Stokes-Thomas Lake City Park Drainage Project No. 2528
Project Information
- Bid Title
- Stokes-Thomas Lake City Park Drainage Project No. 2528
- Issuing Agency
- City of Watertown
- Location
- South Dakota
- Published Date
- Dec 7, 2025
- Closing Date
- Dec 17, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2025-0022
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 2025-0022
Bid Title: Stokes-Thomas Lake City Park Drainage Project No. 2528
Category: City of Watertown Bid Postings Status: Open Description: ADVERTISEMENT FOR BIDS
CITY OF WATERTOWN
WATERTOWN, SD
STOKES-THOMAS LAKE CITY PARK DRAINAGE PROJECT NO. 2528General Notice
City of Watertown (Owner) is requesting Bids for the construction of the following Project:
STOKES-THOMAS LAKE CITY PARK DRAINAGE PROJECT NO. 2528
Bids for the construction of the Project will be received at the City Finance Office located City Hall until Wednesday,December 17, 2025 at 3:00 p.m. local time. At that time the Bids received will be publicly opened and read.
The Project includes the following Work:
Approximately 1,562 FT of 6” perforated drain tile pipe, 54 FT of 6” SDR26 PVC pipe, 1,562 FT of pea rock pipe bedding material, 1,450 SY of geotextile fabric, (11) 9x9” drains with 4x4’ concrete collars, (1) modified 2x3’ Type B drop inlet with (1) Type E frame and grate, 348 CY of unclassified excavation, 2,420 SY of salvaged topsoil placement, 38 SY of asphalt pavement removal, 180 SF of concrete sidewalk removal, 30 Tons of base course, 38 SY of asphalt pavement patching, 180 SF of 4” concrete sidewalk installation, trench dewatering as needed, 50 FT of silt fence and 2,420 SY hydromulch seeding.
Bids are requested for the following Contract: STOKES-THOMAS LAKE CITY PARK DRAINAGE PROJECT NO 2528
The Project has an expected completion date of May 22nd, 2026.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
The Issuing Office for the Bidding Documents is:
CITY OF WATERTOWN: ENGINEER’S OFFICE
20 N Maple Street
PO Box 910
Watertown, SD 57201-0910Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8am to 5pm, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
This Advertisement is issued by:
Owner: City of Watertown
By: Luke Ammann
Title: Civil Engineer IIDated at Watertown, South Dakota this 25th day of November, 2025.
Publication Date/Time: 12/6/2025 12:00 AM Publication Information: Watertown Public Opinion Closing Date/Time: 12/17/2025 3:00 PM Submittal Information: Sealed Bids Bid Opening Information: City Hall, 20 N Maple Contact Person: Owner: City of Watertown
By: Luke Ammann
Title: Civil Engineer II
Business Hours: M-F 8:00 - 5:00 PM Related Documents: - Attachment Preview
-
PROJECT AREA01Equivalent ProductsWhenever in the Drawings any material is indicated or specified by name of manufacturer, such Specifications shallbe deemed to be used for the purpose of facilitating description of the material desired and shall be deemed to befollowed by the words “or Engineer approved equal”, and the Contractor may offer any material which shall beequal in every respect to that so indicated or specified; provided, however, that if the material or article offered bythe Contractor is not, in the opinion of the Engineer, equal in every respect, then the Contractor must furnish thematerial or article specified or one that, in the opinion of the Engineer, is equal thereof in every respect. The basisof payment for Salvage, Stockpile and Place Granular Base Material shall be plans quantity. No separatemeasurement shall be made. Water for placing salvaged granular base material shall be considered incidental to theinstallation of Salvage, Stockpile and Place Granular Base Material; no separate payment will be made.Substantial CompletionSubstantial completion will consist of all bid items. If the Contractor fails to substantially complete the project,liquidated damages shall be assessed to the Contractor as set forth in paragraph SC15.11.Working Day CountThe Contractor shall complete all substantial work by May 22, 2026 with final completion by June 22, 2026. Inaddition, the Contractor will have 38 consecutive working days to substantially complete this project. If theContractor fails to substantially complete the project within the allotted working days, liquidated damages shall beassessed to the Contractor as set forth in paragraph SC15.11. The Contractor is required to submit a starting date atleast 48 hours prior to work beginning. The working day count will start on the date submitted by the Contractorand working days will consist of Monday through Friday. The City will not count weekends or holidays unlesswork is being performed. Work consists of any Contractor or Subcontractor on site performing any duties, exceptadjusting traffic control.Weather DaysInitially, the Contractor and Engineer should get together and discuss whether the conditions warrant working ornot working. If the Contractor and Engineer both agree that the conditions are such that working is not possible,then the day or partial day is a non-working day due to weather. The City anticipates 2 weather days per month. Ifthe Contractor believes that work cannot be performed in the weather conditions due to low efficiency or otherreasons and the Engineer believes the Contractor could work without major hindrance, then the decision will