Natural Gas Main Extension
Project Information
- Bid Title
- Natural Gas Main Extension
- Issuing Agency
- City of Cartersville
- Location
- Georgia
- Published Date
- Mar 12, 2026
- Closing Date
- Apr 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- CP-04-002-V/CP-04-002-VI
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: CP-04-002-V/CP-04-002-VI
Bid Title: Natural Gas Main Extension
Category: Bids & RFPs Status: Open Description: NATURAL GAS MAIN EXTENSION
TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDI
NORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROAD
DEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75
CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VI
Publication Date/Time: 3/12/2026 12:00 AM Closing Date/Time: 4/9/2026 2:00 PM Related Documents: - Attachment Preview
-
Natural Gas Main ExtensionToyo Tire North America/Zion Road Development Area Phase V: IDINorthwest 75 to Pettit Creek/Toyo Tire North America/Zion RoadDevelopment Area Phase VI: Beauflor USA to IDI Northwest 75Cartersville Project No. CP-04-002-V/CP-04-002-VIPrepared: March 2, 2026ADVERTISEMENT FOR BIDNATURAL GAS MAIN EXTENSIONTOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDINORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROADDEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VISealed proposals will be received by the City of Cartersville Gas System in the GasSystem offices located at 155 Old Mill Road, Cartersville, Georgia 30120 until:THURSDAY, APRIL 9, 2026 AT 2:00 PM, LOCAL TIMEfor the furnishing of all materials, labor, tools, skill, equipment and incidentals unless notedotherwise for the construction of the project entitled:NATURAL GAS MAIN EXTENSIONTOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDINORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROADDEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VIat which time and place the proposal will be publicly opened and read aloud.Proposals received after the designated time will not be considered.The principal items of construction are:4,400 L.F. – 8-5/8” O.D.-.219” W.T., F.B.E. Coated, ERW X42/X52 Steel Line Pipe1,760 L.F. – 8-5/8” O.D.-.322” W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe415 L.F. – 6-5/8” O.D.-.280” W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe570 L.F. – 8" Directional Bore (Sta. 41+30 to Sta. 35+60)360 L.F. – 8” Directional Bore (Sta. 41+60 to Sta. 45+20)370 L.F. – 8” Directional Bore (Sta. 1+90 to Sta. 5+60)355 L.F. – 6” Directional Bore (Sta. 46+00 to Sta. 49+55)Bidders shall be aware that a portion of the materials for the construction of this project willbe furnished by the City of Cartersville as called for in the specifications.All anticipated federal, state, or local permits and anticipated rights of way and easementsrequired for the project have been obtained.Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed RegulatoryCompliance Service (SRCS) and be a member in good standing with up-to-date Operator\\File\Gas\Users\Engineering\Projects\Cp-04-002-V\Specifications\Cp-04-002-V-Vi-Afb.DocNatural Gas Main ExtensionToyo Tire North America/Zion Road Development Area Phase V: IDINorthwest 75 to Pettit Creek/Toyo Tire North America/Zion RoadDevelopment Area Phase VI: Beauflor USA to IDI Northwest 75Cartersville Project No. CP-04-002-V/CP-04-002-VIPrepared: March 2, 2026Qualification records in accordance with the requirements of the Pipeline SafetyRegulations, Code of Federal Regulations, Title 49, Latest Edition, Part 192 and Part 199.All covered tasks associated with the construction of this project shall be performed inaccordance with the Operator Qualification Program subscribed to by the Bidder inaccordance with the requirements of the Pipeline Safety Regulations, Code of FederalRegulations, Title 49, Latest Edition, Part 192 and Part 199.Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed RegulatoryCompliance Service (SRCS) and be a member in good standing with up-to-date alcoholmisuse plan records meeting the requirements of the Pipeline Safety Regulations, Code ofFederal Regulations, Title 49, Latest Edition, Part 199 Drug and alcohol testing.Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed RegulatoryCompliance Service (SRCS) and be a member in good standing with up-to-date anti-drugplan records meeting the requirements of the Pipeline Safety Regulations, Code of FederalRegulations, Title 49, Latest Edition, Part 199 Drug and alcohol testing.Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed RegulatoryCompliance Service (SRCS) and be a member in good standing with up-to-date welderqualification records meeting the requirements of the Pipeline Safety Regulations, Code ofFederal Regulations, Title 49, Latest Edition, Part 192 and API Standard 1104 Welding ofPipelines and Related Facilities, Latest Edition incorporated by reference in the Code ofFederal Regulations.Bidders shall inform themselves of and comply with all conditions and specificationscontained in the bid package, contract, related documents and State and Federal Law.The successful bidder must comply with O.C.G.A. §36-84-1.The successful bidder must also comply with O.C.G.A. §50-36-1 et. Seq. and O.C.G.A.§13-10-91 et. Seq. and DOL Rule 300-10-1-.02. Proposals received without a properlyprepared and notarized affidavit specific to this project attesting to the requirements of theLaws and provided in the Contract Documents will not be considered.Bidders shall inform themselves concerning Georgia Laws and comply with the same.Bidders shall hold a current utility contractor license issued by the State of GeorgiaConstruction Industry Licensing Board and shall have in their employment on a full-timebasis a person who holds a valid utility manager certificate issued by the Division of UtilityContractors.Plans, specifications and contract documents are open to public inspection at the City ofCartersville Gas System offices located at 155 Old Mill Road, Cartersville, Georgia 30120.The Gas System offices may be contacted by telephone at 770.387.5642 or by mail atP.O. Box 1390, Cartersville, Georgia 30120.\\File\Gas\Users\Engineering\Projects\Cp-04-002-V\Specifications\Cp-04-002-V-Vi-Afb.DocNatural Gas Main ExtensionToyo Tire North America/Zion Road Development Area Phase V: IDINorthwest 75 to Pettit Creek/Toyo Tire North America/Zion RoadDevelopment Area Phase VI: Beauflor USA to IDI Northwest 75Cartersville Project No. CP-04-002-V/CP-04-002-VIPrepared: March 2, 2026Plans, specifications and contract documents may be obtained from the City of CartersvilleGas System upon deposit of $100.00 per set. No refund will be made. Potential biddersmay download a copy of the official plans, specifications and contract documentselectronically in Acrobat PDF format at no charge by visiting the City of Cartersville officialwebsite.One Contract shall be awarded covering all work and the maximum time for completionshall not exceed 90 consecutive calendar days from the starting date specified in theNotice to Proceed. Bidders must agree to pay as liquidated damages the sum of $200.00per each consecutive calendar day thereafter. Due consideration will be given to deliveryof materials in specifying starting date.The successful bidder will be furnished, free of charge, three sets of plans andspecifications.Bids must be accompanied by a Certified Check or Bid Bond in an amount equal to notless than five percent (5%) of the bid to be considered.No bid may be withdrawn after the scheduled closing time for receiving bids for a period ofsixty (60) days.The Owner reserves the right to accept or reject in whole or in part any or all bids and towaive formalities and re-advertise.CITY OF CARTERSVILLE, GEORGIABYMichael Dickson, Gas System Director\\File\Gas\Users\Engineering\Projects\Cp-04-002-V\Specifications\Cp-04-002-V-Vi-Afb.Doc
- Commodity Codes
-
- NAICS 221210Natural Gas Distribution
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Lawn Maintenance for Scott Ca...
Project ID: 2026-019-ITB Title: Lawn Maintenance for Scott Candler Water Treatment Plant (Three
DeKalb County
Bid Due: 7/08/2026
Lawn Maintenance for Scott Ca...
Project ID: 2026-019-ITB Title: Lawn Maintenance for Scott Candler Water Treatment Plant (Three
DeKalb County
Bid Due: 7/15/2026