HSI Box Hangar - Hastings Municipal Airport CH 2026-08
Project Information
- Bid Title
- HSI Box Hangar - Hastings Municipal Airport CH 2026-08
- Issuing Agency
- City of Hastings
- Location
- Nebraska
- Published Date
- Feb 20, 2026
- Closing Date
- Mar 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
HSI Box Hangar - Hastings Municipal Airport CH 2026-08
- Attachment Preview
-
HSI BOX HANGARHASTINGS MUNICIPAL AIRPORT (HSI)CITY OF HASTINGSHASTINGS, NEBRASKAISSUED FOR BID© 2025 GARVER, LLCTHIS DOCUMENT, ALONG WITH THEIDEAS AND DESIGNS CONVEYEDHEREIN, SHALL BE CONSIDEREDINSTRUMENTS OF PROFESSIONALSERVICE AND ARE PROPERTY OFGARVER, LLC. ANY USE,REPRODUCTION, OR DISTRIBUTIONOF THIS DOCUMENT, ALONG WITHTHE IDEAS AND DESIGN CONTAINEDHEREIN, IS PROHIBITED UNLESSAUTHORIZED IN WRITING BYGARVER, LLC OR EXPLICITLYALLOWED IN THE GOVERNINGPROFESSIONAL SERVICESAGREEMENT FOR THIS WORK.PROJECT SITELOCATION MAPHASTINGS MUNICIPAL AIRPORTBASISVICINITY MAPNO SCALEGARVER PROJECT NO. A27-2501091NOVEMBER 2025233 South 13th StreetSuite 1100Lincoln, NE 68508(913) 312-1809Sheet List TableSNDrawingNumberSheet Title1GI001COVER SHEET2GI101PROJECT LAYOUT & SURVEY CONTROL PLAN3GC001CONSTRUCTION SAFETY AND PHASING NOTES 14GC002CONSTRUCTION SAFETY AND PHASING NOTES 25GC101CONSTRUCTION SAFETY AND PHASING PLAN6GC201CONSTRUCTION SAFETY AND PHASING DETAILS7FS101CODE ANALYSIS8FS102LIFE SAFETY PLAN9CE101EROSION CONTROL PLAN10CE201EROSION CONTROL DETAILS11CD101DEMOLITION PLAN12CD201DEMOLITION DETAILS13CP101SITE LAYOUT PLAN14CP201JOINT DETAILS15CP301PAVING DETAILS16CP302PAVING DETAILS 217CP401FOUNDATION DETAILS18CG101GRADING AND DRAINAGE PLAN19CH101HANGAR LAYOUT PLAN20CF101FENCING DETAILS21EN001ELECTRICAL LEGEND AND NOTES22EL101ELECTRICAL INSTALLATION PLAN23EL501ELECTRICAL ONE-LINE DIAGRAM24EL502ELECTRICAL PANEL SCHEDULE25EL503HANGAR ELECTRICAL PLAN26EL504ELECTRICAL DETAILS 127EL505ELECTRICAL DETAILS 2Digitally Signed 11/21/2025COVER SHEETJOB NO.: A27-2501091DATE: NOV. 2025DESIGNED BY: RSKDRAWN BY: ERABAR IS ONE INCH ONORIGINAL DRAWING01"IF NOT ONE INCH ON THIS SHEET,ADJUST SCALES ACCORDINGLY.DRAWING NUMBERGI001SHEETNUMBER191ANTIQUE AIRCRAFT MUSEUMW2GSSSSGWWSSGOHESS734VEHICLE GATEGWWSSGOHESSSSW. 12TH STREETAPRONWPROPOSED HANGARGWWGSSOHESS© 2025 GARVER, LLCTHIS DOCUMENT, ALONG WITH THEIDEAS AND DESIGNS CONVEYED6HEREIN, SHALL BE CONSIDEREDINSTRUMENTS OF PROFESSIONALSERVICE AND ARE PROPERTY OFGARVER, LLC. ANY USE,8REPRODUCTION, OR DISTRIBUTIONOF THIS DOCUMENT, ALONG WITHTHE IDEAS AND DESIGN CONTAINEDHEREIN, IS PROHIBITED UNLESSAUTHORIZED IN WRITING BY010' 20'40'60'GARVER, LLC OR EXPLICITLYALLOWED IN THE GOVERNINGPROFESSIONAL SERVICES(IN FEET)AGREEMENT FOR THIS WORK.GWWGUGESSSS5EXISTING HOUSEGW#UGEGLEGENDPROPOSED HANGARPROPOSED PAVEMENTSURVEY CONTROL POINTPROPOSED ELECTRICPROPOSED GAS LINEDigitally Signed 11/21/2025NOTES:FBO1. CONTRACTOR SHALL PROTECT ALL SURVEYCONTROL POINTS, EXISTING UTILITIES, ANDPAVEMENT DURING