RFQ: Addendum #1 Multiple Elementary School Additions and Renovations
Project Information
- Bid Title
- RFQ: Addendum #1 Multiple Elementary School Additions and Renovations
- Issuing Agency
- Gaston County Public Schools
- Location
- North Carolina
- Published Date
- Jan 6, 2026
- Closing Date
- Jan 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFQ: Addendum #1 Multiple Elementary School Additions and Renovations
- Attachment Preview
-
REQUEST FOR QUALIFICATIONSforCONSTRUCTION MANAGEMENT AT-RISK SERVICESRFQ# 20251215Multiple Elementary SchoolAdditions and RenovationsADDENDUM NO. 1January 2, 2026Question & Answer Log:1. Question: Will each school be awarded independently, or will both (Belmont CentralElementary School & New Hope Elementary School) be awarded as part of onecontract?Response: It is the intent of Gaston County Schools (GCS) to award both schools toone construction firm to provide Construction Management At-Risk Services.2. Question: Would we be able to receive more clarification on the overall designschedule? When would documents be available for the CMAR to start subcontractorbidding?Response: The design schedule is anticipated to last 9 to 10 months, beginning thisJanuary, and may include early bid periods as needed with input from the CM. Also,refer to the response to Question 10.3. Question: Is there an anticipated move-in date or semester that the district is targetingto open the new additions and/or renovations at each school? If not, is the districttargeting both schools be built concurrently or would one start and then another one startwhen the first one finishes?Response: It is the intent for both projects to be designed and for preconstructionservices to be provided at the same time. At this time, dates for substantial and finalcompletion have not been determined, and it has not yet been determined if bothschools will be under construction at the same time. GCS may be interested in learningmore about the advantages and disadvantages of constructing both at the same time vs.constructing one and then the other. GCS is also interested in input from the CM on theoverall construction schedule and phasing that will be most advantageous to the district.4. Question: Is there an approximate square footage that the district is targeting each ofthe additions?Response: At this time, there is no approximate square footage target for the additionsat either school. However, GCS is anticipating up to a 10-classroom addition at eachschool, plus other additions of assembly spaces at each school to accommodate theincrease in student enrollment.5. Question: Does the district have a standard contract that they use for CMARprojects? Will it be an AIA Contract or another form of contract?Response: GCS will enter into an agreement recommended by their legal counsel. TheContract will likely be a modified version of the AIA A133 - 2019 Standard Form ofAgreement Between Owner and Construction Manager as Constructor, along with theAIA A201 - 2017 General Conditions, and GCS Supplement Conditions.6. Question: Will you be selecting the same GC for both? Or 2 separate GC’s (1 for eachproject)?Response: See response to Question 1.7. Question: What is schedule/intended construction timeline for each project? Will bothbe under construction concurrently? Or one after the other?Response: See response to Question 3.8. Question: Max pages less than 40 double-sided (80 pages of content)- does thatinclude dividers, cover, cover letter, and forms that are required?Response: The maximum page count does not include dividers, front or back covers,cover letter, table of contents, or any of the required forms.9. Question: Sample work product- are you looking for an example from a previous projector is this intended to be a sample for your proposed projects?Response: The sample work products requested should be from your previous K-12projects. GCS and our design team will be most interested to see cost estimates andconstruction schedule examples from previous addition/renovation or on-sitereplacement projects.10. Question: When do you anticipate construction to start on both of these? June/July ’26?Response: GCS and the design team will want CM input on this; however, beginningconstruction with early site and enabling packages by mid-summer 2026 may be anoption the district would like to explore.11. Question: Section 3 Submission Requirements/Instructions, Part 2 “Experience of Firmand References”, item e. says to “Provide a brief photographic and written overview ofsimilar work in Education Design.” Can you provide more information as to theinformation desired here? With the information provided in item c, we are to expand onsimilar work for no less than 3 similar projects. Is this a location to expand onopportunities that are not within the last 5 years? Please clarify.Response: The information requested in Section 3, item e. can be thought of asshowcasing the remainder of your relevant portfolio in education design, focusing on K-12, projects most relevant to this RFQ, and can certainly include projects older thanthose completed within the last 5 years.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PRB.37212 - CONSTRUCTION OF D...
PRB.37212,51830.2.11.08,Helene POC PRB.37212 - CONSTRUCTION OF DESIGN BID BUILD BRIDGE REPLACEMENT ON PRIVATE
Division of Highways
Bid Due: 7/15/2026
Carmel and Mooreland Farms Ro...
Project: Carmel and Mooreland Farms Road Sidewalk Gap Ref. #: 269-2026-238 Department: City
City of Charlotte
Bid Due: 7/23/2026