26-03 - RFQ - Design Services for 2026 Water System Improvements
Project Information
- Bid Title
- 26-03 - RFQ - Design Services for 2026 Water System Improvements
- Issuing Agency
- City of Mercer Island
- Location
- Washington
- Published Date
- Feb 20, 2026
- Closing Date
- Mar 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Title Bid/RFP Closing Date Status Files View 26-03 - RFQ - Design Services for 2026 Water System Improvements 03/10/2026 - 4:00pm Open - accepting bids and proposals View Details - Attachment Preview
-
Request for Qualifications No. 26-032026 Water System ImprovementsReleased: February 9, 2026Due: 4 pm (PST), March 10, 2026, to bids@mercerisland.govINTRODUCTIONThe City of Mercer Island (City) is requesting Statements of Qualifications (SOQs) from qualifiedprofessional engineering firms interested in providing design and support services for the 2026 WaterSystem Improvements Project. The firm should have experience with water utility and pressurereducing valve (PRV) station design in addition to being licensed and lawfully engaged in providingengineering services in the State of Washington.BACKGROUNDThree segments of water main along 82nd Ave SE, Forest Ave SE, and West Mercer Pl were installedroughly 65 years ago and have recently suffered multiple breaks. To prevent further damage, thewater lines in these areas will be replaced. Improving and renewing the water system is necessary toprevent unexpected system breakdowns and expensive emergency repairs. Taking a proactiveapproach to renew critical components such as water mains will strengthen the system’s reliability inserving its customers. This project furthers goals outlined in the City’s Water System Plan (2015),ensuring necessary improvements so the City remains at the forefront in providing high-quality waterservice to its current and future customers. Our total budget for this project is $633,521.00.SCOPE OF WORKPROJECT DESCRIPTIONThe purpose of this project is to replace roughly 1,000 feet of 4-inch cast iron water main with 6-inchand 8-inch ductile iron water mains at the following locations: 5200 block of 82nd Ave SE; 5200 block ofForest Ave SE; and 5212 West Mercer Pl. One PRV station, F3-B, will be replaced. Fire hydrants, waterservices, and other components will be upgraded/replaced, and the asphalt roadways will be repavedfollowing utility work.General Scope of ServicesThis preliminary scope of work is presented as a reference. The selected firm will work with the city todevelop the final scope of work.The scope of work is expected to include, but not be limited to, the following tasks:1. Conduct site visits and review relevant documents and other background information.2. Work in close coordination with the City’s project manager throughout the duration of theproject.a. Hold bi-weekly or monthly meetings to ensure the project remains on schedule andwithin budget. During these meetings the scope of work should be refined, recognizingthat all tasks may not be necessary, tasks may be expanded or added, and thesequencing of tasks may change during the project.3. Perform a site survey.a. Survey shall include elevations and locations of all surface and above ground featureswithin the public right-of-way and within the first 5 feet of private property adjoiningthe right-of-way within the project area.4. Perform hydraulic model development and calibrationa. This project should design the proposed conditions based off the City’s existing watermodel from current City Consultant.b. Deliver a design report which summarizes findings and provides recommendations atthe 90% submittal.5. Identify staging locations and temporary access options.a. This project has limited ROW, and we must maintain access to the properties within ourconstruction limits during work hours.6. Complete a design for identified improvements.a. 30% design submittal – plans and preliminary engineer’s estimate.b. 90% design submittal – plans, specifications, engineer’s estimate, and draft designreport.c. 100% design package – plans, specifications, engineer’s estimate, and final designreport.d. Conformed Construction – Plans and Specifications.7. Provide permitting support as needed for each task.8. Provide Public outreach support as needed for each task.a. Assist in fielding questions received, developing exhibits, renderings, or other media.9. Provide engineering support during the bidding process – pre-bid meeting attendance, respondto bidder questions, and issue addenda.10. Provide engineering support during construction – RFI review.PROJECT TIMEFRAMEThe City anticipates using the following general timeline for evaluating proposals and initiating acontract in response to the solicitation.Project MilestoneRFQ IssuedStatement of Qualifications DueProject AwardedProject Kick-OffBid Ready Design PackageAdvertise for Construction BidsContract awardConstruction PeriodDate2/9/20263/10/20263/24/20264/10/2026September 2026October 2026January 2027February to June 2027STATEMENT OF QUALIFICATIONSInterested consultants are requested to submit a Statement of Qualifications (SOQ) for the work. TheSOQ shall include the following information:1. Letter of Intent: Indicate interest in this project and working for the City, and any otherinformation that would assist the City in making its selection, including why your firm is thebest qualified to meet the needs of Mercer Island and this project. A principal or officer of thefirm authorized to execute contracts or other similar documents on the firm’s behalf mustsign the letter.2. Project Team and Key Personnel: Identify key staff (including sub-consultants asappropriate) who will be involved in the project, including their assigned roles, a briefdescription of their background and relevant experience. Please confirm that assigned staffhave capacity to work within project schedule.3. Company Profile and Experience: Provide evidence of relevant experience with similarprojects. Include the following information for three relevant projects managed by theproposed project manager within the last five years:• Description of project, location, and status;• Project results and challenges;• Description of professional services provided by the consultant team;• Initial project budget, final cost, and end date (if applicable); and• Primary client contact for the project (name, title, address, phone number, andemail).4. Project Understanding, Approach, and