CONSTRUCTION. ANYDAMAGES INCLUDING BUT NOT LIMITED TOFLOODING, PHYSICAL DAMAGE, UTILITY ORDISRUPTION OF UTILITIES, ETC., CAUSED BYCONSTRUCTION ACTIVITIES SHALL BEREPAIRED BY THE CONTRACTOR AT NOEXPENSE TO THE OWNER. ALL REPAIRSSHALL BE COORDINATED WITH THEENGINEER AND A LICENSED SURVEYOR FORSURVEY MONUMENTS. FINAL RESULTS OFTHE RE-SET MONUMENT SHALL BESUBMITTED TO THE ENGINEER FORAPPROVAL.2. CONTRACTOR SHALL VERIFY CONTROLPOINTS AND NOTIFY ENGINEER OF ANYDISCREPANCIES PRIOR TO BEGINNINGCONSTRUCTION.GSSSSSS3. BASIS FOR BEARINGS SHOWN HERIN IS THEKANSAS STATE PLANE COORDINATE SYSTEM,NORTH AMERICAN DATUM OF 1983 (NAD83),NEBRASKA STATE PLANE NO. NE83F.WOHESSGGSS SSSSWGGOHEGOHECONTROL POINTSPOINT # NORTHING EASTING ELEVATIONDESCRIPTION1282354.55 2077459.72 1943.23BRASS PLATE 2.3' ABOVE GROUND2282254.22 2077509.84 1943.79TOP OF FIRE HYDRANT3282253.46 2077560.26 1941.78 TOP CENTER OF NW ANCHOR BOLT4282254.02 2077599.58 1942.04 TOP CENTER OF NW ANCHOR BOLT5282323.09 2077698.43 1941.88USGS DISC SET IN CONCRETE6282630.52 2077903.08 1938.99USGS DISC SET IN CONCRETE7282850.70 2077649.54 1936.89 WESTERN MOST HEX BOLT ON SIGN8282959.93 2078557.04 1937.55STEEL ROD PLATE9284297.69 2077118.48 1943.54USGS DISC SET IN CONCRETEITEMS OF WORK· INSTALL STAGING AREA AND EROSIONCONTROL DEVICES.· COMPLETE EARTHWORK AND UTILITYRELOCATIONS.· CONSTRUCT BUILDING FOUNDATIONAND CONCRETE PAVEMENT.· CONSTRUCT BUILDING ANDELECTRICAL HOOKUPS.· CLEAN UP STAGING AREA ANDREMOVE EROSION CONTROL DEVICES.PROJECT LAYOUT &SURVEY CONTROLPLANJOB NO.: A27-2501091DATE: NOV. 2025DESIGNED BY: RSKDRAWN BY: ERABAR IS ONE INCH ONORIGINAL DRAWING01"IF NOT ONE INCH ON THIS SHEET,ADJUST SCALES ACCORDINGLY.DRAWING NUMBERGI101SHEETNUMBER21. COORDINATIONA. CONTRACTOR PROGRESS MEETINGS - THE OWNER, ENGINEER AND CONTRACTOR WILL HOLD PROGRESS MEETINGS ON A COORDINATED SCHEDULEDURING CONSTRUCTION. OPERATIONAL SAFETY WILL BE A STANDING AGENDA ITEM IN SUCH MEETINGS.B. SCOPE OR SCHEDULE CHANGES - THE OWNER AND/OR ENGINEER WILL CALL SUCH COORDINATION CONFERENCES AS MAY SEEM EXPEDIENT TO HIM FORTHE PURPOSE OF ASSURING COORDINATION OF THE WORK COVERED BY THIS CONTRACT AND/OR SCOPE OR SCHEDULE CHANGES. THE CONTRACTORSHALL ATTEND ALL SUCH CONFERENCES.C. FAA ATO COORDINATION - NOT REQUIRED.2. PHASINGDURING PERFORMANCE OF THIS PROJECT, THE AIRPORT RUNWAYS, TAXIWAYS, AND AIRCRAFT PARKING APRONS SHALL REMAIN IN USE BY AIRCRAFT TO THEMAXIMUM EXTENT POSSIBLE. THE PROJECT SHALL BE PHASED TO REDUCE OPERATIONAL IMPACTS AT THE AIRPORT.A. PHASE ELEMENTS - IF NECESSARY FOR A GIVEN PHASE, EACH PHASE OF THE CONSTRUCTION SAFETY DRAWINGS SHALL DETAIL THE AREAS CLOSED TOAIRCRAFT OPERATIONS, ESTIMATED DURATION OF CLOSURES, TAXI ROUTES, ARFF ACCESS ROUTES, CONSTRUCTION STAGING AREAS, CONSTRUCTIONACCESS AND HAUL ROUTES, NAVAID IMPACTS, LIGHTING AND MARKING CHANGES, AVAILABLE RUNWAY LENGTH, DECLARED DISTANCES, HAZARD MARKINGAND LIGHTING, AND REQUIRED LEAD TIME FOR NOTAMS.B. CONSTRUCTION SAFETY