
- Location
- Connecticut
- Published Date
- Apr 16, 2026
- Closing Date
- Apr 24, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Addendums 1 & 2 for Bids 26 005
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Addendums 1 & 2 for Bids 26 005, 006, 007
pdf - Attachment Preview
-
Addendum 1 for Bids #26-005, 26-006, and 26-0071. Is this project prevailing wage? If the project is over $100,000 it would beprevailing wage2. Is a project schedule required with the bid? Yes3. Is a DAS prequalification certificate required with the bid? No4. What is the retainage? 15%5. What are the daily liquidated damages? TBD6. How many copies of the bid would you like us to submit? One hard copy andOne electronic copy on USB7. Is this project CHRO? No8. Are permit fees waived? No9. Are we required to provide preventative maintenance once the job is done? If so,for how long? NoAddendum 2 – Bid #26-006 – HES Core Boiler and Pumps1. During the walkthrough it was pointed out that the work shall commence onAugust 14th, 2026. Please confirm or clarify whether this is the case or not? 8/21completion date.2. Please confirm that we are required to hire ABS to do all of the associatedcontrol work on the project? Yes3. Are alternate manufacturers allowed for the boilers, pump, expansion tanks,feeder etc.? Yes, as long as they are comparable or exceed what is currently inplace.4. Is there glycol in the system? If so what percentage is it? No glycol.5. Are the existing S/R hydronic isolation valves on the boilers to remain or to bereplaced? Replaced6. Are the existing S/R hydronic isolation valves on the pumps to remain or to bereplaced? Replaced7. Are we allowed to work during school hours if required? Yes8. Are we to pump out the entire oil tank to turn over to the owner or just what is inthe existing oils lines within the mechanical room? Just what is in the existing oillines within the mechanical room.9. In order to remove the existing 3-way valve are we going to be required to draindown the entire system & refill/purge? Yes10. Are the existing concrete housekeeping pads going to need to be extended orwill the existing ones be large enough for the new boilers? If the replacement islarger than the existing pads, it is the contractor’s responsibility to extend thepad.
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Storefront Modifications Storefront Modifications at 72 Church Street in New Haven. Start Date
State Government of Connecticut
Bid Due: 7/30/2026
Gymnasium Floor Replacements ...
Number 8857 Title Gymnasium Floor Replacements at Maloney and Bunker Hill Schools Available
City of Waterbury
Bid Due: 7/13/2026