5691 - Consultant Services for Wastewater Lift Station Supervisory Control and Data Acquisition (SCADA) Upgrades ** Addendum No. 1 Issued 4/30/2026 **
Project Information
- Bid Title
- 5691 - Consultant Services for Wastewater Lift Station Supervisory Control and Data Acquisition (SCADA) Upgrades ** Addendum No. 1 Issued 4/30/2026 **
- Issuing Agency
- City of Redding
- Location
- California
- Published Date
- May 1, 2026
- Closing Date
- May 18, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Open Date Description Close Date
April 17, 2026
5691 - Consultant Services for Wastewater Lift Station Supervisory Control and Data Acquisition (SCADA) Upgrades ** Addendum No. 1 Issued 4/30/2026 **
OPEN
May 18, 2026
- Attachment Preview
-
April 17, 2026REQUEST FOR PROPOSALFORCONSULTANT SERVICES FORWASTEWATER LIFT STATION SUPERVISORY CONTROL AND DATAACQUISITION (SCADA) UPGRADES FORCITY OF REDDING, CALIFORNIA(Schedule Number 5691)In accordance with the provisions of the Municipal Code of the City of Redding, sealedproposals must be submitted to the City Clerk’s 3rd floor office located at City Hall, 777 CypressAvenue, Redding, California 96001 prior to 3:00 p.m. PT, Monday, May 18, 2026, for furnishingthe City of Redding a proposal for providing Consultant Services for Wastewater Lift StationSupervisory Control and Data (SCADA) Upgrades per the scope of work and general conditions.PROPOSALS RECEIVED AFTER THIS TIME AND DATE MAY NOT BE ACCEPTEDOR CONSIDERED.The said proposals will be opened at 3:00 p.m. PT, on Monday, May 18, 2026, in thedesignated City Hall Conference Room as posted in the main lobby of City Hall, 777 CypressAvenue, Redding, California.The proposer shall provide the original (unbound), four (4) bound copies and a USB drivewith a PDF copy of the proposal. Electronic submission of proposals will not be allowed. One (1)set of the Fee Proposal is to be submitted in a separate, sealed envelope. The City will awardany resulting contract in a manner consistent with the City Purchasing Ordinance.The cut-off date and time for receiving questions regarding this bid is 5:00 p.m. PT, onThursday, April 30, 2026. All inquiries must be made in writing and may be submitted to the emailaddress shown below.THE CITY OF REDDINGPurchasing DivisionMichelle Kempley, Purchasing Officermkempley@cityofredding.govNOTEIf a potential bidder/proposer received this solicitation document throughsome means other than surface mail from the City of Redding (such as from the Cityof Redding Internet web site, or from another prospective bidder/proposer), it is theresponsibility of the potential bidder/proposer to advise the assigned City of ReddingPurchasing contact of its intention to submit a bid/proposal so that any addenda orother correspondence related to this solicitation will be sent to the potentialbidder/proposer. When contacting the Purchasing Division, the bidder/proposer shallprovide the solicitation number located on the cover page of this document.Transmittal of this information must be in writing, by U.S. Mail, or e-mail.Transmittal of this information via telephone is not acceptable.Please submit bid/proposal as directed in the RFP package. Forward to:City of ReddingCity Clerk777 Cypress AvenueRedding, CA 96001Proposals must be received by the City Clerk’s office prior to 3:00 p.m. PT on the dateindicated below. Mailing envelope is to be clearly marked on the outside with the followingnotation:“Proposal for Schedule No. 5691; opening at3:00 P.M., on Monday, May 18, 2026”Note: Signatures must be legible, indicating full first and last name.The City of ReddingPurchasing DivisionREQUEST FOR PROPOSALCONSULTANT SERVICES FORWASTEWATER LIFT STATION SUPERVISORY CONTROL AND DATA ACQUISITION(SCADA) UPGRADES FORTHE CITY OF REDDING, CALIFORNIA(Schedule Number: 5691)I. INTRODUCTIONThe City of Redding Public Works Department-Wastewater Utility (City) is soliciting proposals toprovide consultant services for upgrading the existing Supervisory Control and Data Acquisition(SCADA) system. The City’s system includes 21 sites, comprised of lift stations, a flow monitoringstation, and two solid waste gas extraction systems.To alleviate systemwide SCADA and hardware deficiencies and to add necessary remotemonitoring and alarm notification capabilities, the City is seeking proposals from highly qualifiedfirms to provide professional services related to software procurement, development, testing,documentation, integration, remote access, and alarm notifications associated with a turnkeySCADA system.This project is funded by the Wastewater Utility, with the total project cost estimated to be $300,000including equipment purchasing, installation and programming.The consultant services contract is expected to be awarded in July 2026 and is anticipated to beno longer than twelve (12) months. Any consultant responding to this RFP must be willing tocommit the necessary resources to the project to conform to the proposed schedule. InterestedConsultants are invited to submit qualifications in accordance with the requirements of this Requestfor Proposals (RFP).A mandatory site walk will be performed. The mandatory site walk will start at the Sunnyhill LiftStation, located at 5100 Bechelli Lane at 9:00 am on Tuesday, April 28, 2026. After completingthe site walk at Sunnyhill, City staff and attendees will proceed to visit a minimum of one other liftstation. City staff will be available to answer technical questions that arise during the site visit.If a proposing consultant fails to have a representative attend the mandatory site walk meeting, thenthe City will deem their proposal as non-responsive. Requests for alternate days and times for liftstation visits with City staff will not be accommodated.II. BACKGROUNDCity staff began the preliminary steps of working through upgrades to the system but quicklydiscovered that the task at hand was going to require much more work and equipment than initiallycontemplated. The following items have been completed:• Server installation and configuration• Procurement and installation of server backup UPS• Virtual Machine licensing and configurationo Procurement and installation of Windows Server 2022o Backup of main server hard drives onto