DRAWINGS - SEE SHEET GC101 FOR CONSTRUCTION SAFETY DRAWINGS.3. AREAS OF OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITYA. IDENTIFICATION OF AFFECTED AREAS - GENERAL AVIATION APRON SEE CONSTRUCTION SAFETY DRAWINGS FOR AIRFIELD AREAS OF OPERATIONSAFFECTED BY CONSTRUCTION.B. MITIGATION EFFORTS - SEE CONSTRUCTION SAFETY DRAWINGS FOR MITIGATION EFFORTS OF OPERATIONS AFFECTED BY CONSTRUCTION.4. PROTECTION OF NAVIGATION AIDS (NAVAIDS)THE CONTRACTOR MUST NOT CONDUCT ANY CONSTRUCTION ACTIVITY WITHIN NAVIGATIONAL AID RESTRICTED AREAS WITHOUT PRIOR APPROVAL FROM THELOCAL FAA AIRWAY FACILITIES SECTOR REPRESENTATIVE. NAVIGATIONAL AIDS INCLUDE INSTRUMENT LANDING SYSTEM COMPONENTS, VERYHIGH-FREQUENCY OMNI-DIRECTIONAL RANGE STATIONS, AND AIRPORT SURVEILLANCE RADAR. SUCH RESTRICTED AREAS ARE DEPICTED ON CONSTRUCTIONPLANS. [PLANNED CONSTRUCTION ACTIVITIES WILL HAVE NO NEGATIVE IMPACTS ON THE FUNCTIONALITY AND SERVICEABILITY OF THE NAVAIDS.]5. CONTRACTOR ACCESSA. LOCATION OF STOCKPILED MATERIALS - THE CONTRACTOR SHALL INSTALL A TEMPORARY FENCE AROUND HIS CONSTRUCTION STAGING AREA TOSEPARATE HIS BATCH PLANT, MATERIAL STOCKPILE, EQUIPMENT STORAGE, AND PARKING AREAS FROM THE PUBLIC. NO PERSONAL VEHICLES OFCONTRACTOR'S EMPLOYEES WILL BE ALLOWED INSIDE THE SECURED AREA OF THE AIRPORT. ALL MATERIAL DELIVERIES SHALL BE RECEIVED IN THESTAGING AREA RESERVED BY THE CONTRACTOR. NO DELIVERY TRUCKS WILL BE ALLOWED ACCESS TO A SECURED AREA OF THE AIRPORT BEYOND THISSTAGING AREA. STOCKPILED MATERIALS AND EQUIPMENT ARE NOT PERMITTED WITHIN THE ACTIVE RUNWAY SAFETY AREA AND OBSTACLE FREE ZONE.THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER AND FAA AIR SPACING OFFICE PRIOR TO LOCATING STOCKPILES OR EQUIPMENTWITHIN THE OBJECT FREE AREA, SAFETY AREA, OR OBSTACLE FREE ZONE. NO STOCKPILE SHALL BE GREATER THAN 15-FT IN HEIGHT.B. VEHICLE AND PEDESTRIAN OPERATIONS - SEE THE CONSTRUCTION SAFETY DRAWINGS FOR CONSTRUCTION SITE PARKING, EQUIPMENT STORAGE AREAS,AND ACCESS AND HAUL ROUTES. VEHICULAR TRAFFIC SHALL ALWAYS YIELD TO AIRCRAFT TRAFFIC.WHEN ANY VEHICLE, OTHER THAN ONE THAT HAS PRIOR APPROVAL FROM THE AIRPORT OPERATOR, MUST TRAVEL OVER ANY PORTION OF AN AIRCRAFTMOVEMENT AREA, IT WILL BE ESCORTED AND PROPERLY IDENTIFIED. TO OPERATE IN THOSE AREAS DURING DAYLIGHT HOURS, THE VEHICLE MUST HAVE AFLAG OR BEACON ATTACHED TO IT. ANY VEHICLE OPERATING ON THE MOVEMENT AREAS DURING HOURS OF DARKNESS OR REDUCED VISIBILITY MUST BEEQUIPPED WITH AN AMBER COLOR FLASHING DOME-TYPE LIGHT.ALL CONSTRUCTION VEHICLES SHALL BE CLEARLY IDENTIFIED FOR CONTROL PURPOSES BY PROMINENTLY DISPLAYING THE COMPANY NAME ON EACHSIDE OF THE VEHICLE. THE IDENTIFICATION SYMBOLS SHOULD BE A MINIMUM 8-INCH BLOCK-TYPE CHARACTERS OF A CONTRASTING COLOR AND EASY TOREAD. THEY MAY BE APPLIED EITHER BY USING TAPE OR A WATER-SOLUBLE PAINT TO FACILITATE REMOVAL. MAGNETIC SIGNS ARE ALSO ACCEPTABLE.C. CONTROL OF GATES - THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE