Town of Apex Jenks Substation Outdoor Power Transformer
Project Information
- Bid Title
- Town of Apex Jenks Substation Outdoor Power Transformer
- Issuing Agency
- Town of Apex
- Location
- North Carolina
- Published Date
- Oct 24, 2025
- Closing Date
- Dec 18, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Town of Apex Jenks Substation Outdoor Power Transformer
Category: Electric Utility Supplies Status: Open Description: Sealed proposals will be received until 2:00 pm on Thursday November 20th, 2025, and opened immediately thereafter and publicly read at Apex Public Works, Purchasing and Inventory building, 105-C Upchurch St., Apex, North Carolina 27502, in the purchasing office.
Sealed bids should be submitted to the Town of Apex, 105 Upchurch St., Apex, North Carolina 27502, Attn: Steve Maynard and marked “OUTDOOR POWER TRANSFORMER BID”. Do not open until 2:00 on November 20th, 2025.”
Publication Date/Time: 10/23/2025 8:30 AM Closing Date/Time: 12/18/2025 2:00 PM Addendum Date/Time: 10/24/2025 Contact Person: Brad Holland
brad.holland@apexnc.orgRelated Documents: - Attachment Preview
-
Town of ApexApex, North CarolinaJenks SubstationTechnical SpecificationsforOutdoor Power TransformerTown of ApexApex, North CarolinaJenks SubstationTechnical SpecificationsforOutdoor Power TransformerTable of ContentsTechnical Specifications1.0 Scope .............................................................................................................T-12.0 Drawings & Documentation .........................................................................T-13.0 Delivery .........................................................................................................T-44.0 Ratings ..........................................................................................................T-65.0 Main Tank .....................................................................................................T-66.0 Core and Coil ................................................................................................T-107.0 Oil and Oil Preservation Equipment .............................................................T-128.0 Not Used .......................................................................................................T-159.0 De-energized Tap Changer (DETC) .............................................................T-1510.0 Radiators and Auxiliary Cooling Equipment ................................................T-1611.0 Bushings ........................................................................................................T-1812.0 Surge Protection and Grounding ...................................................................T-1913.0 Current Transformers ....................................................................................T-2014.0 Control Cabinet .............................................................................................T-2115.0 Control Wiring and Terminal Blocks ...........................................................T-2316.0 Fittings and Accessories ...............................................................................T-2517.0 Transformer Monitoring Equipment .............................................................T-2618.0 Alarms, Annunciation, Measurements, Fan Control ....................................T-2919.0 Auxiliary Equipment Power .........................................................................T-3320.0 Sound Level ..................................................................................................T-3321.0 Paint ..............................................................................................................T-3322.0 Nameplates ....................................................................................................T-3423.0 Transformer Tests .........................................................................................T-3524.0 Certified Test Reports ...................................................................................T-4325.0 Transformer Loss Evaluation ........................................................................T-4426.0 Installation .....................................................................................................T-4527.0 Warranty .......................................................................................................T-48AppendicesAppendix A:Appendix B:Appendix C:Appendix D:Appendix E:Ratings ScheduleCurrent Transformer ScheduleGround Bus ArrangementTypical Transformer NameplateFan Control SchematicTown of ApexApex, North CarolinaTechnical SpecificationsForThree-Phase Outdoor Oil Filled Power Transformer1.0 Scope1.1 GeneralThis specification covers the design, construction, delivery, and assembly requirementsfor a two winding liquid immersed three-phase outdoor power transformer to beinstalled in a substation being constructed by the Town of Apex (Town, Owner,Purchaser). Specific rating information pertaining to this unit is provided in the ratingsschedule in Appendix A.1.2 StandardsThe transformer shall be designed, manufactured and tested in accordance with thelatest edition of applicable ANSI/IEEE ASTM, and NEMA standards. In the event ofconflict between standards, ANSI/IEEE shall take precedence over all other standards.1.3 Where reference is made in these specifications to “ANSI/IEEE C57”, compliance isrequired to the latest edition of all applicable standards contained within IEEEStandards Collection C57 Distribution, Power, and Regulating Transformers whichcontains numerous discrete standards bearing the prefix designation “ANSI C57” or“IEEE C57”, plus IEEE 62, IEEE 259, IEEE 1276 and IEEE 1388.1.4 All components of the transformer shall be new.2.0 Drawings & Documentation2.1 Proposal Documentation2.1.1 Outline drawing with a list of all major materials to be provided.2.1.2 Performance data and evidence of short circuit tests for similar designs.2.1.3 Manner in which unit is to be shipped.2.1.4 Final proposal price for manufacture, delivery, field assembly, field testing etc.,shall be listed as one single price on the bid schedule sheet in the contractdocuments. Separate prices for various services can be included in theT-1ECEPOWERsupporting documentation but the Owner will not be responsible for searchingthrough such documentation to determine the total price.2.1.5 It is the intent of these specifications to procure a transformer that is completeand fully functional (ready for energization) for the price stated in the proposal.Any services not specifically mentioned herein but required for a fullyfunctional unit shall be supplied.2.2 Submittal Information for Review & ApprovalPrior to commencing production of the transformer, the manufacturer shall submit tothe Purchaser’s Engineer drawings and information for review of conformance totechnical specifications.2.2.12.2.2These documents shall be submitted to the Purchaser’s Engineer within six (6)calendar weeks following receipt of order. All documents submitted shall beclearly identified as “PRELIMINARY” and “SUBMITTED FORAPPROVAL.”Documents shall also clearly identify the name of the end use customer, thename of the project, and the Purchaser’s Contract or Purchase Order ReferenceNumber. All drawings transmitted shall clearly identify the manufacturer’sShop Order Reference Number.2.2.3 The manufacturer shall submit the approval drawings and documentation to thePurchaser’s Engineer via e-mail in .pdf format. All drawings shall also besubmitted in .dwg format. Based upon comments by the Engineer,manufacturer shall make corrections if necessary, and resubmit within 30calendar days. The Engineer reserves the right to require the manufacturer toresubmit approval documentation for additional review after corrections.2.2.4 Approval of documentation by the Purchaser or Purchaser’s Engineer shall notrelieve the manufacturer of the responsibility for meeting all requirements ofthe specifications, for correctness of the drawings and the proper design of theequipment.2.2.5 Drawings and information thereon submitted for approval shall include thefollowing:2.2.5.1Transformer outline drawing showing overall dimensions and weightincluding all accessories and conduits. Drawings shall include centerof gravity, shipping dimensions, assembly dimensions, and weights.Drawings shall be scaled in concurrence with the noted dimensions.2.2.5.2 Bill of material itemizing quantity, manufacturer, model, catalog #,rating and operating characteristics of each component and accessory.T-2ECEPOWER
- Commodity Codes
-
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 334416Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
- NAICS 335311Power, Distribution, and Specialty Transformer Manufacturing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Gravel Supply Active Contract Opportunity Notice ID 1161145 Related Notice Department/Ind. Agency
Federal Agency
Bid Due: 7/07/2026
Vegetation Removal & Litter P...
D6BR.SBE.025 SBE Vegetation Removal & Litter Pickup - I-295 - Cumberland & Robeson
Division of Highways
Bid Due: 7/15/2026