DOC Fort Dodge Correctional Facility Sally Port Operator Replacement
Project Information
- Bid Title
- DOC Fort Dodge Correctional Facility Sally Port Operator Replacement
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Nov 21, 2025
- Closing Date
- Dec 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP950500-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
RFP950500-01
Solicitation
DOC Fort Dodge Correctional Facility Sally Port Operator Replacement
Solicitation Type
Request for Proposals
CountyDescriptionDescription
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for replacement of the existing sally port gates (2) with new. Design to include looking at options for increasing the height and width of the gates.
Agency InformationNumber
005
Name
Administrative Services, Dept
Address 1
1305 E. Walnut St.
Address 2
City/State/Zip
Des Moines, IA 50319
Contact InformationContact Name
Construction Procurement
Contact Title
Michael Bradbury
Contact Email
Contact Phone Number
(515) 823-9327
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
11/21/2025 8:00:00 AM
Until
12/16/2025 2:00:00 PM
Documents/Attachments - Attachment Preview
-
RFP COVER SHEETAdministrative InformationSTATE OF IOWAREQUEST FOR PROPOSALSPROFESSIONAL DESIGN SERVICESRFP Number RFP950500-01Title of RFP DOC FDCF Sally Port Operator ReplacementAgencyIowa Department of Administrative Services (DAS)ProjectDescriptionThe State of Iowa Department of Administrative Services (DAS) is seeking professionaldesign services for replacement of the existing sally port gates (2) with new. Design toinclude looking at options for increasing the height and width of the gates.State Issuing Officer:Michael BradburyIssuing OfficerIowa Department of Administrative ServicesHoover State Office Building, Level 31305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327Email: construction.procurement@iowa.govPROCUREMENT TIMETABLE—Event or ActionDate/Time (Central Time)State Posts Notice of RFP on TSB website11/19/25State Issues RFP11/21/25Pre-Proposal Conference Location and Address:1550 L Street, Fort Dodge, IA 50501Is Pre-Proposal Conference mandatory? NoIf a map is needed, contact the Issuing Officer.12/3/25 at 2:00 PM1550 L StreetFort Dodge, IA 50501Questions, requests for clarification, and suggested changes fromRespondents due to Construction Procurement12/9/25 at 5:00 PMProposals Due12/16/25 at 2:00 PMRelevant WebsitesWebsite where Addenda to this RFP will be posted http://bidopportunities.iowa.govWebsite where contract terms and conditions are postedhttps://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdfNumber of Copies of Proposals Required to be Submitted: 1 DigitalFirm Proposal TermsThe minimum number of days following the deadline for submitting Proposals that the firm guarantees allproposal terms, including price, will remain firm is 120 Days.1.1 INTRODUCTIONThe Iowa Department of Administrative Services (DAS) is seeking proposals from qualified andavailable Design companies for services, per RFP cover page, and as outlined in the following(Sections 1.2 - 1.3). The successful proposal must:● For the staff that will be assigned, identify and describe qualifications, experience, and expertisein providing services for similar, or relevant, projects.● For the staff that will be assigned, provide a list of past similar or relevant projects completed inthe last 5 years, and include brief descriptions of what the projects entailed and a contact nameand phone number (reference). In addition provide estimated project cost, final project cost atacceptance, and whether it was completed on time.● Describe the composition of your team. Identify staff to be assigned. Provide resumes of keyindividual(s) including education, relevant experience, and certifications/licensing. NOTE: Anyresponding company and/or consultant that is part of the project design services cannot receivean award from the resulting request for bid of construction services.● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.● Describe computer program/software capabilities and expertise you utilize. Please describe yourexperience.● Provide a copy of your organizational chart.● Describe your experience, if any, on designing similar or relevant projects for the State of Iowa.● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.● Identify desired reimbursable charges (the State has limitations, per State of Iowa AccountingPolicies and Procedures 210.245), and all other charges.1.2 SCHEDULEDAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence.Execution of Designer’s ContractTentative Design Kick-Off Meeting100% Design Development Documents and Cost Opinion By50% Construction Documents and Cost Opinion By95% Construction Documents and Cost Opinion By100% Construction Documents and Cost Opinion ByContractor BiddingExecution of Contractor’s Contract(s)Submittals, Procurement and ConstructionClose outWeek of December 22nd, 2025Week of January 5th, 2026To Be CoordinatedTo Be CoordinatedTo Be CoordinatedFebruary 27, 2026March 2026March 2026April 2026 to August 2026September 20261.3 PROJECT DESCRIPTIONConstruction Manager (Boyd Jones) has been engaged for this Project to serve as advisor to DAS andto provide assistance in administrating the Contract for Design between DAS and the Designeraccording to separate contract between DAS and Construction Manager. DAS is currently seekingdesign services from qualified firms for a project consisting of replacement of the existing sally portgates (2) with new. Design to include looking at options for increasing the height and width of thegates.Design services shall include:1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for asample contract.1.3.2 All design