SECURITY OF THE ACCESS GATES BY KEEPING THE ACCESS GATELOCKED OR GUARDED AT ALL TIMES. SHOULD THE CONTRACTOR FAIL, AT ANY TIME, TO KEEP THE ACCESS GATE LOCKED OR GUARDED, THERE SHALL BE AFINE OF $200.00 ASSESSED TO THE CONTRACTOR, FOR EACH OCCURRENCE THAT THE CONTRACTOR FAILS TO MAINTAIN THE SECURITY OF THE ACCESSGATE. ALL FINES ASSESSED TO THE CONTRACTOR SHALL BE DEDUCTED FROM ANY PAYMENT DUE TO HIM/HER.6. WILDLIFE MANAGEMENTIF APPLICABLE, THE CONTRACTOR SHALL REVIEW AND ADHERE TO THE CONTENTS OF THE AIRPORT OPERATOR'S WILDLIFE HAZARD MANAGEMENT PLAN. THECONTRACTOR SHALL ALSO REVIEW AC 150/5200-33, HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS, AND CERTALERT 98-05, GRASSESATTRACTIVE TO HAZARDOUS WILDLIFE (www.faa.gov). THE CONTRACTOR SHALL CAREFULLY CONTROL AND CONTINUOUSLY REMOVE WASTE OR LOOSEMATERIALS THAT MIGHT ATTRACT WILDLIFE. CONTRACTOR PERSONNEL MUST BE AWARE OF AND AVOID CONSTRUCTION ACTIVITIES THAT CAN CREATEWILDLIFE HAZARDS ON AIRPORTS. THE CONTRACTOR SHALL MITIGATE THE FOLLOWING ITEMS.A. TRASH - THE CONTRACTOR SHALL PERFORM TRASH CLEAN-UP ON A DAILY BASIS.B. STANDING WATER - THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE DURING CONSTRUCTION TO AVOID STANDING WATER.C. POORLY MAINTAINED FENCING AND GATES - THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DAMAGE TO GATES OR FENCES. THE CONTRACTOR WILLBE RESPONSIBLE FOR REPAIRS TO ANY GATES OR FENCES CAUSED BY NEGLIGENCE BY THE CONTRACTOR.D. DISRUPTION OF EXISTING WILDLIFE HABITAT - THE CONTRACTOR SHALL NOTIFY THE AIRPORT IMMEDIATELY OF ANY WILDLIFE SIGHTINGS.7. FOREIGN OBJECT DEBRIS (FOD) MANAGEMENTTHE CONTRACTOR SHALL ENSURE THAT THE PAVEMENT SURFACES ARE KEPT CLEAN FROM DIRT, MUD, AND OTHER DEBRIS FROM THE CONTRACTOR'SEQUIPMENT. FREQUENT CLEAN UP IN THE VICINITY OF CONTRACTOR'S WORK AREAS IS REQUIRED. SEE AC 150/5210-24, FOREIGN OBJECT DEBRIS (FOD)MANAGEMENT (www.faa.gov) FOR FURTHER INSTRUCTION.8. HAZARDOUS MATERIALS (HAZMAT) MANAGEMENTIF ANY CONSTRUCTION VEHICLE OR EQUIPMENT IS OPERATED WITHIN AIRPORT PROPERTY, THE CONTRACTOR MUST BE ADEQUATELY PREPARED TOEXPEDITIOUSLY CONTAIN AND CLEAN-UP SPILLS RESULTING FROM FUEL OR HYDRAULIC FLUID LEAKS. SPECIAL CARE MUST ALSO BE TAKEN WHEN HANDLINGOR TRANSPORTING HAZARDOUS MATERIALS ON AIRPORT PROPERTY. SEE AC 150/5320-15, MANAGEMENT OF AIRPORT INDUSTRIAL WASTE (www.faa.gov), FORFURTHER INSTRUCTION.9. NOTIFICATION OF CONSTRUCTION ACTIVITIESA. LIST OF RESPONSIBLE REPRESENTATIVES - A POINT OF CONTACT LIST WILL BE COMPLETED AS PART OF THE SAFETY PLAN COMPLIANCE DOCUMENT(SPCD) AND WILL BE DELIVERED TO ALL PARTIES PRIOR TO CONSTRUCTION.B. NOTICES TO AIR MISSIONS (NOTAM) - BEFORE BEGINNING ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR MUST, THROUGH THE AIRPORT OPERATOR,GIVE NOTICE USING THE NOTAM SYSTEM OF PROPOSED LOCATION, TIME, AND DATE OF COMMENCEMENT OF CONSTRUCTION. UPON COMPLETION OFWORK AND RETURN OF ALL SUCH AREAS TO STANDARD