Synology NAS• Firewall and switch installation and configuration• Central SCADA Ignition license procurement and installationo Ignition 8.1 custom package• Microsoft SQL database license procurement and installationo The configuration of Microsoft SQL database• Operator interface panel selection (Onlogic TC410R)• Edge device selection (Store and forward configuration)The following tasks are yet to be completed:• Supply 21 Allen Bradley/Rockwell Control/Compact Logix PLCs• Retagging of PLCs• Operator interface panel replacement hardware installation (City ETs)• Operator interface panel Ignition license procurement and installation• Operator interface panel SQL database license procurement and installationo Store and forward configuration (Edge device)• Selection, procurement, and configuration of identity provide for Windows Server2022, Ignition, and VPNo Considering Active Directory or Duo• Alarm auto dialer configurationo Selection and configuration of desired SIP servero Configuration of Ignition to use selected SIP server as auto dial out service• Configuration of Ignition reports• Programming all 21 Allen Bradley/Rockwell PLC’s for system uniformity(Emerson/GE platform currently)• Selection, procurement, configuration of I/O and PLC I/O cards and expansion racks(If needed).III. SCOPE OF SERVICESThe scope of services to be provided by the Consultant shall consist of the following Tasks:Task 1: Project Management Review and SchedulingConsultant will begin the project with a kickoff meeting involving all project team members:Consultant and City staff, and other identified stakeholders. The meeting will include a review of thescope of work, schedule, design standards, and expected deliverables for the project. The meetingwill address project coordination and responsibilities and define key project issues and goals.Consultant also will present a comprehensive plan identifying the development schedule thatclassifies the various components and milestones.Consultant will detail project objectives, team member responsibilities, milestones, budgets,schedules, quality assurance procedures, and progress evaluation techniques. Consultant willmonitor project progress throughout the project to ensure project objectives and milestones aremet.Before each regularly scheduled coordination and status meeting, Consultant will work with theCity's project manager to develop and distribute a meeting agenda and arrange for appropriateparticipants to attend. At each meeting, Consultant will review project schedule and budget status,obtain City input, facilitate decision making and discuss issues that have the potential of adversely2affecting project budget, schedule, or product. Meeting notes will be distributed following eachmeeting.Consultant will submit monthly progress reports to the City along with monthly invoices andappropriate backup. The reports will address the work progress; project schedule; information anddecisions needed to maintain schedule and complete deliverables; problems encountered thatmight affect schedule, budget, or work products; and anticipated work for the following month.The Consultant’s Project Manager shall play an active role in the management and coordination ofthe project to include monthly meetings with City staff to discuss project status, problems,budgeting, and other areas that have an adverse effect on the work. In addition, several meetings,telephone conferences or other communication means may be needed for consultation regardingproject issues or decisions between scheduled progress meetings.Deliverables:Project scheduleTask 2: Procurement of SCADA Package, Remote Access/Notification System, andHardwareThe Consultant will need to work closely with City utility and operations staff to identify monitoringand notification needs, current conditions and capacities, and provide a final recommendation forthe required Ignition SCADA software, remote access, and SMS and Voice/Phone notificationpackages for the City. The City would like to replace dated equipment including I/O cards and PLCexpansion racks with Allen Bradley/Rockwell. Staff would like all I/O to be uniform in both type andrack placement, as well as I/O assignment for uniformity across the wastewater collections/solidwaste systems. Please note that the verification of type, quality, and quantity of suggestedreplacement of new hardware components needed for this task, including the integration, warrantyfor hardware and software, training and services after completion of the task, are the responsibilityof the Consultant. City of Redding ETs will install the hardware.Deliverables: Consultant shall provide quote for hardware (I/O cards and expansion racks, 21 HMI’swith Onlogic TC410R Edge devices, etc.). In addition, they shall provide a memorandumsummarizing the City’s needs and plan for implementation – including but not limited to anyadditional requirements discovered during the evaluation of the facilities not currently monitored,and identification of the cost of any suggested new or replacement equipment that may be neededto satisfy the requirements of the scope of this RFP that may require contract amendments. Thememo shall also include a strategy to redevelop main and sub-layered SCADA screens to depictactual equipment in operation at facilities (pumps, generators, drives, ATS’s, valves, etc.) asappropriate.Task 3: InstallationThe City of Redding ETs will install the consultant supplied AB/Rockwell PLCs (with associatedI/O), servers, workstations, modems, firewalls, and displays.The Consultant shall install all necessary software, applications, operating systems, virtual-wareand communication drivers.3
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 541511Custom Computer Programming Services
- NAICS 541512Computer Systems Design Services
- NAICS 541611Administrative Management and General Management Consulting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
UH21003 REQUEST FOR PROPOSALS...
General Information Due Date: July 9, 2026 Opening Time: 2:00 PM Published Date:
City of Stockton
Bid Due: 7/09/2026
UH21003 REQUEST FOR PROPOSALS...
General Information Due Date: July 9, 2026 Opening Time: 2:00 PM Published Date:
City of Stockton
Bid Due: 7/09/2026