Design Build Services for a Manufacturing Facility Addendum No. 2
Project Information
- Bid Title
- Design Build Services for a Manufacturing Facility Addendum No. 2
- Issuing Agency
- Wakulla County
- Location
- Florida
- Published Date
- Mar 12, 2026
- Closing Date
- Mar 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ 2026-02
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFQ 2026-02 Design Build Services for a Manufacturing Facility 6 documents
-
RFQ 2026-02 Intent and General Information
document _recordid
9222
-
RFQ 2026-02 Design Criteria Package
document _recordid
9223
-
RFQ 2026-02 Instructions to Proposers
document _recordid
9224
-
RFQ 2026-02 Proposal Forms
document _recordid
9225
-
RFQ 2026-02 Addendum No. 1
document _recordid
9231
-
RFQ 2026-02 Addendum No. 2 Response to Proposers' Questions
document _recordid
9253
-
RFQ 2026-02 Intent and General Information
- Attachment Preview
-
Addendum No. 2 to RFQ 2026-02DESIGN BUILD SERVICES FOR A MANUFACTURING FACILITYIssued March 12, 2026SECTION 1.0 SCHEDULE OF EVENTSFailure to comply with this or any other paragraph of this RFQ shall be sufficient reason forrejection of the bid.All times listed in the Schedule of Events are Eastern Standard Time (EST).EventDate/TimeRFQ Advertisement DateFebruary 19, 2026Release of RFQFebruary 19, 2026Technical Questions Due from Prospective ProposersMarch 5 ,2026 by 5:00 p.m.Responses to technical questions dueMarch 12, 2026PROPOSALS DUE TO BOCCMarch 20, 2026 by 3:00 p.m.Oral PresentationsMarch 31 – April 1, 2026Posting of Committee RankingsApril 2, 2026Board Consideration of Selection Committee Rankingsand Authorization to Enter into NegotiationsApril 6, 2026Posting of Intended AwardApril 7, 2026Board Consideration of Intended Award*April 10, 2026Posting of Notice of AwardApril 13, 2026*This will be a special called Board Meeting.This addendum is being posted to:• Provide the County’s response to proposers’ questions.• Note the addition of Triumph Gulf Coast Inc. specific indemnification language. Thefollowing language will be ADDED to County’s Indemnification language located in FormRFQ 2026-02 Design Build Services for a Manufacturing FacilityADDENDUM NO. 24 in the Proposal Forms document, Article 11 of the Design Build Agreement and Article7 of the General Terms and Conditions documents.“The contractors/subcontractor/consultant/subconsultant shall indemnify,and hold harmless Triumph Gulf Coast, Inc., a Florida not-for-profitcorporation, Grantee, a public body corporate, and all of its officers, directors,agents and employees from all liabilities, damages, losses, costs, including butnot limited to, attorney’s fees and to the extent caused by the negligence,recklessness, or intentionally wrongful conduct of thecontractor/subcontractor/consultant/subconsultant and other persons theyemploy or utilize.”RFQ 2026-02 Design Build Services for a Manufacturing FacilityADDENDUM NO. 2Proposer Submitted Questions and County Responses1. The RFQ instructions indicate that Forms 1, 2, and 3 are to be included within Tabs 1,2, and 3 respectively. However, Tab 7 also appears to reference inclusion of Forms 1,2, and 3. Could you please confirm whether the Owner intends for Forms 1, 2, and 3to be included only within Tabs 1–3, or if they should also be duplicated within Tab 7?R1.Forms 1-3 are to be included in Tabs 1, 2 and 3 respectively. Tab 7 will includeForms 4 through 17.2. Can you please confirm that design fees should be included in the PreconstructionCost Proposal?R2. Yes, the design fees should be included in the preconstruction cost proposal.3. Will the Owner be providing a standardized form or specific format for submission ofthe Preconstruction Cost Proposal, or should respondents submit the proposal intheir own format?R3. The County does not have a specific format for preconstruction cost proposal.4. The RFQ indicates that Tab 2 is limited to three (3) front-and-back pages; however, italso states that additional pages may be added as necessary to fully complete Form2. Could you please clarify whether Form 2 counts toward the three (3) front-and-back page limit for Tab 2, or if the page limit applies only to the Executive Summaryportion, with Form 2 permitted as additional pages beyond the stated limit? We wantto ensure that our response complies fully with the submittal requirements and avoidinadvertently exceeding the page limitations.R4.There are two items in Tab 2. The Executive Summary which shall be limited to 3pages front and back and Form 2. If more response room is needed for Form 2,please feel free to add additional pages to Form 2.5. Is the firm that created the design criteria design documents going to release thedesign for use by a new