HHS Cherokee Mental Health Institute Four Corner Elevator Replacement
Project Information
- Bid Title
- HHS Cherokee Mental Health Institute Four Corner Elevator Replacement
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Mar 25, 2026
- Closing Date
- Apr 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP952700-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
RFP952700-01
Solicitation
HHS Cherokee Mental Health Institute Four Corner Elevator Replacement
Solicitation Type
Request for Proposals
CountyDescriptionDescription
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for replacement of Elevator F, a 4 stop, hydraulic elevator in the Main Building, referred to as the Four Corner area.
Agency InformationNumber
005
Name
Administrative Services, Dept
Address 1
1305 E. Walnut St.
Address 2
City/State/Zip
Des Moines, IA 50319
Contact InformationContact Name
Construction Procurement
Contact Title
Michael Bradbury
Contact Email
Contact Phone Number
(515) 823-9327
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
3/25/2026 8:00:00 AM
Until
4/14/2026 2:00:00 PM
Documents/Attachments - Attachment Preview
-
RFP COVER SHEETAdministrative InformationSTATE OF IOWAREQUEST FOR PROPOSALSPROFESSIONAL DESIGN SERVICESRFP Number RFP952700-01 Title of RFP HHS CHMHI Four Corner Elevator ReplacementAgencyIowa Department of Administrative Services (DAS)ProjectDescriptionThe State of Iowa Department of Administrative Services (DAS) is seeking professionaldesign services for replacement of Elevator F, a 4 stop, hydraulic elevator in the MainBuilding, referred to as the Four Corner area.State Issuing Officer:Michael BradburyIssuing OfficerIowa Department of Administrative ServicesHoover State Office Building, Level 31305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327Email: construction.procurement@iowa.govPROCUREMENT TIMETABLE—Event or ActionDate/Time (Central Time)State Posts Notice of RFP on TSB website3/23/26State Issues RFP3/25/26Pre-Proposal Conference Location and Address: 1251 W Cedar Loop,Cherokee, IA 51012 – Main Admin BuildingIs Pre-Proposal Conference mandatory? Nohttps://teams.microsoft.com/meet/22588744844927?p=IRcFkKjxNXSL7Mw2LFPhone Number - 515-612-9860 - Conference ID: 459 821 23#If a map is needed, contact the Issuing Officer.3/31/26 – 1:00 PMQuestions, requests for clarification, and suggested changes fromRespondents due to Construction Procurement4/6/26 – 2:00 PMProposals Due4/14/26 – 2:00 PMRelevant WebsitesWebsite where Addenda to this RFP will be posted http://bidopportunities.iowa.govWebsite where contract terms and conditions are postedhttps://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdfNumber of Copies of Proposals Required to be Submitted: 1 DigitalFirm Proposal TermsThe minimum number of days following the deadline for submitting Proposals that the firm guaranteesall proposal terms, including price, will remain firm is 120 Days.1.1 INTRODUCTIONThe Iowa Department of Administrative Services (DAS) is seeking proposals from qualified andavailable Design companies for services, per RFP cover page, and as outlined in the following(Sections 1.2 - 1.3). The successful proposal must:● For the staff that will be assigned, identify and describe qualifications, experience, andexpertise in providing services for similar, or relevant, projects.● For the staff that will be assigned, provide a list of past similar or relevant projects completedin the last 5 years, and include brief descriptions of what the projects entailed and a contactname and phone number (reference). In addition, provide estimated project cost, finalproject cost at acceptance, and whether it was completed on time.● Describe the composition of your team. Identify staff to be assigned. Provide resumes of keyindividual(s) including education, relevant experience, and certifications/licensing. NOTE: Anyresponding company and/or consultant that is part of the project design services cannotreceive an award from the resulting request for bid of construction services.● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.● Describe computer program/software capabilities and expertise you utilize. Please describeyour experience.● Provide a copy of your organizational chart.● Describe your experience, if any, on designing similar or relevant projects for the State ofIowa.● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.● Identify desired reimbursable charges (the State has limitations, per State of Iowa AccountingPolicies and Procedures 210.245), and all other charges.1.2 SCHEDULEDAS is seeking a firm that can commence work upon execution of a contract. Time is of theessence.Execution of Designer’s ContractTentative Design Kick-Off Meeting50% Construction Documents and Cost Opinion By95% Construction Documents and Cost Opinion By100% Construction Documents and Cost Opinion ByContractor BiddingExecution of Contractor’s Contract(s)Submittals, Procurement and ConstructionClose outWeek of 5/12/26Week of 5/19/26To Be CoordinatedTo Be Coordinated8/6/268/7/26 -8/28/269/14/26September 2026 – June 2027July 20271.3 PROJECT DESCRIPTIONConstruction Manager (DCI Group) has been engaged for this Project to serve as advisor to DASand to provide assistance in administrating the Contract for Design between DAS and the Designeraccording to separate contract between DAS and Construction Manager. DAS is currently seekingdesign services from qualified firms for a project consisting of replacement of an existing elevatorF in the Main Building known as Four Corners on the Iowa Department of Health and HumanServices - Cherokee Health Mental Health Institute campus.Design services shall include:1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover pagefor a sample contract.1.3.2 All design disciplines necessary to complete the scope of work.1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with theOwner, Construction Manager, and Owner’s maintenance staff.1.3.4 Use of the State of Iowa‘s construction management software program for uploading alldocuments, submitting and