Cedar Falls Community School District 2026 Roof Improvements Project
Project Information
- Bid Title
- Cedar Falls Community School District 2026 Roof Improvements Project
- Issuing Agency
- Cedar Falls Community School District
- Location
- Iowa
- Published Date
- Feb 4, 2026
- Closing Date
- Mar 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- 2026 CONSTRUCTION DOCUMENTS (2-3-26).pdf
- Attachment Preview
-
Cedar Falls Community School District2026 Roof Improvements ProjectPre-bid Meeting: 3/5/2026Hansen Elementary School616 Holmes DriveCedar Falls, IA 50613BASE BIDBids Due: 3/19/2026North Cedar Elementary School2419 Fern AvenueCedar Falls, IA 50613FG1EDCBZYWXPIRQHH1I1J1AVUTMGNOT IN CONTRACTCDABGFEJINKRMLOPQSLKJNTHE INFORMATION CONTAINED HEREIN IS OFA PROPRIETARY NATURE AND IS SUBMITTEDIN CONFIDENCE FOR USE BY THE CLIENTSAPPROVED BY THE ORIGINATOR OF THISDOCUMENT - ONLY. THE USE OF THESEDOCUMENTS FOR ANY OTHER PROJECTS,PURPOSE, LOCATION, PUBLICATION,REPRODUCTION OR DISTRIBUTION IN WHOLEOR PART, BY ANY INDIVIDUAL ORORGANIZATION WITHOUT WRITTENPERMISSION THE ORIGINATING COMPANY ISPROHIBITED. THE INFORMATION HEREINREMAINS THE PROPERTY AND ITS USE ORDISCLOSURE TO OTHERS IS PROHIBITED FORANY USE NOT AUTHORIZED BY THEORIGINATING COMPANY.APPROVEDFOR BIDDINGDRAWING INDEX:A1 – Cover PageA2 – Hansen – base bidA3 – N Cedar – base bidD1– EPDM DetailsD2– EPDM DetailsI HEREBY CERTIFY THAT THIS PLAN OR TECHNICAL SUBMISSIONWAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION ANDRESPONSIBLE CHARGE. I AM A DULY REGISTERED ARCHITECTUNDER THE LAWS OF THE STATE OF IOWA.ROBERT J. STENSLAND,A.I.A.MY REGISTRATION RENEWAL DATE IS: 6/30/27PAGES OR SHEETS COVERED BY THIS SEAL:CEDAR FALLS COMMUNITY SCHOOL DISTRICTSHEETS A1, A2, A3, D1, D2DATE: FEB. 3, 2026IOWA REG: 5656CONTACT INFORMATION:Owner:Cedar Falls CSD1002 West First St.Cedar Falls, IA 50613Contact: Chris Thome319-553-2464Owner’s RepConfidence GroupGarrett Brown515-979-5173Design Team:Modern DesignContact: Kevin McConnell319-987-2388SHEET TITLE:COVERPAGESHEET NO.A1Scope of Work – Low-Slope1. ROOF PLAN LAYOUT, LOCATION, AND SECTIONS WERE TAKEN FROM EXISTING BUILDING PLANS ANDFIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE TO CORE THE ROOF. THE CONTRACTORSHOULD VERIFY ALL CONDITIONS OF THE EXISTING ROOF SYSTEM, INCLUDING INSULATION TYPE(S)AND THICKNESS.2. ROOF SYSTEM: 90MIL FULLY-ADHERED REPLACEMENT OF EXISTING ROOF SYSTEM TO THE DECK. FASTEN LAYEROF POLYISOCYANURATE TO DECK. FASTEN MINIMUM 1/8" TAPERED INSULATION. ADHERE ½” HDCOVERBOARD TO POLYISO. 