firm?R5.The design criteria package that was created for this Design Build procurementis available on Wakulla County’s website under RFQ 2026-02 Design Build Services.6. If so will they provide CAD files?R6.Yes the CAD files will be available to the awarded contractor/firm.7. What is the expected design/build structure for contract purposes that is expected ofa successful bid? (IE contractor lead - designers under contractor, etc)?RFQ 2026-02 Design Build Services for a Manufacturing FacilityADDENDUM NO. 2R7.The County expects to contract with one contractor who within their proposalwill have secured a design/engineering firm to complete the design of the facility.8. One contract, or multiple contracts acceptable?R8. One contract.9. The timeline does not appear to have much room for adjustments if better optionsare available, if cost saving measures could be introduced, can there be someflexibility for implementation?R9. The County will have some but limited flexibility due to the grant agreementtimelines.10. Can the project have a project lead for design, that then changes for constructionphase?R10. The County anticipates awarding one contract to the top ranked proposer thatwould encompass the design and construction of the facility.11. What is the grading criteria for submittals?R11. Please refer to pages 14 and 15 of the Intent and General document for thegrading criteria.12. What is the grading criteria for the presentation?R12. The assigned evaluation committee will use the same grading criteria for theoral presentation.13. Are all applicants to provide a presentation or will there be a short list from submittalpackages?R13. The County will determine if there will be a short list based on the number ofproposals received and the subsequent ranking of the proposals. All the proposerswho are shortlisted will be required to give an oral presentation.14. If there is a short list how many will be on it?R14. The number of proposers on the short list will be based on number of responsesand the ranking of those responses.15. Are there expectations for interior design?RFQ 2026-02 Design Build Services for a Manufacturing FacilityADDENDUM NO. 2R15. The criteria includes interior finishes, built-in casework, and other built-incomponents identified in the criteria documents. Moveable furniture, fixtures, andequipment not identified in the criteria documents are not included.16. Are there expectations for FF&E?R16. The criteria includes interior finishes, built-in casework, and other built-incomponents identified in the criteria documents. Moveable furniture, fixtures, andequipment not identified in the criteria documents are not included.17. Tab 3 & Tab 5 limit refences and projects of a similar nature to the past (5)years. Would the County consider extending the time frame for references andsimilar projects to the past ten (10) years?R17. The County is interested in seeing similar work done within the past five (5)years. If the proposer submits something outside of that time frame it could impactthe scoring.18. Has a programming phase for the facility related to the manufacturing process beencompleted? If not, is this process to be included in the Design-Builder’s scope ofwork?R18. Programming for the manufacturing process has not been completed. At thetime the criteria documents were prepared, it was our understanding that, with theexception of the large pieces of equipment that require fixed utility connectionsidentified in the criteria documents, Point Blank Enterprises will program, lay out,and install all equipment within the manufacturing area.19. Is the scope of work limited to the base building and shell including office area tenantimprovements?R19. The scope of work consists of the work depicted in the criteria documents. Thiswork is generally described as but not necessarily limited to the building structure,interior finishes, built-in items shown, and site improvements.20. Will the Design-Builder be responsible for the programming, layout, design, andinstallation of the systems required to accommodate the manufacturing process?R20. At the time the criteria documents were prepared, it was our understandingthat the items referenced in the question will be done by Point Blank Enterprises.21. There are civil engineers and architects tied to the RFQ. Are these entities eligible toparticipate in the RFQ?
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CONSTRUCT RANGE ROAD 218 BY-P...
Follow CONSTRUCT RANGE ROAD 218 BY-PASS AT D-51, EGLIN AIR FORCE BASE, FLORIDA
Federal Agency
Bid Due: 7/31/2026
6008 Le Lac Road - Demolition.
Description: 6008 Le Lac Road - Demolition Department: Facilities Dev & Ops Buyer:
Palm Beach County
Bid Due: 5/15/2030