Southeast Water Pollution Control Plant - Secondary Clarifie...

Project Information

Bid Title
Southeast Water Pollution Control Plant - Secondary Clarifie...
Issuing Agency
San Francisco Public Utilities Commission
Location
California
Published Date
Jun 23, 2026
Closing Date
Jul 23, 2026
Government Level
State & Local
Status
Closed
Ref. #
RFP for DB-140
Original Source
Join to Access Full Details
Project Description
Bid Details

RFP for DB-140

Southeast Water Pollution Control Plant - Secondary Clarifiers Rehabilitation




Bid due


07/23/2026
2:00 PM









  • Type
    Professional Services

  • Department
    Infrastructure Division



BACK TO CONTRACTS & BIDS LIST










Project Description

Digital files of the RFP package are available by request. To request these materials, email qbd@sfwater.org with this Contract No. DB-140, the firm name, full address, email address, phone number, copy of contractor’s license or business card, and a copy of a government-issued identification. Visit https://webapps.sfpuc.org/bids/ for updates. Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement.

The City and County of San Francisco, acting by and through the San Francisco Public Utilities Commission, is soliciting proposals from prequalified firms, teams, or joint ventures (JV), or other prequalified business entities to provide Design-Build services for Contract: DB-140, Southeast Water Pollution Control Plant – Secondary Clarifiers Rehabilitation.

The SFPUC has pre-qualified firms (“Qualified Candidates”) through the Request for Qualifications (“RFQ”) process. As part of the RFQ, each firm’s Design Manager and Project Manager were qualified as part of the Proposer’s Team. Only the Qualified Candidates, appearing below in alphabetical order, are eligible to submit proposals as a Proposer in response to this RFP:

1. PCL Construction West Coast, Inc. with Stantec Consulting Services, Inc.
2. Walsh Construction Company II, LLC with Brown and Caldwell

Built in 1952, the Southeast Water Pollution Control Plant (SEP) is the City’s largest wastewater treatment facility, handling nearly 80% of San Francisco's combined stormwater and wastewater every year. The purpose of the SEP secondary clarifiers (SEP 230) is to separate activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities. The sedimentation tanks consist of sixteen reinforced concrete circular tanks which are divided into two groups of eight, designated as the North and South clarifiers by their relative position on the plant site. Equipment included in SEP 230 consists of diffusers to mix the flow in the mixed liquor channels, gates and valves to control flow and sludge/scum collection equipment in the clarifiers.

The Local Business Enterprise subconsulting and subcontracting participation requirements for this Project are 20.00% for Design Services and 20.00% for Construction Services, respectively.

SFPUC project staff will conduct a pre-proposal networking conference on June 23, 2026 at 10:00 AM. The conference will be available by remote means only. To participate by remote means, please access the meeting at this website: https://sfwater.zoom.us. The Meeting ID is 831 1939 9264 and meeting Passcode is 417726. To join, enter Meeting ID and click Join. When prompted, enter the meeting Passcode. To participate by phone, dial +1.213.338.8477 and enter the Meeting ID followed by # key. When prompted, enter the meeting Passcode and # key. The pre-proposal conference is held to offer information about the Project and the procurement process and answer any questions or requests for clarification on any items in the RFP. All potential Proposers are encouraged to attend.

SFPUC will conduct a site inspection on June 23, 2026 at 1:00 PM at 750 Phelps St. San Francisco, CA. Signs will be posted for location within facility.

Written questions regarding the RFP shall be directed to qbd@sfwater.org no later than 2:00 pm on July 9, 2026.




Request for proposal



  • ESTIMATED COST


    Fixed Budget Limit is $42,000,000




  • DUE DATE


    07/23/2026




  • DUE TIME


    2:00 PM




  • DURATION






  • LOCATION


    https://sfpuc.sharefile.com/r-rfd46e6ce12664f83a9f1a2c587510a2c




  • CONTACT


    Contract Administration Bureau, QBD@sfwater.org







Pre-Submittal Conference




  • DATE


    06/23/2026




  • TIME


    10:00 AM




  • ATTENDANCE


    Not Mandatory




  • LOCATION


    https://sfwater.zoom.us/j/83119399264?pwd=yzjTZTABWquow7A5zQsGL6RL6Kj2wH.1




  • ADVERTISEMENT DATE


    06/10/2026











Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
  • NAICS 541620Environmental Consulting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Construct retaining wall, MGS...

Basic Information Title Construct retaining wall, MGS, cold plane & Pvmt widening. Agency

State Government of California

Bid Due: 9/02/2026

Badger Hill Seed Orchard Well

Follow Badger Hill Seed Orchard Well Active Contract Opportunity Notice ID 127EAW26Q0058 Related

AGRICULTURE, DEPARTMENT OF

Bid Due: 9/01/2026