90MIL MEMBRANE ADHERED TO THE HD COVERBOARD. NEW METALCOPINGS, FLASHINGS, AND MISCELLANEOUS AREAS WILL ALL RECEIVE NEW MATERIALSOUTLINED IN THE SPECIFICATION. ½” CRICKETS WILL BE INSTALLED BETWEEN DRAINS ANDAROUND UNITS.3. RETROFIT DRAINS WILL BE INSTALLED AT ALL LOCATIONS.4.ALL PARAPET/EXISTING FLASHINGS WILL RECEIVE NEW PLYWOOD TO EXISTING BRICK FOR A CLEANWORKING SURFACE FOR EPDM.5. ALL CURBS WILL RECEIVE CRICKETS TO DIRECT WATER AWAY FROM TOP SIDE OF UNIT.6. FLASH ALL DRAINS, CURBS, VENTS, AND STACKS AS SHOWN IN PLANS. MANUFACTURER’SSTANDARD DETAILS AND RECOMMENDATIONS FOR ANY MISCELLANEOUS DETAILS NOT SHOWN INPLANS.7. ALL EXISTING WOOD BLOCKINGS WILL BE REMOVED AND REPLACED WITH COMPOSITE BLOCKS.8. INSTALL NEW WALKWAY PADS AROUND ROOF ACCESS STAIRS AND ROOF TRANSITIONS.9. CONTRACT SHALL INCLUDE ANY MODIFICATIONS, MATERIALS, AND/OR IMPROVEMENTS REQUIREDBY THE ROOF SYSTEM MANUFACTURER TO MEET SPECIFIED WARRANTY.10. STORED MATERIALS - DO NOT EXPOSE MATERIALS VULNERABLE TO WATER OR UV DEGRADATIONIN QUANTITIES GREATER THAN CAN BE APPLIED DURING THE SAME DAY. FLAMMABLE MATERIALSSTORED ON ROOF IS NOT ACCEPTABLE. ONLY FLAMMABLE MATERIALS USED THAT DAY ARE ALLOWEDON ROOF.11. A PORT-A-JOHN IS REQUIRED ON SITE DURING ALL WORK, AS WELL AS A DUMPSTER. BOTH MUSTBE KEPT IN A CLEAN TIDY MANNER AND PLACED IN PREAPPROVED LOCATIONS.12. ACCESS: THIS IS A SECURE FACILITY AND NO ONE SHOULD ENTER THE FACILITY WITHOUTEXPRESS PERMISSION FROM AN OWNER'S REPRESENTATIVE.13. PERFORM ALL WORK IN A PROFESSIONAL MANNER AND AS SPECIFIED IN THESE DOCUMENTS. RAINPRECAUTIONS MUST BE FOLLOWED DAILY; ANY WORK COMPLETED IN RAIN WILL BE TORN OFF ANDREPLACED.14. COORDINATE WORK ACTIVITIES DAILY WITH OWNER DURING COURSE OF THE WORK AND PHASING.15. PROTECT BUILDINGS, ADJACENT BUILDINGS OR STRUCTURES, WALKWAYS, SITE IMPROVEMENTS,LANDSCAPING, EXTERIOR PLANTINGS, VEHICLES, AND OTHER SURFACES FROM SOILING OFOPERATIONS AND CONSTRUCTION DEBRIS AND DUST.16. ALL GRASS ACCESS POINTS WILL BE RETURNED TO THEIR ORIGINAL CONDITION.FG1EDH1I1J1LEGENDCBAXXXDETAILSZYWXPIRQHVUTMROOF DRAINRTUSKY LIGHTGSLEEPERSLKJPLUMBING STACKPITCH POCKETNNot In ContractDEAD CURBProject DatesHansen Elementary – Sections I, H, & N Start – 6/8/26Finish – 8/3/2678'4D23D24D21D2I2D237'3D1Overflow2'3'11'4D137'3HD2Overflow2D14D12D128'THE INFORMATION CONTAINED HEREIN IS OFA PROPRIETARY NATURE AND IS SUBMITTEDIN CONFIDENCE FOR USE BY THE CLIENTSAPPROVED BY THE ORIGINATOR OF THISDOCUMENT - ONLY. THE