RFP: 1237 Lincoln Avenue Stabilization
Project Information
- Bid Title
- RFP: 1237 Lincoln Avenue Stabilization
- Issuing Agency
- The Port Hamilto County
- Location
- Ohio
- Published Date
- Dec 29, 2025
- Closing Date
- Jan 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Due Date: January 13, 2026 by NoonThe Hamilton County Landbank, a managed entity of The Port, is planning to stabilize 1237 Lincoln Ave, Cincinnati, Ohio 45206.
We will conduct a pre-bid conference on Tuesday, December 30th, 2025. Please review the below linked RFP. If you are unable to attend the pre-bid meeting, you will be granted access once you have returned a liability waiver.
1237 Lincoln After Cleanout - Property Pictures
Important Dates:Pre-Bid conference: Tuesday, December 30, 2025
Proposals Due: January 13, 2026 by noon
Please include a 10-15% contingency within your proposals.
Please refer all inquiries and submissions to:Luke Herrmann
513.632.3756
The Port of Greater Cincinnati Development Authority
221 East 4th Street, Suite 200
Cincinnati, Ohio 45202
- Attachment Preview
-
1237 Lincoln Ave-StabilizationREQUEST FOR PROPOSALSSection 1 GeneralThe HCLRC is an Ohio non-profit community improvement corporation organized and existing underOhio Revised Code Chapters 1724 and 1702. The HCLRC, also known as “The Landbank,” is a quasi-governmental entity that is tasked with taking on blighted, vacant, and unproductive structures andworking to put them back into good use. The Landbank works throughout Hamilton County andcurrently owns over 900 properties.To accomplish this, the Landbank is looking for proposals from qualified and registered generalcontractors to complete a stabilization. The contractor shall perform all labor, material procurement,and installation required to stabilize the building so that it meets the Vacated Building MaintenanceStandards (CBC §1101-79.4) and ensures it is secured, weatherproof, structurally safe, and sanitary asrequired by VBML regulations.To be included in the RFP announcement email, please send an inquiry to Luke Herrmann atlherrmann@cincinnatiport.org. Please feel free to reach out with any other questions as well.Section 2 ScheduleWeek 1Week 2Week 3-4Week 5Week 6-7selection.RFP is announced.After Liability Waivers are signed and returned, access will be given via temporary code.Contractors create proposals.Final Proposals are due back The LandbankThe Landbank evaluates and selects the best bid, notifying all contractors of the finalSection 3 Pre-Bid Stabilization ConferenceTuesday, December 30, 2025, from 12:00 PM to 1:00 PMSection 4 Proposals DueJanuary 13, 2025, at noon.Office: 513.632.3756 | Email: lherrmann@cincinnatiport.org221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 4Refer all inquiries and submissions to:Luke Herrmannlherrmann@cincinnatiport.com513.632.3723The Port Authority of Greater Cincinnati221 East 4th Street Suite 200Cincinnati, Oh 45202Section 5 Stabilization RequirementsScope of Work Tasks1. Secure Building Openings• Install secure, weather-tight barriers on all broken, missing, or compromised openings, includingwindows, doors, areaways, and other penetrations.• Plywood covers must be minimum ½-inch CDX, weather-protected, tightly fit, and fastened usingscrews or bolts (no nails) .• Prevent entry by trespassers, birds, and vermin.2. Weatherproof Roofing System• Inspect roof, flashing, and drainage.• Repair or replace roofing materials to ensure the roof is sound, tight, and moisture-proof.• Ensure roof drainage prevents water penetration and deterioration of building interior or walls .3. Repair Drainage and Stormwater System• Inspect gutters, downspouts, and storm drainage.• Repair, replace, or reinstall components to ensure the system is:• Watertight• Properly sized• Installed and discharged in an approved manner4. Structural Stabilization• Remove loose, hazardous, or deteriorated materials.• Repair unsafe or failing floors, walls, stairs, ceilings, structural supports, chimneys, balconies, andother attached features.• All structural elements must be sound, anchored, and capable of bearing required loads .5. Foundation and Exterior Wall Repairs• Inspect and repair foundations to ensure they are:o Plumbo Free of cracks, breaks, and open penetrationso Rat-proofed• Repair exterior walls to eliminate holes, breaks, and rotted sections. Treat exposed surfaces withappropriate weather-coating (e.g., paint or sealant).Office: 513.632.3756 | Email: lherrmann@cincinnatiport.org221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 46. Decorative and Attached Feature Repairs• Stabilize and repair architectural components such as:o Corniceso Belt courseso Corbelso Wall trims• Repair exterior fixtures and projections such as:o Fire escapeso Awningso Stairwayso Porcheso Signso Exhaust ducts• All exposed metal or wood surfaces must be anchored, weather-treated, and protected from decayor rust.7. Site & Accessory Structure Cleanup• Remove weeds, junk vehicles, debris, trash, and fire hazards from the premises.• Ensure steps, yardwalks, and sidewalk areas are safe for pedestrian travel.• Stabilize or remove unsafe garages, sheds, fences, and similar structures.8. Sanitation & Hazard Removal• Remove garbage, interior debris, and hazardous materials that may impact public health or safety.