RFQ: Mason Farm Wastewater Treatment Plant Bridge Rehabilitation
Project Information
- Bid Title
- RFQ: Mason Farm Wastewater Treatment Plant Bridge Rehabilitation
- Issuing Agency
- Carrboro OWASA (Water and Sewer Authority)
- Location
- North Carolina
- Published Date
- Dec 3, 2025
- Closing Date
- Dec 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Opportunity: RFQ: Mason Farm Wastewater Treatment Plant Bridge Rehabilitation Pre-Bid Meeting: Closing Date/Time: December 16, 2025, at 2 PM Contact: Steven Bailey Download: Award Information:
- Attachment Preview
-
REQUEST FOR QUALIFICATIONSOrange Water and Sewer AuthorityMason Farm WWTP Bridge RehabilitationIssue Date: November 21, 2025Submittal Deadline: December 16, 2025 at 2PM1. INTRODUCTIONYour firm is hereby invited to submit a written statement of qualifications to provideprofessional and engineering services related to the design and permitting of rehabilitationand scour remediation for the bridge located on the access drive to the Mason FarmWastewater Treatment Plant (WWTP) as indicated in Sections 2 through 4 below. OWASAwill conduct a Qualification-Based Selection process to identify the best qualified firm, orteam of firms, with which to negotiate a contract. All firms submitting qualifications musthave demonstrated experience and expertise in the design and permitting of bridge repairand remediation projects, including scour protection.To be considered, responses to this RFQ must be received by 2:00 p.m. EST on Tuesday,December 16, 2025. Refer to Section 5 – Submittal Requirements for details.2. OBJECTIVESThe objective of this project is to provide profession and engineering services to supportthe rehabilitation of the Mason Farm WWTP bridge. The project will address deficienciesthat have been noted in previous bridge inspection reports, including scour protection,patching of concrete cored slabs and wingwalls, and metal rail repairs.3. BACKGROUND AND DESCRIPTIONAccess to the Mason Farm WWTP is provided by a driveway through land owned by theState of North Carolina. The driveway crosses Morgan Creek by a single lane, cored slabbridge with two 30’ spans. The driveway and bridge are the only access into the WWTP.The bridge is maintained by OWASA and is located within an access easement granted toOWASA by the State. A recent inspection has noted that scour protection should be addedat one end bent and at the intermediate support. The report also noted rail and concreterepairs that could be made.4. SCOPE OF SERVICESThe engineering services required for this project are expected to be completed to meet theobjective outlined above and in general accordance with a scope of services as needed toaccomplish the tasks listed below. However, the final scope of services will be negotiatedwith the selected engineering firm and may include modified and/or additional tasks.1. Engineering services may include the following tasks:a. Develop construction drawings for rehabilitation and repairs to the MastonFarm WWTP bridge.b. Prepare and submit permits for the project as need from Federal, State, andLocal agencies and authorities.c. Assist OWASA with bidding the construction work and make arecommendation of award.d. Provide construction phase services to monitor the contractors work and toinsure compliance with the design and permits.5. SUBMITTAL REQUIREMENTSResponses to this RFQ must be received by OWASA no later than 2:00 p.m. EST onTuesday, December 16, 2025. To be considered, please email a PDF format of therequired qualifications listed below to:Steven Bailey, P.E.sbailey@owasa.orgEngineering Manager – Capital ProjectsOrange Water and Sewer Authority400 Jones Ferry RoadCarrboro, North Carolina 27510PDF submittals shall be letter-size format and limited to a maximum of 6 pages. Thetotal page count excludes the cover, cover letter, title sheets, dividers, and resumes.Statement of Qualifications will be assessed on the following:a) Project Team: list the proposed project team members, including sub-consultants(if any), identifying their respective roles on the project. Each proposal shallidentify the primary contact and include resumes or relevant experience summariesof key team members. The firm must have relevant experience with bridge repairsand scour protection.b) Team Experience: provide examples of previous, similar projects that the projectteams have completed or have in progress.c) Project Approach: describe your