USE OF THESEDOCUMENTS FOR ANY OTHER PROJECTS,PURPOSE, LOCATION, PUBLICATION,REPRODUCTION OR DISTRIBUTION IN WHOLEOR PART, BY ANY INDIVIDUAL ORORGANIZATION WITHOUT WRITTENPERMISSION THE ORIGINATING COMPANY ISPROHIBITED. THE INFORMATION HEREINREMAINS THE PROPERTY AND ITS USE ORDISCLOSURE TO OTHERS IS PROHIBITED FORANY USE NOT AUTHORIZED BY THEORIGINATING COMPANY.APPROVEDFOR BIDDING54D1D232D1D12'4D15D1CORE SAMPLE: Metal DeckN5D172'3D22'5D1SHEET TITLE:ROOFPLANSHEET NO.A2Scope of Work – Low-Slope1. ROOF PLAN LAYOUT, LOCATION, AND SECTIONS WERE TAKEN FROM EXISTING BUILDING PLANS ANDFIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE TO CORE THE ROOF. THE CONTRACTORSHOULD VERIFY ALL CONDITIONS OF THE EXISTING ROOF SYSTEM, INCLUDING INSULATION TYPE(S)AND THICKNESS.2. ROOF SYSTEM: 90MIL FULLY-ADHERED REPLACEMENT OF EXISTING ROOF SYSTEM TO THE DECK. FASTEN LAYEROF POLYISOCYANURATE TO DECK. FASTEN MINIMUM 1/8" TAPERED INSULATION. ADHERE ½” HDCOVERBOARD TO POLYISO. 90MIL MEMBRANE ADHERED TO THE HD COVERBOARD. NEW METALCOPINGS, FLASHINGS, AND MISCELLANEOUS AREAS WILL ALL RECEIVE NEW MATERIALSOUTLINED IN THE SPECIFICATION. ½” CRICKETS WILL BE INSTALLED BETWEEN DRAINS ANDAROUND UNITS.3. RETROFIT DRAINS WILL BE INSTALLED AT ALL LOCATIONS.4.ALL PARAPET/EXISTING FLASHINGS WILL RECEIVE NEW PLYWOOD TO EXISTING BRICK FOR A CLEANWORKING SURFACE FOR EPDM.5. ALL CURBS WILL RECEIVE CRICKETS TO DIRECT WATER AWAY FROM TOP SIDE OF UNIT.6. FLASH ALL DRAINS, CURBS, VENTS, AND STACKS AS SHOWN IN PLANS. MANUFACTURER’SSTANDARD DETAILS AND RECOMMENDATIONS FOR ANY MISCELLANEOUS DETAILS NOT SHOWN INPLANS.7. ALL EXISTING WOOD BLOCKINGS WILL BE REMOVED AND REPLACED WITH COMPOSITE BLOCKS.8. INSTALL NEW WALKWAY PADS AROUND ROOF ACCESS STAIRS AND ROOF TRANSITIONS.9. CONTRACT SHALL INCLUDE ANY MODIFICATIONS, MATERIALS, AND/OR IMPROVEMENTS REQUIREDBY THE ROOF SYSTEM MANUFACTURER TO MEET SPECIFIED WARRANTY.10. STORED MATERIALS - DO NOT EXPOSE MATERIALS VULNERABLE TO WATER OR UV DEGRADATIONIN QUANTITIES GREATER THAN CAN BE APPLIED DURING THE SAME DAY. FLAMMABLE MATERIALSSTORED ON ROOF IS NOT ACCEPTABLE. ONLY FLAMMABLE MATERIALS USED THAT DAY ARE ALLOWEDON ROOF.11. A PORT-A-JOHN IS REQUIRED ON SITE DURING ALL WORK, AS WELL AS A DUMPSTER. BOTH MUSTBE KEPT IN A CLEAN TIDY MANNER AND PLACED IN PREAPPROVED LOCATIONS.12. ACCESS: THIS IS A SECURE FACILITY AND NO ONE SHOULD ENTER THE FACILITY WITHOUTEXPRESS PERMISSION FROM AN OWNER'S REPRESENTATIVE.13. PERFORM ALL WORK IN A PROFESSIONAL MANNER AND AS SPECIFIED