• Maintain interior surfaces free of loose plaster, falling finishes, and trip hazards9. The contractor is to clean the property and have all floors broom swept.Section 6 Proposal requirementsI. All proposals shall be organized in the following manner:a. Contact Information.i. Name, address, phone number of the firm as well as name, phone number and emailaddress of the firm's representative.b. Description of Proposed Services and Specifications.i. Information on any variations or additions to scope is recommended.c. Proposed Scheduled Finish Date.i. If specific dates cannot be provided the approximate number of weeks required tocomplete the project once started is permissible.Office: 513.632.3756 | Email: lherrmann@cincinnatiport.org221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 4Section 7 Contractor Requirements• Contractor must be registered with the City of Cincinnati before performing work or requestingpermits .• All work must comply with:o Cincinnati Building Codeo VBML Standards §1101-79.4Section 8 Project AdministrationI. Contractors are required to sign a Master Service Agreement with The Port to govern therelationship with Notice to Proceeds issued for each renovation.II. Insurance Requirements - Contractor agrees to obtain, at its own expense, to have in forcebefore commencing any work, and to maintain at all times while work is being performed underthis Agreement, the following insurance:a. Workers' Compensation Insurance in accordance with the requirements of theapplicablelaws of the State of Ohio; Stop-Gap Employer's Liability insurance with limits of not lessthan $500,000; Bodily injury coverage of $500,000 for each employee and $500,000 inthe aggregate (this may be provided as part of the Commercial General Liability policy).b. Commercial General Liability Insurance, including contractual liability, bodily injury andproperty damage combined at a minimum of $1,000,000 for each occurrence; personaland advertising injury coverage of $1,000,000 for any one person or organization and$1,000,000 in the aggregate. The policy should be endorsed to include:i. Hamilton County Land Reutilization Corporation, the Port of Greater Cincinnatiii. Development Authority (Management Company for the HCLRC) and any otherpersons or entities required by contract are to be additional insureds under ISOiii. Additional Insured Endorsement CG 2010 11 85 or equivalent (attached hereto).iv. Additional insured status must include ongoing operations as well as completedoperations and work.v. Additional Insured status must be on a primary and non-contributory basis.Endorsement CG 2001 or equivalent (attached hereto).vi. The commercial general liability insurance should also include a waiver ofsubrogation in favor of the Hamilton County Land Reutilization Corporation,Port of Greater Cincinnati Development Authority, and any other persons orentities required by contract to be additional insureds (suggested wordingattached hereto). The commercial general liability should include a minimum30-day notice of cancellation provision to the Hamilton County LandReutilization Corporation.c) Automobile Insurance for owned, non-owned, and hired vehicles for a combined singlelimit of not less than $1,000,000 for each occurrence. The policy should be endorsed toinclude the Hamilton County Land Reutilization Corporation, Port of Greater CincinnatiDevelopment Authority, and any other persons or entities required by contract to beadditional insureds on a primary and non-contributory basis.d) Umbrella/Excess Liability Insurance, with coverage for Commercial General Liability andAutomobile Liability with minimum limits of $3,000,000 for each occurrence andOffice: 513.632.3756 | Email: lherrmann@cincinnatiport.org221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 4$3,000,000 aggregate. The policy should be endorsed to include:i. Hamilton County Land Reutilization Corporation, Port of Greater CincinnatiDevelopment Authority, and any other persons or entities required bycontract are to be additional insureds.ii. Additional insured status must include ongoing operations as well ascompleted operations and work.iii. Additional Insured status must be on a primary and non-contributory basis.iv. The umbrella/excess liability should also include a waiver of subrogation infavor of the Hamilton County Land Reutilization Corporation, Port ofGreater Cincinnati Development Authority, and any other persons orentities required by contract to be additional insureds.III. Liability Waivera. Contractors and their sub-contractors are required to sign and date a "General LiabilityWaiver" to access and tour any CARE properties. Signed waivers can be scanned andemailed to the contact information in section 4 or delivered to the onsite Portrepresentative.b. Upon award of a project the general contractor is responsible for collecting signed"General Liability Waiver" from all visitors, laborers, tradespeople, and managers tostaff. Signed and dated "General Liability Waiver" can be submitted along with invoices.IV. Lien Waiversa. Signed and notarized lien waivers are required from contractors and all sub-contractorswhen submitting biweekly invoices.Office: 513.632.3756 | Email: lherrmann@cincinnatiport.org221 East Fourth Street, Suite 200Cincinnati, OH 452024 of 4
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
FRA - Olentangy Trail Scioto ...
Solicitation #: RFQ032961 Requesting Department: Recreation & Parks Document Title: FRA - Olentangy
City of Columbus
Bid Due: 7/07/2026
67-26 - Purchase of Asphalt R...
67-26 - Purchase of Asphalt Recycle Machine File Number: 67-26 Ordinance: 228-2026 Description:
City of Cleveland
Bid Due: 7/30/2026