CONDITIONS, THE CONTRACTOR MUST, THROUGH THE AIRPORT OPERATOR, VERIFY THECANCELLATION OF ALL NOTICES ISSUED VIA THE NOTAM SYSTEM.C. EMERGENCY NOTIFICATION PROCEDURES - IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL CALL 911, THEN NOTIFY THE ENGINEER ANDAIRPORT MANAGER.D. NOTIFICATION TO THE FAA - THE CONTRACTOR SHALL ENSURE, THROUGH THE ENGINEER, THAT ALL CONSTRUCTION EQUIPMENT OVER 75 FT IN HEIGHT ISAIR SPACED THROUGH THE APPROPRIATE FAA REGIONAL OR DISTRICT OFFICE PRIOR TO USING SUCH EQUIPMENT ON SITE.E. SHUTDOWN OF ANY NAVAID (AIRPORT OR FAA OWNED) SHALL BE COORDINATED WITH THE FAA ATO 45 DAYS PRIOR TO THE PROPOSED SHUTDOWN.THECONTRACTOR SHALL PROVIDE AN ADDITIONAL SEVEN DAYS ADVANCE NOTICE TO THE AIRPORT TO COORDINATE WITH THE FAA ATO TECH OPS OFFICERESPONSIBLE FOR THE FAA FACILITIES. SHUTDOWN OF AN AIRPORT OWNED AND FAA MAINTAINED NAVAID OF 24 HOURS OR GREATER, OR MORE THAN 4HOURS DAILY ON CONSECUTIVE DAYS, SHALL BE COORDINATED WITH THE FAA ATO A MINIMUM OF 45 DAYS PRIOR TO THE SHUTDOWN.10. INSPECTION REQUIREMENTSA. DAILY INSPECTIONS - THE CONTRACTOR SHALL PERFORM DAILY SAFETY INSPECTIONS TO VERIFY ALL CONSTRUCTION OPERATIONS ARE INCONFORMANCE WITH THE CONSTRUCTION SAFETY AND PHASING PLAN (CSPP).B. INTERIM INSPECTIONS - PRIOR TO OPENING ANY PORTION OF THE AIRPORT TO TRAFFIC, THE CONTRACTOR, ENGINEER, AND AIRPORT OPERATOR SHALLPERFORM A SAFETY INSPECTION OF THE AREA TO BE OPENED TO TRAFFIC TO VERIFY CONFORMANCE WITH THE CSPP AND FAA STANDARDS.C. FINAL INSPECTIONS - PRIOR TO OPENING ANY PORTION OF THE AIRPORT TO TRAFFIC, THE CONTRACTOR, ENGINEER, AND AIRPORT OPERATOR SHALLPERFORM A SAFETY INSPECTION OF THE AREA TO BE OPENED TO TRAFFIC TO VERIFY CONFORMANCE WITH THE CSPP AND FAA STANDARDS.11. UNDERGROUND UTILITIESUNDERGROUND UTILITIES EXIST WITHIN AND ADJACENT TO THE LIMITS OF CONSTRUCTION. AN ATTEMPT HAS BEEN MADE TO LOCATE THESE UTILITIES ON THEPLANS. HOWEVER, ALL EXISTING UTILITIES MAY NOT BE SHOWN AND THE ACTUAL LOCATIONS OF THE UTILITIES MAY VARY FROM THE LOCATIONS SHOWN.PRIOR TO BEGINNING ANY TYPE OF EXCAVATION, THE CONTRACTOR SHALL CONTACT THE UTILITIES INVOLVED AND MAKE ARRANGEMENTS FOR THE LOCATIONOF THE UTILITIES ON THE GROUND. THE CONTRACTOR SHALL MAINTAIN THE UTILITY LOCATION MARKINGS UNTIL THEY ARE NO LONGER NECESSARY.NEBRASKA STATE LAW, THE UNDERGROUND FACILITIES DAMAGE PREVENTION ACT, REQUIRES TWO WORKING DAYS ADVANCE NOTIFICATION THROUGH THEONE-CALL SYSTEM CENTER BEFORE EXCAVATING USING MECHANIZED EQUIPMENT OR EXPLOSIVES (EXCEPT IN THE CASE OF AN EMERGENCY). THE ONE-CALLSYSTEM PHONE NUMBER IS 1-800-331-5666. THE CONTRACTOR IS ADVISED THAT THERE IS A SEVERE PENALTY FOR NOT MAKING THIS CALL. NOT ALL UTILITYCOMPANIES ARE MEMBERS OF THE NEBRASKA ONE-CALL SYSTEM; THEREFORE, THE CONTRACTOR IS ADVISED TO CONTACT ALL NON-MEMBER UTILITIES ASWELL AS THE ONE-CALL SYSTEM.12. PENALTIESFAILURE OF THE CONTRACTOR (INCLUDING EMPLOYEES) OR ANY OF HIS SUBCONTRACTORS (INCLUDING EMPLOYEES) TO