IN THESE DOCUMENTS. RAINPRECAUTIONS MUST BE FOLLOWED DAILY; ANY WORK COMPLETED IN RAIN WILL BE TORN OFF ANDREPLACED.14. COORDINATE WORK ACTIVITIES DAILY WITH OWNER DURING COURSE OF THE WORK AND PHASING.15. PROTECT BUILDINGS, ADJACENT BUILDINGS OR STRUCTURES, WALKWAYS, SITE IMPROVEMENTS,LANDSCAPING, EXTERIOR PLANTINGS, VEHICLES, AND OTHER SURFACES FROM SOILING OFOPERATIONS AND CONSTRUCTION DEBRIS AND DUST.16. ALL GRASS ACCESS POINTS WILL BE RETURNED TO THEIR ORIGINAL CONDITION.CDABGFEJINKRMLOPQNot In ContractLEGENDXXXDETAILSROOF DRAINRTUSKY LIGHTSLEEPERPLUMBING STACKPITCH POCKETDEAD CURBNorth Cedar Elementary – Section RProject DatesStart – 6/8/26Finish – 8/3/2611'17'62'5D14D214D2D22D212'2D13D14D1R84'4D228'5D1THE INFORMATION CONTAINED HEREIN IS OFA PROPRIETARY NATURE AND IS SUBMITTEDIN CONFIDENCE FOR USE BY THE CLIENTSAPPROVED BY THE ORIGINATOR OF THISDOCUMENT - ONLY. THE USE OF THESEDOCUMENTS FOR ANY OTHER PROJECTS,PURPOSE, LOCATION, PUBLICATION,REPRODUCTION OR DISTRIBUTION IN WHOLEOR PART, BY ANY INDIVIDUAL ORORGANIZATION WITHOUT WRITTENPERMISSION THE ORIGINATING COMPANY ISPROHIBITED. THE INFORMATION HEREINREMAINS THE PROPERTY AND ITS USE ORDISCLOSURE TO OTHERS IS PROHIBITED FORANY USE NOT AUTHORIZED BY THEORIGINATING COMPANY.APPROVEDFOR BIDDINGCORE SAMPLE: Metal DeckSHEET TITLE:ROOFPLANSHEET NO.A3ALUMINUM DOMESTEEL STUDS, WASHER, AND NUTSCLAMPING RINGALUMINUM FLANGE 18" DIAWOOD NAILERFASTENER12"6" MAXMEMBRANE ADHESIVEMEMBRANEINSULATIONBEAD OF WATER BLOCKDRAIN BOWLDRAIN PIPE16" LONG DRAININSERT TUBEAPPROPRIATEEXPANDINGTAPEBEAD OF WATERBLOCKSUBSTRATE1 TYP. RETROFIT DRAIND1WALLCONTINUOUS BEADOF AP SEALANTCONTINOUOS BEAD OFWATER BLOCKAPPROPRIATE FASTENER 12"O.C. MAX.CONTINUOUS BEAD OF APSEALANTTERMINATION BARAPPROPRIATE FASTENER 12"O.C. MAX.CONTINUOUS BEAD OF WATERBLOCKMETAL COUNTER-FLASHING, 3" MIN.FACEEPDMMEMBRANEBEAD OF APSEALANTQUICK SEAM PIPEFLASHINGBEAD OF LAP SEALANTEPDM MEMBRANE12" FORMFLASHBONDING ADHESIVECONTINUOUSBEAD OF LAPSEALANTINSULATIONUSE APPROPRIATEBONDING ADHESIVESUBSTRATEUSEAPPROPRIATEBASE TIE-IN2 COUNTERFLASHINGD13PIPE BOOTD1STEEL CLAMPING RING3"3"INSULATIONSUBSTRATE1-¼” ROOFNAILS, 12"O.C. MAX.WOOD NAILERMETAL CURBINSULATIONHDFASTENER,12" O.C. MAXWITH APSEALANTWOOD NAILERRTUEPDM MEMBRANEBONDING ADHESIVEWATER BLOCK3" SPLICE TAPE5" FLASHINGEPDM MEMBRANEBONDING ADHESIVEINSULATIONSUBSTRATE4CURBD1FASCIACOVER, 12"LENGTHSCONTINUOUS BEADWATER BLOCKSEALANT#10x2" STEELFASTENERS, 12" O.C.ANCHOR BARWOOD NAILEREPDM MEMBRANEMEMBRANE