Pavement Reconstruction - Harvest Hill

Project Information

Bid Title
Pavement Reconstruction - Harvest Hill
Issuing Agency
Kenton County
Location
Kentucky
Published Date
Mar 22, 2026
Closing Date
Apr 10, 2026
Government Level
State & Local
Status
Closed
Ref. #
26-19
Original Source
Join to Access Full Details
Project Description


Project ID: 26-19

Title: Pavement Reconstruction - Harvest Hill

Addenda: 0

Release Date: 3/20/2026

Due Date: 4/10/2026

Follow
Pavement Reconstruction - Harvest Hill
Request For Bids
Public Works
237
Project ID: 26-19
Release Date: Friday, March 20, 2026
· Due Date: Friday, April 10, 2026 2:00pm
Posted Friday, March 20, 2026 10:00am
All dates & times in Eastern Time
Draft Response No Bid18 days, 16 hours, 49 minutes


Post Information

Posted At:Fri, Mar 20, 2026 10:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The Kenton County Fiscal Court is announcing a Request for Proposals (RFP) from KYTC prequalified contractors for the purpose of full depth concrete panel replacement and sidewalk ramp replacement in Harvest Hill Subdivision. This project will include work on the following streets: Harvest Hill Dr, Corn Row Ct, Open Meadow Dr, Straw Flower Ct, Crown Vetch Dr, Pumpkin Patch Way, Golden Valley Dr, Sundance Dr, Full Moon Ct, Lunar Dr, Kellnick Ct, Moonlight Way and Starlight Ln in Kenton County, Kentucky. Project limits are shown in Attachment C: LAYOUT SHEETS AND QUANTITIES. Existing pavement thickness for all routes may vary. The scope of work is detailed in the subsequent sections of this document and depicted in Attachment C: LAYOUT SHEETS AND QUANTITIES. Full depth reconstruction sections will consist of removing the existing JPC concrete, then replacing them in-kind with new JPC concrete as detailed in the Scope of Work sections of this document. The proposed typical section is to be constructed to match the existing grade of the roadway, or to ensure positive drainage.

The materials provided and the construction methods used in the performance of this contract shall be in accordance with terms and conditions of this solicitation and the 2019 Kentucky Standard Specifications for Road and Bridge Construction. Deviations from the KYTC Specifications will not be permitted unless expressly noted herein or made in writing by the County.

This contract shall have a fixed completion date of August 1, 2026 . Failure to complete the project on time will result in the County assessing liquidated damages according to KYTC Standard Specifications Section 108.09.

Do not bid an amount for Mobilization that exceeds 5 percent of the sum of the total amounts bid for all items in the Bid Proposal, excluding Mobilization, Demobilization, and contingent amounts established for adjustments and incentives. The County will automatically adjust any Bid Proposals that are in excess of this amount down to 5 percent to compare Bid Proposals and award the Contract. The County will award a Contract for the actual amount bid when the amount bid for Mobilization is less than 5 percent, or the County will award the Contract for the adjusted bid amount of 5 percent when the amount bid for Mobilization is greater than 5 percent. If any errors in unit bid prices for other Contract items in a Contractor’s Bid Proposal are discovered after bid opening and such errors reduce the total amount bid for all other items, excluding Mobilization, Demobilization, and contingent amounts established for adjustments and incentives, so that the percent bid for Mobilization is larger than 5 percent, the County will adjust the amount bid for Mobilization to 5 percent of the sum of the corrected total bid amounts.

Demobilization shall be paid as a lump sum for the entire project. Bid an amount for Demobilization that is a minimum of $1,000 and is a minimum of 1.5 percent of the sum of the total amounts bid for all other items in the Bid Proposal, excluding Mobilization, Demobilization and contingent amounts established for adjustments and incentives. The County will automatically adjust any Bid Proposal that is less than this amount up to the greater of $1,000 or 1.5 percent to compare Bid Proposals and award the Contract.



Timeline

RFB/RFP Date:
March 20, 2026
Question Submission Deadline:
April 3, 2026, 4:00pm
Question Response Deadline:
April 7, 2026, 4:00pm
Bid Opening Date:
April 10, 2026, 2:00pm
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Linens for Department of Parks

Description: Linens for Department of Parks Department: Office Of The Controller Buyer: Keith

State Government of Kentucky

Bid Due: 10/14/2026

6515--Intent to Sole Source B...

Follow 6515--Intent to Sole Source Brand Name or Equal Belimed Ultrasonic Cleaner Active

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 7/15/2026