disciplines necessary to complete the scope of work.1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with theOwner, Construction Manager, and Owner’s maintenance staff.1.3.4 Use of the State of Iowa‘s construction management software program for uploading alldocuments, submitting and approving pay apps, and construction administration. The costfor the use of the software is paid by the Owner.1.3.5 Field examination of the existing buildings.1.3.6 Design for scope of work. Provide material recommendations based on experience, quality,and price. Recommendations for replacements and upgrades shall include non-proprietaryequipment and systems.1.3.7 Designer shall include any and all survey work required for completion of project.1.3.8 Provide detailed input of design schedule to Construction Manager for overall incorporationinto master schedule.1.3.9 Designer shall assist Construction Manager in the evaluation of long lead times.1.3.10 Quality control during Design, Preconstruction and Construction.1.3.11 Compliance with all Federal, State, and applicable AHJ codes.1.3.12 Design review will be conducted at 100% schematic design, 100% design developmentdocuments, 50% construction documents, and 95% construction documents. Dates for designreview meetings to be coordinated with the design and project team and set no later than thedesign kickoff meeting. Review will be conducted with DAS Owner Representative,Construction Manager, and Facility Representative, at a minimum. Drawings, specificationsand cost opinions (if applicable) shall be provided at least five days prior to each reviewmeeting. An additional review meeting may be required at the end if there are discrepanciesin cost opinions or constructability review questions.1.3.13 Review with the Department of Inspections, Appeals, and Licensing’s Building Code Bureaufor approval of plans or exemption from review. All fees associated with the Bureau are theresponsibility of the designer.1.3.14 Develop and distribute agendas and meeting minutes for all meetings during the designphase.1.3.15 Construction cost opinions provided by the Design Professional team during Design (at 100%schematic design, 100% design development documents, 50% construction documents, and95% construction documents) with a Final Estimate for construction included with biddocuments, per Iowa Code.1.3.16 Construction drawings, specifications (the Construction Manager will produce Divisions 00and 01), and addenda.1.3.17 Provide bid alternates as determined during the course of design and bid packagedevelopment.1.3.18 Assist Owner and Construction Manager in obtaining bids from qualified contractors.1.3.19 Construction administration, including creation of the submittal and closeout items log,review of and responses to submittals and closeout documentation, RFIs, proposal requests,change orders, pay applications, periodic site visits, attendance at project meetings asrequired, participation / development of contractor punch list, closeout documentationreview and approval, certificates of substantial completion, and certificates of finalcompletion, as well as development of Architectural Supplemental Instructions for designrevisions, and punch lists within the construction management software program.1.3.20 Participation with project team during construction progress meetings as required. Designershall participate in bi-weekly OAC Meetings during the construction period.1.3.21 Field Observation reports, with photos, submitted for each site inspection within five (5) daysof the site visit.1.3.22 Acknowledgement that all documents are copyright to the State of Iowa and shall be turnedover to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendumswill be expected to be incorporated before final posting. Both the native computer formatand PDF versions shall be uploaded to the construction management software program at theend of the project.1.3.23 The Department requests lump sum pricing from the respondents to this RFP, with the lumpsum base scope price being inclusive of all reimbursables, such as printing, mileage and travelexpenses. The Department requests the fee proposal from the respondents to this RFP bebroken down as follows. These breakdown prices will be used as the schedule of values forbilling purposes.1.3.23.1 Schematic Design Documents1.3.23.2 Design Development Documents1.3.23.3 Construction Documents1.3.23.4 Bidding or Negotiation Assistance1.3.23.5 Construction PhaseInclude at a minimum, ten (10) site visits. Design kick off/Building evaluation, 100% designdevelopment document review meeting, 50% document review, Pre-bid meeting, Pre-construction kickoff, Construction Field Observation (2), Substantial completion/punch listdevelopment, Punch list/Final Completion approval, and one year warranty correction periodvisit. Design Review at 95% construction document development will be conducted viaconference call. Beyond these site visits, each proposing firm shall provide additional visits asthey see fit to complete the work of design. In addition to the lump sum pricing, theDepartment requests a unit price per construction inspection visit. This unit price will beadditive or deductive based on the number of actual visits made.1.4 ATTACHMENTS1.4.1 Aerial View of FDCFSally Port GateSally Port Gate
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 561210Facilities Support Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Veterinary Diagnostic Laborat...
Veterinary Diagnostic Laboratory-Phase 2-Lab Gas Piping Prebid Meeting: 7/10/2026 1:30:00 PM Prebid location:
Iowa State University
Bid Due: 7/23/2026
7th Avenue at Cedar River Wat...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Cedar Rapids
Bid Due: 7/08/2026