approving pay apps, and construction administration. Thecost for the use of the software is paid by the Owner.1.3.5 Project-specific design needs1.3.5.1 Conduct site visit to document existing elevator, hoistway, pit, machine room,and supporting systems.1.3.61.3.71.3.5.2 Develop Basis of Design outlining performance requirements, equipment type,and owner preferences.1.3.5.3 Prepare architectural, structural, mechanical, and electrical design documents forfull elevator replacement, including any and all modification to the machineroom.1.3.5.4 Provide permit‑ready drawings and respond to plan review comments.1.3.5.5 Assist with bidding, including technical specifications and responses to bidderquestions.1.3.5.6 Review elevator contractor submittals and perform periodic construction‑phaseobservations.1.3.5.7 Coordination with Owner’s lock set and keying requirementsDesign for scope of work. Provide material recommendations based on experience,quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.Provide minor drawing work to assist the Construction Manager in the development ofhazardous materials bid package. This shall include providing PDF backgrounds foridentification, by others, of hazardous materials removal1.3.8 Designer shall include any and all survey work required for completion of project.1.3.9 Coordinate with State agencies to confirm utilities that may be abandoned as well as shutdown requirements where required.1.3.10 Provide detailed input of design schedule to Construction Manager for overallincorporation into master schedule.1.3.11 Designer shall assist Construction Manager in the evaluation of long lead times.1.3.12 Quality control during Design, Preconstruction and Construction.1.3.13 Compliance with all Federal, State, and applicable AHJ codes.1.3.14 Completion of State building and energy code documents, as required.1.3.15 Design review will be conducted at 100% design development documents, 50%construction documents, and 95% construction documents. Dates for design reviewmeetings to be coordinated with the design and project team and set no later than thedesign kickoff meeting. Review will be conducted with DAS Owner Representative,Construction Manager, and Facility Representative, at a minimum. Drawings,specifications and cost opinions (if applicable) shall be provided at least five days prior toeach review meeting. An additional review meeting may be required at the end if thereare discrepancies in cost opinions or constructability review questions.1.3.16 Review with the Department of Inspections, Appeals, and Licensing’s Building CodeBureau for approval of plans or exemption from review. All fees associated with theBureau are the responsibility of the designer.1.3.17 Develop and distribute agendas and meeting minutes for all meetings during the designphase.1.3.18 Construction cost opinions provided by the Design Professional team during Design (at50% Construction Documents, and 95% construction documents) with a Final Estimate forconstruction included with bid documents, per Iowa Code.1.3.19 Construction drawings, specifications (the Construction Manager will produce Divisions00 and 01), and addenda.1.3.20 Provide bid alternates as determined during the course of design and bid packagedevelopment.1.3.21 Assist Owner and Construction Manager in obtaining bids from qualified contractors.1.3.22 Construction administration, including creation of the submittal and closeout items log,review of and responses to submittals and closeout documentation, RFIs, proposalrequests, change orders, pay applications, periodic site visits, attendance at projectmeetings as required, participation / development of contractor punch list, closeoutdocumentation review and approval, certificates of substantial completion, andcertificates of final completion, as well as development of Architectural SupplementalInstructions for design revisions, and punch lists within the construction managementsoftware program.1.3.23 Participation with project team during construction progress meetings as required.Designer shall participate in bi-weekly conference calls during the construction period.1.3.24 Field Observation reports, with photos, submitted for each site inspection within five (5)days of the site visit.1.3.25 Acknowledgement that all documents are copyright to the State of Iowa and shall beturned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs andaddendums will be expected to be incorporated before final posting. Both the nativecomputer format and PDF versions shall be uploaded to the construction managementsoftware program at the end of the project.1.3.26 The Department requests lump sum pricing from the respondents to this RFP, with thelump sum base scope price being inclusive of all reimbursables, such as printing, mileageand travel expenses. The Department requests the fee proposal from the respondents tothis RFP be broken down as follows. These breakdown prices will be used as the scheduleof values for billing purposes.1.3.26.1 Construction Documents1.3.26.2 Bidding or Negotiation Assistance1.3.26.3 Construction PhaseInclude at minimum the following site/virtual visits:Design Kickoff/Building Evaluation100% Design Development50% Construction Documents95% Construction Documents100% Construction DocumentsPre-Bid MeetingConstruction Field ObservationSubstantial Completion/Punch ListDevelopmentFinal Completion/Punch ListVerificationOne Year Warranty Correction PeriodVisitIn-Person1----121117Virtual--11------2Beyond these site visits, each proposing firm shall provide additional visits as they see fit tocomplete the work of design. In addition to the lump sum pricing, the Department requestsa unit price per construction inspection visit. This unit price will be additive or deductivebased on the number of actual visits made.1.4 ATTACHMENTS1.4.1 Exhibit A – (2 pages)
- Commodity Codes
-
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 621330Offices of Mental Health Practitioners (except Physicians)
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.