bebased upon the weather data for that site for the day in question. If the precipitation over the full day of work inquestion before the time of shutting down is greater than or equal to 0.3 inches of precipitation (rain or snowequivalent), then it is an adverse weather day. If the precipitation value is less than 0.3 inches of precipitation (rainor snow equivalent), then it is a working day. If it rained greater than 0.75 inches the previous day, then it is anadverse weather day for grading projects only.Construction StakingThe Contractor is responsible for elevations, drainage, and meeting ADA requirements unless the area isdetermined problematic by the Engineer, in which case the Engineer will provide all necessary staking.SPECIAL PROVISIONSScope of WorkThese plans consist of the Stokes-Thomas Lake City Park Drainage project in Watertown, SD. The work includesbut is not limited to the installation of underground drain tile pipe, drainage rock, geotextile fabric, surface drains,and an outlet structure. The project also requires concrete and asphalt removals and installations, topsoil placement,seeding and erosion controls.General ConditionsThese Special Provisions shall amend, supplement, delete from, add to, and/or otherwise modify the General andSupplementary Conditions, the General Requirements, and/or the various Specifications for the above referencedProject. Any discrepancies between the Special Provisions and any other Contract Documents (excluding theDrawings) shall be resolved in favor of the Special Provisions. Any discrepancies between the Special Provisionsand the Drawings shall be reported to the Engineer and resolved as indicated in GC3.03 or as otherwise determinedby the Engineer.Grading OperationsGrading construction work will be restricted to daylight hours. The estimated quantity of Unclassified Excavation isfor excavating and removing the existing material to the specified section and shall be considered waste materialexcept for any soil the Engineer deems usable as topsoil. The Engineer reserves the right to change the materialthickness, including but not limited to any excavation, base course, or any other surfacing, for any reason, includingavoiding quantity overruns.Surfacing ThicknessThe thickness of pavement shall be constructed to match the observed existing thickness of adjacent pavementsunless otherwise detailed on the Plans or directed by the Engineer. The Engineer reserves the right to change thematerial thickness for any reason, including avoiding overruns.Measurement and PaymentAll standard bid items will be measured according to the special provisions and made payment in accordance to theGeneral Conditions Section 15.021.000 - MobilizationMobilization consists of preparatory work and operations, including, but not limited to the necessary movement ofpersonnel, equipment, and incidentals to the project site; for the establishment of offices, buildings, and otherfacilities necessary for work on the project; for work and operations which must be performed, and for cost incurredbefore starting work on the various contract items on the project site. When an item for mobilization is included inthe bid proposal, the City payment at the contract lump sum price will be considered full compensation formobilization costs. The City will make partial payments throughout the project in increments of 25% in conjunctionwith project completion percentage. All traffic control items required to complete the project will be included in themobilization unit price, unless a separate bid item is included.4.020 - Remove Concrete SidewalkRemove concrete sidewalk will be measured to the nearest foot and area computed to the nearest square foot andpaid at the contract price per square foot. Sidewalk will be removed to an existing joint line or saw cut if approvedby the Engineer to create a true line with a vertical face. The unit price for removal of concrete sidewalk shallinclude the costs of furnishing labor, equipment and removal and disposal of material in accordance withspecifications. Saw cutting will be considered incidental unless a separate bid item is included. The Engineer mayrequire additional saw cutting for tie-ins at no additional price.4.155 - 4" Concrete Sidewalk (Standard Plates 651.W1, 651.W2, 651.W3)4" concrete sidewalk will be measured to the nearest foot and the area calculated to the nearest square foot.Payment will be made at the contract unit price per square foot. All costs for prepping adjacent vertical faces andexcavation for grading will be considered incidental. All costs for curing of concrete will be incidental to thecontract unit price. The unit price for 4" concrete sidewalk shall include the costs of furnishing labor, equipment,removal and disposal of material and pouring 4" concrete sidewalk in accordance with specifications.5.101 - 6" Perforated Drain Tile Pipe (Standard Plate 450.W1)6" perforated drain tile pipe will be measured to the nearest linear foot. Payment will be made at the contract unitprice per linear foot for the types and sizes furnished and accepted.6" SDR26 PVC Pipe6" SDR26 PVC pipe will be measured to the nearest linear foot. Payment will be made at the contract unit price perlinear foot for the types and sizes furnished and accepted.5.185 - Storm Sewer Pipe Bedding Material (Pea