COMPLY WITH AIRPORTINSTRUCTIONS, THE AIRPORT SAFETY PLAN, FAA AC 150/5370-2G, OR ANY OF THE OTHER REQUIREMENTS OF THE AIRPORT WHILE OPERATING ON AIRPORTPROPERTY, SHALL BE SUBJECT TO THE LOSS OF DRIVING PRIVILEGES ON THE AIRPORT, SUSPENSION OF WORK, AND ANY FINES OR PENALTIES IMPOSED ONTHE AIRPORT AS A RESULT OF THE INCIDENT. THE CONTRACTOR (INCLUDING EMPLOYEES) AND ANY OF HIS SUBCONTRACTORS (INCLUDING EMPLOYEES) WHOWILL OPERATE GROUND VEHICLES ON THE AIRPORT MAY BE REQUIRED TO SUCCESSFULLY COMPLETE FORMALIZED AIRPORT SAFETY TRAINING CONDUCTEDBY AIRPORT STAFF. WHEN THE CONTRACTOR'S EMPLOYEES HAVE COMPLETED AIRPORT SAFETY TRAINING TO THE SATISFACTION OF THE OWNER, WORK MAYCONTINUE AT THE DISCRETION OF THE OWNER. CONTRACT TIME SHALL NOT BE EXTENDED FOR RELATED WORK STOPPAGES.© 2025 GARVER, LLCTHIS DOCUMENT, ALONG WITH THEIDEAS AND DESIGNS CONVEYEDHEREIN, SHALL BE CONSIDEREDINSTRUMENTS OF PROFESSIONALSERVICE AND ARE PROPERTY OFGARVER, LLC. ANY USE,REPRODUCTION, OR DISTRIBUTIONOF THIS DOCUMENT, ALONG WITHTHE IDEAS AND DESIGN CONTAINEDHEREIN, IS PROHIBITED UNLESSAUTHORIZED IN WRITING BYGARVER, LLC OR EXPLICITLYALLOWED IN THE GOVERNINGPROFESSIONAL SERVICESAGREEMENT FOR THIS WORK.Digitally Signed 11/21/2025CONSTRUCTIONSAFETY AND PHASINGNOTES 1JOB NO.: A27-2501091DATE: NOV. 2025DESIGNED BY: RSKDRAWN BY: ERABAR IS ONE INCH ONORIGINAL DRAWING01"IF NOT ONE INCH ON THIS SHEET,ADJUST SCALES ACCORDINGLY.DRAWING NUMBERGC001SHEETNUMBER313. SPECIAL CONDITIONSNONE.14. RUNWAY AND TAXIWAY VISUAL AIDSA. GENERAL - ALL AIRPORT MARKINGS, LIGHTING, SIGNS, AND VISUAL NAVAIDS THAT ARE IN OPERATION MUST BE CLEAR FROM ALL OBSTRUCTIONS. ALLTEMPORARY MARKINGS, SIGNS, LIGHTS, OR OTHER VISUAL AIDS MUST BE SECURED IN PLACE TO PREVENT DAMAGE OR DISPLACEMENT BY PROP WASH,JET BLAST, WING VORTICES, OR OTHER WIND CURRENTS.B. MARKINGS - ALL TEMPORARY OR PERMANENT RUNWAY AND TAXIWAY VISUAL AIDS SHALL CONFORM TO THE REQUIREMENTS OF THE MOST RECENTEDITION OF FAA AC 150/5340-1 (www.faa.gov).C. LIGHTING AND VISUAL NAVAIDS - ALL TEMPORARY LIGHTING FOR RUNWAY AND TAXIWAY SYSTEMS SHALL CONFORM TO THE REQUIREMENTS OF THEMOST RECENT EDITION OF FAA AC 150/5340-30 AND 150/5345-50 (www.faa.gov). NO TEMPORARY LIGHTING IS ANTICIPATED.D. SIGNS - THE CONTRACTOR SHALL INSTALL ALL SIGNS IN ACCORDANCE WITH THE MOST RECENT EDITION OF FAA AC 150/5345-44 AND 150/5340-18. ANY SIGNTHAT IS NOT PERFORMING ITS NORMAL FUNCTION MUST BE COVERED OR REMOVED TO PREVENT MISLEADING PILOTS.15. MARKING AND SIGNS FOR ACCESS ROUTESTHE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL NECESSARY MARKINGS AND SIGNAGE FOR ALL ACCESS ROUTES TO ANDFROM THE SITE TO BE USED BY CONTRACTOR PERSONNEL, SUBCONTRACTOR PERSONNEL, OR DELIVERY OPERATIONS. ALL SIGNAGE IN THE AIR OPERATIONSAREA SHALL BE FRANGIBLY MOUNTED.16. HAZARD MARKING AND LIGHTINGA. PURPOSE - HAZARD MARKING AND LIGHTING PREVENTS PILOTS FROM ENTERING AREAS CLOSED TO AIRCRAFT AND PREVENTS CONTRACTOR PERSONNELFROM