Schedule: Describe your team’s approach to meetingthe City’s needs and how the proposed team will work with City staff to complete theproject. Qualified firms and/or their subconsultants should also demonstrate knowledge andunderstanding of:• Hydraulic modeling and analysis of water systems• Temporary bypass design• Designing utility systems in areas of limited right-of-way• Effective public communication strategies• Demonstrated knowledge of constraints impacting cost, feasibility, andscheduling of constructionInclude a timeline that identifies major proposed tasks and products, including howfrequently check-in meetings occur, and when deliverables will be provided. The Cityrequires at least 2 weeks for document review. The timeline should demonstratecommitment to completing the design and bid-ready documents per the proposed timelineoutlined in this document. If the proposed target completion is unrealistic, aggressive, orconservative, please include this in your discussion along with a new target completion date.5. References: Provide three references (maximum) for whom your firm has performed similarwork within the last five years. Include contact name, current telephone number, andcurrent email for all references. Include two additional references (maximum) for each sub-consultant, as appropriate.6. Disclosure of Conflict of Interest: Disclose any potential conflict of interest due to any otherclients, contracts, or property interests regarding private development of any propertywithin the City of Mercer Island.Submittal Format & Deadline• Submit a PDF of your proposal electronically to bids@mercerisland.gov no later than 4 p.m.(PST) on Tuesday, March 10, 2026.• All proposals shall be clearly titled: SOQ for 2026 Water System Improvements• Please limit submittals to 20 pages using at least 11pt font (excluding cover letter, references,dividers, and resumes).• All proposals received will become the property of the City and will not be returned.• All questions on the project are due by Thursday, March 5, 2026, at 4 p.m. (PST). Questionsregarding the project may be emailed to Zechariah Rodino, Utilities Engineer, atzechariah.rodino@mercerisland.gov. Any oral communication will be considered unofficial andnon-binding. Questions via phone will not be accepted. All questions received will be compiled,and responses will be posted by Monday, March 9, 2026, at 4 p.m. (PST).• It is the obligation and responsibility of the submitter to learn of addendums, responses, ornotices issued by the City relative to this RFP. These will be posted on the City website atwww.mercerisland.gov/rfps.• Rights reserved by the City: The City reserves the right to reject any or all responses receivedfor this solicitation; extend the submission due date; modify, amend, reissue, or rewrite thissolicitation; and procure any or all services by other means. The city reserves the right tomodify the scope of this solicitation.• This solicitation does not obligate the City to award a contract to any respondent. The finalselection is the sole decision of the City, and the respondents to this formal request have noguaranteed appeal rights or procedures. At its option, the City reserves the right to waive asinformality any irregularities in proposals and/or to reject any or all proposals.Conditions of SubmittalCosts for Development of Submittals: All costs for developing submittals in response to this RFQ are theobligation of the consultant and are not chargeable to the City. All submittals will become property ofthe City and will not be returned. Submittals may be withdrawn at any time prior to the published closedate, provided notification is received in writing to the CIP Project Manager.Agreement Form: The agreement form to be used will be the City’s standard professional servicesagreement (PSA), which is provided as Exhibit 2. Consultants that submit proposals are expected tomeet the terms contained in the PSA, as shown in Exhibit 2, no modifications will be allowed.Americans with Disabilities Act (ADA) Information: This material can be made available in an alternateformat by calling 206-275-7833.Non-Discrimination: The City of Mercer Island, in accordance with Title VI of the Civil Rights Act of 1964,78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department ofTransportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assistedprograms of the Department of Transportation issued pursuant to such Act, hereby notifies all biddersthat it will affirmatively ensure that in any contract entered into pursuant to this advertisement,disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity tosubmit bids in response to this invitation and will not be discriminated against on the grounds of race,color, national origin, or sex in consideration for an award.Evaluation CriteriaA committee of City personnel will evaluate and rate each submitted SOQ using a qualification-basedprocess with the following criteria:Project Understanding and Methodology: The submittal demonstrates thorough understanding of theproject; how the team plans to address the needs of the City; and the team’s unique qualities as theyrelate to the project. It demonstrates the ability to produce quality deliverables; and a sound approachthat will meet the proposed timeline. [30 points]Project Team Qualifications and Experience: The submittal provides a complete and comprehensiveorganizational chart or similar explanation of team members’ roles and responsibilities, including asummary of each firm on the team, office locations, number of staff, and area(s) of expertise. Itdemonstrates the team’s strengths and unique qualities as well as the team’s analysis and design meetthe needs of the project. [25 points]Relevant Project Experience: The submittal demonstrates relevant and successful experience withsimilar street-related capital design projects. [20 points]
- Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 541330Engineering Services
- NAICS 541512Computer Systems Design Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Consulting, Design, and Const...
Project: Consulting, Design, and Construction Observation Services For The Port Orchard Marina Guest
Sammamish Plateau Water
Bid Due: 7/28/2026
Request for Qualifications (R...
06/19/2026 Request for Qualifications (RFQ): Tenant & Airport Improvement Project, #26-44-1899 RFQ Ad
Spokane International Airport
Bid Due: 7/28/2026