Rock)Storm sewer pipe bedding material will be measured to the nearest linear foot. Payment will be made at the contractunit price per linear foot.5.708 - Trench DewateringTrench dewatering will be paid as a lump sum item. Payment will include all cost associated with dewatering forpipe and bedding material installation.Modified Type B Drop Inlet 2' x 3' (Standard Plates 670.01 & 670.75)Modified Type B drop inlet will be measured and paid on a per each basis at the contract unit price. All costs forfurnishing, modifying and installing the drop inlet will be included in the contract unit price.Type E Frame and GrateType E frame and grate will be measured and paid on a per each basis at the contract unit price. All costs forfurnishing and installing the frame and grate combination will be included in the contract unit price.9" x 9" Inline Drain with 4' x 4' Concrete Collar9" x 9" inline drain with 4' x 4' concrete collar will be measured and paid on a per each basis at the contract unitprice. All costs for furnishing and installing the drain and collar combination will be included in the contract unitprice.6.005 - Remove Asphalt PavementRemove asphalt pavement will be measured to the nearest square yard and paid at the contract unit price per squareyard. Saw cutting will be considered incidental unless a separate bid item is included. The Engineer may requireadditional saw cutting for tie-ins at no additional price.6.040 - Asphalt Concrete for PatchingAsphalt concrete for patching will be measured to the nearest square yard and paid at the contract unit price persquare yard. The mixture of mineral aggregate and asphalt binder will be weighed after mixing. Asphalt for tackwill be incidental to the unit price for asphalt for patching. Saw cutting to create a straight, smooth and verticalsurface will be considered incidental. The unit price for asphalt concrete for patching shall include the cost offurnishing labor, equipment, material and laying asphalt concrete mat in accordance with specifications. Asphaltconcrete for patching will be used for any contiguous project location less than 600 square yards, inclusive.9.000 - Unclassified ExcavationUnclassified excavation will be measured to the nearest cubic yard and paid at the contract unit price per cubicyard. All excavation will be considered unclassified except when a separate bid item for digouts is included,regardless of the nature of the material or manner in which the material is removed. Suitable material temporarilyremoved and replaced will not be measured as waste.9.070 - Woven Geotextile FabricWoven geotextile fabric for subgrade stabilization will be measured to the nearest square yard and paid at thecontract unit price per square yard. The overlapped material will not be paid additional for and will be consideredincidental to the unit price.9.155 - Aggregate Base CourseAggregate base course will be measured to the nearest 0.1 ton. Payment will be made at the contract unit price perton based on weigh tickets provided by the Contractor. All costs associated with furnishing and installing materialwill be included in the unit price. Certified weigh tickets will be required before payment is made. Water foraggregate base course shall be considered incidental to the unit price. No separate payment will be made. All costsassociated with scarifying and compacting the subgrade before placement of the aggregate base course will beconsidered incidental to the various bid items.10.005 - Silt Fence (Standard Plate 734.05)Silt fence will be measured to the nearest linear foot and paid at the contract unit price per linear foot. All costsassociated with installing, maintaining and removing silt fence will be included in the contract unit price.Contractor's failure to maintain, relocate or remove erosion control devices as required will result in a priceadjustment assessed to the contract at $100 per day. Removing silt fence will be completed once permanentvegetation or appropriate surfacing is established.12.010 - Salvaged Topsoil PlacementSalvaged topsoil placement will be measured to the nearest square yard and paid at the contract unit price persquare yard.12.045 - Hydromulch SeedingHydromulch seeding will be measured to the nearest square yard and paid at the contract unit price per squareyard. All cost associated with furnishing and installing the grass seed, fertilizer, mulch and water will be includedin the unit price. Watering and weed control will be incidental to the unit price for hydromulch seeding. Bare spotsor locations of erosion shall be re-seeded and maintained by the Contractor in the areas that do not meet the 70 %vegetative cover density requirement of native cover for unpaved areas. The additional materials and labor shall beincidental to the unit price for hydromulch seeding.03DRAINTILE ALIGNMENT A (0+00 - 10+10.49)DRAINTILE ALIGNMENT B (0+00 - 5+03.40)
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
TEPEE WORK CENTER WELL PUMP P...
Follow TEPEE WORK CENTER WELL PUMP PROJECT Active Contract Opportunity Notice ID 1165685
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/15/2026
Pine Ridge Hospital Roof Repl...
Follow Pine Ridge Hospital Roof Replacement Active Contract Opportunity Notice ID 75H70126R00034 Related
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/15/2026