ENTERING AREAS OPEN TO AIRCRAFT.B. EQUIPMENT - THE CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN LOW-PROFILE BARRICADES IN HAZARDOUS AREAS INSIDE MOVEMENT AREAS.BARRICADES SHALL RESTRICT ACCESS AND MAKE HAZARDS OBVIOUS TO AIRCRAFT, PERSONNEL, AND VEHICLES. DURING PERIODS OF LOW VISIBILITY ANDAT NIGHT, BARRICADES SHALL BE EQUIPPED WITH RED FLASHING OR STEADY BURNING LIGHTS. THE SPACING OF BARRICADES SHALL BE SUCH THAT ABREACH IS PHYSICALLY PREVENTED BARRING A DELIBERATE ACT. IF BARRICADES ARE INTENDED TO PREVENT PEDESTRIANS, THEN THEY SHALL BELINKED. SEE DETAILS ON CONSTRUCTION SAFETY DRAWINGS FOR LOW-PROFILE AIRCRAFT BARRICADE DETAIL.17. WORK ZONE LIGHTING FOR NIGHTTIME CONSTRUCTIONALL WORK CONDUCTED AT NIGHT SHALL BE ACCOMPANIED BY ADEQUATE LIGHT FACILITIES TO COMPLETE THE WORK. ALL LIGHT FACILITIES SHALL BE AIMEDOR SHIELDED AS NECESSARY TO AVOID IMPACTING AIRCRAFT OR ATCT OPERATIONS. THE CONTRACTOR SHALL BE REQUIRED TO SUBMIT A LIGHTING PLANSHOWING THE LOCATION AND AIMING DIRECTION OF ALL LIGHT FACILITIES PRIOR TO THE COMPLETION OF ANY NIGHT WORK.18. PROTECTION OF SAFETY AREAS, OBJECT FREE AREAS, OBJECT FREE ZONES, AND APPROACH/DEPARTURE SURFACES.A. RUNWAY SAFETY AREAS (RSA) - NO WORK SHALL BE PERMITTED WITHIN AN ACTIVE RUNWAY SAFETY AREA.B. RUNWAY OBJECT FREE AREAS (ROFA) - NO MATERIAL SHALL BE STOCKPILED INSIDE THE LIMITS OF THE ACTIVE ROFA.C. TAXIWAY SAFETY AREAS (TSA) - NO WORK SHALL BE PERMITTED WITHIN AN ACTIVE TSA.D. TAXIWAY OBJECT FREE AREAS (TOFA) - NO CONSTRUCTION SHALL BE PERMITTED INSIDE AN ACTIVE TOFA.E. OBSTACLE FREE ZONE (OFZ) - NO PERSONNEL, MATERIAL, OR EQUIPMENT SHALL PENETRATE THE OFZ WHILE THE RUNWAY IS OPEN TO OPERATIONS.THE DIMENSIONS OF THE OFZ ARE AS DEFINED IN FAA AC 150/5300-13 (www.faa.gov).F. APPROACH/DEPARTURE SURFACES - ALL CONTRACTOR PERSONNEL, MATERIALS, AND EQUIPMENT SHALL REMAIN CLEAR OF THE APPLICABLE THRESHOLDSITING SURFACES AS DEFINED IN CHAPTER 3 OF FAA AC 150/5300-13 (www.faa.gov). CONSTRUCTION ACTIVITIES THAT REQUIRE PENETRATION INTO THETHRESHOLD SITING SURFACE SHALL BE ACCOMPLISH THROUGH DISPLACING OR PARTIALLY CLOSING THE RUNWAY. SUCH CONSTRUCTION ACTIVITIESSHALL REQUIRE COORDINATION WITH THE FAA AIRPORTS REGIONAL OR DISTRICT OFFICE.19. OTHER LIMITATIONS ON CONSTRUCTIONA. PROHIBITIONS - THE USE OF TALL EQUIPMENT (I.E. CRANES, CONCRETE PUMPS) IS LIMITED TO 75-FT HEIGHT UNLESS APPROVED BY THE ENGINEER.OPEN FLAME WELDING AND TORCH CUTTING OPERATIONS ARE NOT PERMITTED UNLESS ADEQUATE FIRE SAFETY PRECAUTIONS ARE PROVIDED ANDTHESE OPERATIONS ARE AUTHORIZED BY THE AIRPORT OPERATOR AND THE ENGINEER.ELECTRICAL BLASTING CAPS SHALL NOT BE PERMITTED WITHIN 1,000-FT OF THE AIRPORT PROPERTY. FLARE POTS ARE NOT PERMITTED WITHIN THE AIROPERATIONS AREA.RESTRICTIONS - OTHER AIRFIELD PROJECTS MAY BE ONGOING CONCURRENT WITH THIS PROJECT. WORK AREAS, STAGING AREAS, AND HAUL ROUTES MAYOVERLAP. CONTRACTOR SHALL COORDINATE CONSTRUCTION OPERATIONS WITH OTHER PROJECTS.