proposed approach to accomplish the workoutlined in the Scope of Services above.d) Project Schedule: provide schedule information, assuming Notice to Proceed isissued on February 6, 2026.6. SELECTION PROCESSAll questions regarding this Request for Qualifications must be emailed to Steven Baileyat sbailey@owasa.org on or before December 10, 2025. Questions submitted after thisdate will not be considered.OWASA intends to select a firm on a qualifications basis within three weeks of receivingthe responses to this RFQ.OWASA reserves the right to reject any and all proposals, to waive any and all formalities,and to disregard all nonconforming or conditional submittals.If OWASA cannot reach an agreement with the initially selected firm, OWASA will thenproceed to negotiate with other firms that submitted qualifications or will reissue the RFQ.7. OWASA POINT OF CONTACTSteven Bailey will be OWASA’s primary point of contact for all consultant selectionmatters relating to this project.8. SUPPLEMENTAL INFORMATIONAttachment 1 - Procurement Forms (procurement forms will be required from the selectedconsultant, the procurement forms are not required to be provided with theStatement of Qualifications)Attachment 2 - OWASA Standard Design Services AgreementAttachment 1: Procurement FormsE-VERIFY AFFIDAVITI,(the individual attesting below), being duly authorized byand on behalf of(the entity identified as the "Employer") after firstbeing duly sworn hereby swears or affirms as follows:1. Employee Count: Employer employs [Check one]☐ 25 of more employees in the State of North Carolina☐ Fewer than 25 employees in the State of North Carolina2. Employer understands that E-Verify is the federal E-Verify program operated by theUnited States Department of Homeland Security and other federal agencies, or any successor orequivalent program used to verify the work authorization of newly hired employees pursuant tofederal law in accordance with Article 2 of Chapter 64 of the North Carolina General Statutes.3. Employer understands that Employers Must Use E-Verify. Each employer, after hiring anemployee to work in the United States, shall verify the work authorization of the employeethrough E-Verify in accordance with Article 2 of Chapter 64 of the North Carolina GeneralStatutes.4. Employer will ensure compliance with E-Verify by any subcontractors subsequently hired byEmployer for specified contracts subject to E-Verify entered into with the Orange Water andSewer Authority.Thisday of,.Signature of AffiantState ofCounty ofSigned and sworn to (or affirmed) before me, thisthe_____ day of___________________,_________._________________________________________Official Signature of Notary___________________________, Notary PublicNotary’s printed or typed NameMy Commission Expires:END OF FORMAttachment 1: Procurement FormsIRAN DIVESTMENT ACT CERTIFICATION REQUIRED BY N.C.G.S.143C-6A-5(a)N.C.G.S. 143C-6A-5(a) requires this certification for bids or contracts with the State ofNorth Carolina, a North Carolina local government, or any other political subdivision of theState of North Carolina.N.C.G.S. 143C-6A-5(b) requires that contractors with the State, a North Carolina localgovernment, or any other political subdivision of the State of North Carolina must not utilizeany subcontractor found on the State Treasurer’s Final Divestment List.As of the date listed below, the vendor or bidder listed above is not listed on the FinalDivestment List created by the State Treasurer pursuant to N.C.G.S. 143-6A-4.The undersigned hereby certifies that he or she is authorized by the vendor or bidderlisted above to make the foregoing statement.SignatureDatePrinted NameTitleNotes to persons signing this form:The State Treasurer’s Final Divestment List can be found on the State Treasurer’s website at:https://www.nctreasurer.com/about/transparency/commitment-transparency/divestment-and-do-not-contract-rulesand will be updated every 180 days.END OF FORM
- Commodity Codes
-
- NAICS 221320Sewage Treatment Facilities
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
North Carolina Department of ...
Solicitation Number: SCO-24-28704-01 Project Title: North Carolina Department of Adult Correction Description: Eastern
State Government of North Carolina
Bid Due: 7/09/2026
Solicitation Number: 1012-27-001 Project Title: Federal Lobbying Services Description: Federal Lobbying Services Opening
State Government of North Carolina
Bid Due: 7/22/2026