Wastewater Reclamation Facility Primary Scum Flushing Loop
Project Information
- Bid Title
- Wastewater Reclamation Facility Primary Scum Flushing Loop
- Issuing Agency
- City of pueblo
- Location
- Colorado
- Published Date
- Jun 23, 2026
- Closing Date
- Jul 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-005 (WWAN04)
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 26-005 (WWAN04)
Title: Wastewater Reclamation Facility Primary Scum Flushing Loop
Addenda: 0
Release Date: 6/23/2026
Due Date: 7/15/2026
Wastewater Reclamation Facility Primary Scum Flushing LoopFollowPublic Improvement Invitation for BidWastewater67000 , 67057 , 91060 , 91359 , 91391 ... show allProject ID: 26-005 (WWAN04)Release Date: Tuesday, June 23, 2026· Due Date: Wednesday, July 15, 2026 11:00amPosted Tuesday, June 23, 2026 9:43amAll dates & times in Mountain TimeDraft Response Events RSVP No BidTime Remaining: 21 days, 15 hours, 35 minutesOverview
Post Information
Posted At:Tue, Jun 23, 2026 9:43 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe Wastewater Reclamation Facility (WRF) is soliciting for a qualified Contractor to provide a new valve and loop system for the Primary Scum Flushing Loop. The project shall generally include Contractor supplying new equipment, removal of existing pipe sections and couplers, and replacement with new pipe sections, couplers, and new valves, to manufacturer specifications to allow the sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing. The contractor shall complete all work as outlined in this Invitation for Bid (IFB).
BackgroundCurrently the flushing system utilizes a 6" scum line from the Primary Clarifier to the DAF tanks and without regular flushing the solids can get compacted, causing pumps to overload and shut off. The system only provides back flushing to the pumps with very little head pressure to scour or push the solids forward. The system has a valve between the Primary Clarifier, DAFT tanks, and Gravity Thickener so that if necessary, the sludge that is normally sent to the Gravity Thickener can be sent directly to the DAF tanks. This allows the Gravity Thickener to be shut down for annual maintenance/refurbishing.
A new valve and loop system will allow sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing to avoid solid buildups that stop the Scum Pumps. It is anticipated that the new valve and loop system will significantly reduce maintenance and down time.
Timeline
Advertisement/Release Project Date:June 23, 2026Pre-Bid Meeting (Mandatory):June 30, 2026, 10:00amWastewater Reclamation Facility (WRF) Administration Conference Room
1300 South Queens Avenue
Pueblo, Colorado 81001
• Site visit will follow initial meeting and project overview.
• Bidders MUST bring their own cameras, notepads, tape measures, recording devices, etc. and take their own notes. It is the Bidder’s responsibility to obtain all necessary information at the site visit. The City will not allow future change orders based on information that is available at the site visit.Question Submission Deadline:July 7, 2026, 4:00pmBid Opening:July 15, 2026, 11:00am - Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541620Environmental Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Project is in Region 3 in Gar...
Project Number Description Documents *STA 0131-073 (24354) Project is in Region 3 in
State Government of Colorado
Bid Due: 9/10/2026
Project is in Region 1 in Ada...
Project Number Description Documents *STA 095A-027 (27164) Project is in Region 1 in
State Government of Colorado
Bid Due: 8/27/2026