© 2025 GARVER, LLCTHIS DOCUMENT, ALONG WITH THEIDEAS AND DESIGNS CONVEYEDHEREIN, SHALL BE CONSIDEREDINSTRUMENTS OF PROFESSIONALSERVICE AND ARE PROPERTY OFGARVER, LLC. ANY USE,REPRODUCTION, OR DISTRIBUTIONOF THIS DOCUMENT, ALONG WITHTHE IDEAS AND DESIGN CONTAINEDHEREIN, IS PROHIBITED UNLESSAUTHORIZED IN WRITING BYGARVER, LLC OR EXPLICITLYALLOWED IN THE GOVERNINGPROFESSIONAL SERVICESAGREEMENT FOR THIS WORK.Digitally Signed 11/21/2025CONSTRUCTIONSAFETY AND PHASINGNOTES 2JOB NO.: A27-2501091DATE: NOV. 2025DESIGNED BY: RSKDRAWN BY: ERABAR IS ONE INCH ONORIGINAL DRAWING01"IF NOT ONE INCH ON THIS SHEET,ADJUST SCALES ACCORDINGLY.DRAWING NUMBERGC002SHEETNUMBER4LEAVE GAP IN BARRICADESAS REQUIRED FORCONSTRUCTION TRAFFICAPRON122'INSTALL LOW PROFILE1BARRICADESGC-201ESANTIQUE AIRCRAFT MUSEUMPROPOSED HANGARALIGN BARRICADES ON BACK SIDEOF GATE TO AVOID RESTRICTINGACCESS. GATE SHALL REMAINOPERATIONAL AT ALL TIMESW. 12TH STREETEPEXISTING HOUSEINSTALL TEMPORARY CHAIN-LINK 3CONSTRUCTION FENCEGC-201INSTALL SAFETY MEASURES ASREQUIRED BY UTILITY PERMIT010' 20'40'(IN FEET)© 2025 GARVER, LLCTHIS DOCUMENT, ALONG WITH THEIDEAS AND DESIGNS CONVEYEDHEREIN, SHALL BE CONSIDEREDINSTRUMENTS OF PROFESSIONALSERVICE AND ARE PROPERTY OFGARVER, LLC. ANY USE,REPRODUCTION, OR DISTRIBUTIONOF THIS DOCUMENT, ALONG WITHTHE IDEAS AND DESIGN CONTAINEDHEREIN, IS PROHIBITED UNLESSAUTHORIZED IN WRITING BY60'GARVER, LLC OR EXPLICITLYALLOWED IN THE GOVERNINGPROFESSIONAL SERVICESAGREEMENT FOR THIS WORK.LEGENDPROPOSED HANGARPROPOSED PAVEMENTPROPOSED TEMPORARY FENCECONSTRUCTION WORK AREACONTRACTOR HAUL ROUTELOW PROFILE BARRICADESES EP CONTRACTOR STAGING AREADigitally Signed 11/21/2025FBONOTES:1. ALL CLEAN UP AND RESTORATION OF THESTAGING AREA SHALL BE SUBSIDIARY TOC-105 "MOBILIZATION".2. CONDITION OF CONTRACTOR STAGING ANDSURROUNDING AREA SHALL BE RESTOREDBACK TO EXISTING CONDITIONS AFTERCONSTRUCTION.3. CONTRACTOR SHALL COORDINATE WITHOWNER TO ISSUE NOTAM AT BEGINNING OFCONSTRUCTION AND RESCIND NOTAM AT ENDOF CONSTRUCTION.4. TEMPORARY FENCE MUST BE INSTALLED ANDMAINTAINED TO ENSURE AIRPORT SECURITYAT ALL TIMES.5. DELIVERIES TO WORK SITE MUST BEESCORTED AT ALL TIMES.ITEMS OF WORK· INSTALL STAGING AREA, EROSIONCONTROL DEVICES, AND SAFETYMEASURES· COMPLETE PAVEMENT REMOVALSAND UTILITY REMOVALS· COMPLETE EARTHWORK ANDGRADING· CONSTRUCT HANGAR FOUNDATIONAND CONCRETE PAVEMENT· CONSTRUCT HANGAR AND UTILITYHOOKUPS· CLEAN UP STAGING AREA, REMOVEEROSION CONTROL DEVICES ANDSAFETY MEASURES.CONSTRUCTIONSAFETY AND PHASINGPLANJOB NO.: A27-2501091DATE: NOV. 2025DESIGNED BY: ERADRAWN BY: ERABAR IS ONE INCH ONORIGINAL DRAWING01"IF NOT ONE INCH ON THIS SHEET,ADJUST SCALES ACCORDINGLY.DRAWING NUMBERGC101SHEETNUMBER5
- Commodity Codes
-
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Parkview Cemetery Paving Phas...
Parkview Cemetery Paving Phase 6 CH 2026-38 Open: 2026-06-26 Status: Active Department: Engineering
City of Hastings
Bid Due: 7/15/2026