ADHESIVE½” MIN.WALLINSULATIONSUBSTRATE5METAL EDGED1THE INFORMATION CONTAINED HEREIN IS OFA PROPRIETARY NATURE AND IS SUBMITTEDIN CONFIDENCE FOR USE BY THE CLIENTSAPPROVED BY THE ORIGINATOR OF THISDOCUMENT - ONLY. THE USE OF THESEDOCUMENTS FOR ANY OTHER PROJECTS,PURPOSE, LOCATION, PUBLICATION,REPRODUCTION OR DISTRIBUTION IN WHOLEOR PART, BY ANY INDIVIDUAL ORORGANIZATION WITHOUT WRITTENPERMISSION THE ORIGINATING COMPANY ISPROHIBITED. THE INFORMATION HEREINREMAINS THE PROPERTY AND ITS USE ORDISCLOSURE TO OTHERS IS PROHIBITED FORANY USE NOT AUTHORIZED BY THEORIGINATING COMPANY.APPROVEDFOR BIDDINGSHEET TITLE:DETAILSSHEET NO.D1POURABLE SEALERMETAL PENETRATION POCKETWOOD NAILER1-¼” HOT DIPPED GALVANIZED ROOFNAILS AT 4" O.C. MAX..90" EPDM MEMBRANECONTINUOUS BEADOF LAP SEALANTINSULATIONSUBSTRATE1"MIN.1 PITCH POCKETD2USEAPPROPRIATETIE-IN12" FORMFLASH9" FORMFLASHACCEPTABLE PRIMERCONTINUOUS BEAD OF WATER BLOCKCONTINUOUS BEAD OF AP SEALANTBONDING ADHESIVEINSULATIONSUBSTRATE.090 EPDM MEMBRANEAPPROPRIATE BONDING ADHESIVE ½” ABOVE 2"METAL PLATEFASTENER AND 2" METAL PLATE 12" O.C. MAX.RPF STRIPPRIMER.090 EPDM MEMBRANEBONDING ADHESIVEINSULATIONSUBSTRATEWALL3PARAPETD2WOOD SLEEPER SIZED ANDSPACED SO THAT LOADDOES NOT EXCEED 16 PSI2"MININSULATIONSUBSTRATE2SLEEPERD2EPDM PROTECTION LAYEREPDM MEMBRANEADHESIVE1-¼” HOT DIPPEDGALVANIZED ROOF NAILESAT 4" O.C. MAX.SEAM EDGETREATMENTCONTINUOUSPRIMER3" SPLICE TAPEBONDING ADHESIVE.090" EPDMBONDING ADHESIVEINSULATIONSUBSTRATEWOODNAILERFASTENERCOPING ANCHOR CLIPCOPING CAP3" SPLICE TAPE5" FLASHINGWOODNAILERINSULATIONSUBSTRATE4 AREA DIVIDERD2THE INFORMATION CONTAINED HEREIN IS OFA PROPRIETARY NATURE AND IS SUBMITTEDIN CONFIDENCE FOR USE BY THE CLIENTSAPPROVED BY THE ORIGINATOR OF THISDOCUMENT - ONLY. THE USE OF THESEDOCUMENTS FOR ANY OTHER PROJECTS,PURPOSE, LOCATION, PUBLICATION,REPRODUCTION OR DISTRIBUTION IN WHOLEOR PART, BY ANY INDIVIDUAL ORORGANIZATION WITHOUT WRITTENPERMISSION THE ORIGINATING COMPANY ISPROHIBITED. THE INFORMATION HEREINREMAINS THE PROPERTY AND ITS USE ORDISCLOSURE TO OTHERS IS PROHIBITED FORANY USE NOT AUTHORIZED BY THEORIGINATING COMPANY.APPROVEDFOR BIDDINGSHEET TITLE:DETAILSSHEET NO.D2
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238160Roofing Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
7th Avenue at Cedar River Wat...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Cedar Rapids
Bid Due: 7/08/2026
Ruminant Nutrition Laboratory...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Iowa State University
Bid Due: 7/15/2026