Water Plant Automation Request for Qualifications
Project Information
- Bid Title
- Water Plant Automation Request for Qualifications
- Issuing Agency
- City of Bethel
- Location
- Alaska
- Published Date
- Jul 9, 2026
- Closing Date
- Jul 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Water Plant Automation Request for Qualifications
Category: Request for Proposals and Bids Status: Open Description: The City of Bethel (City) is soliciting Requests for Qualifications (RFQ) from Construction Manager/ General Contractor (CM/GC) organizations (Proposers) for the construction of the following Project, and for related pre-construction and procurement CM/GC services:
Water Plant and Facility Controls and Automation (Project).
The Project will use the CM/GC project delivery method. The selected Proposer will serve in a CM/GC role acting as a partner to the City and their project team. The goals of the partnership are to create a collaborative City-CM/GC relationship, identify and mitigate risks, enhance constructability and cost estimating, and develop a project that meets budget goals.
This is a fast-track project that will require the CM/GC to provide design phase input for the following project elements and considerations:
• Constructability
• Pricing and material selection
• Design details that will affect means and methods
• Cost estimation
• Long-lead material procurements
This document sets forth information regarding the CM/GC selection process for the project. The intent is to select a CM/GC offering the best combination of attributes to assist with project construction.
Publication Date/Time: 6/21/2026 8:00 AM Closing Date/Time: 7/17/2026 4:00 PM Submittal Information: Purchasingagent@cityofbethel.net Addendum Date/Time: 6/25/2026 Pre-bid Meeting: 06/30/2026 Contact Person: cnelson@dowl.com or bmjos@dowl.com Related Documents: - Attachment Preview
-
General NoticeProject Title: Bethel Water Plant and Facility Controls and Automation CM/GC ServicesCategory: Request for QualificationsStatus: OpenDescription: The City of Bethel is issuing a request for Statements of Qualifications from ConstructionManager/ General Contractor (CM/GC) organizations for Controls and Automation Work at the waterplants, lift stations, and other City of Bethel facilities. The project is anticipated to include:▪ Replace Motor Control Centers (MCCs), all motor starters, power, and control circuits▪ Replace select motorized valves and actuators including power and signal circuits▪ Replace existing process and distribution control panels with new PLC-based panels▪ Replace or repair existing sub-process monitoring and control panels▪ Install new PLC panel with all required I/O, HMI screen, data logging, etc.▪ Replace damaged or non-functioning process and distribution instruments, sensors, switches, ortransmitters, etc. related to the existing and new water process/distribution and building system I/O▪ Replace chemical dosing feed pumps and configure automatic flow pacing or dose control▪ Replace wiring for low voltage communications between all instruments, valves, motors, etc. and thenew PLC-based control panel▪ Provide software and programming for new PLC control panels▪ Provide upgrade to the existing SCADA supervisory station▪ Install new SCADA panel▪ Connect BHWTP backwash pipe to new force main discharging to Main Lift Station▪ Identify obsolete equipment and recommend replacements▪ Implement cybersecurity enhancements and ensure compliance▪ Provide operator training▪ Develop complete SCADA and control panel shop drawings and wiring diagrams, updated process anddistribution narratives, as-built drawings of installations, instrument indexes, and O&M manuals▪ Integrate lift station controls to SCADA for remote monitoring of pump run times, level-based pumpoperation and alarms, pump alternation logic, and flow data▪ For selected remote sites and lift stations, provide radio connectivity hardware (e.g. RF ethernet radioantennas, POE switches) and integration of the SCADA Supervisory Station▪ Replace select chemical mixing tanks▪ On-call mechanical and electrical component installation at Engineer’s DirectionAnticipated Publication date: June 21, 2026Anticipated Closing date: July 14, 2026Related documents: https://www.cityofbethel.org/bids.aspxCITY OF BETHELBETHEL, ALASKARequests for QualificationsConstruction Manager/ General Contractor(adapted from EJCDC CMAR-200_2023 and CMAR-111_2023)Water Plant and Facility Controls and AutomationRFP issued:Mandatory Pre-Proposal Meeting (Virtual):Deadline for Questions:Statement of Qualifications Due Date & Time:June 21, 2026June 30, 2026 @ 1 pmJuly 7, 2026 @ 4:00 pmJuly 14, 2026 @ 4:00 pm at Bethel City HallTable of ContentsArticle 1. General Information...................................................................................................... 11.01General Notice .............................................................................................................. 11.02Submittals ..................................................................................................................... 11.03Obtaining the Proposal Documents .............................................................................. 21.04Informational Pre-Submittal Conference ...................................................................... 31.05Project Description........................................................................................................ 31.06Scope of Work ............................................................................................................... 31.07Proposal Documents ..................................................................................................... 41.08Examination of Proposal Documents............................................................................ 51.09Site Visit......................................................................................................................... 51.10Questions regarding the SOQ........................................................................................ 61.11Addenda ........................................................................................................................ 61.12Protests ......................................................................................................................... 61.13Confidentiality of Submitted Information..................................................................... 61.14Conflict of Interest ........................................................................................................ 61.15Inducement ................................................................................................................... 71.16Non-Collusion................................................................................................................ 71.17Debarment .................................................................................................................... 71.18Good Standing............................................................................................................... 71.19Non-Discrimination ....................................................................................................... 71.20Public Disclosure ........................................................................................................... 81.21Cost Liability .................................................................................................................. 81.22Wage Rate Requirements ............................................................................................. 81.23Minimum Qualifications................................................................................................ 8Article 2. Evaluation Criteria....................................................................................................... 102.01Evaluation Categories.................................................................................................. 102.02Interview ..................................................................................................................... 10Article 3. Requirements for the SOQ .......................................................................................... 103.01General Requirements ................................................................................................ 10Article 4. Instructions for Preparing the SOQ............................................................................. 11i4.01Provided SOQ: ............................................................................................................. 114.02Table 2 – Category B: Project Experience ................................................................... 124.03Table 3 – Category C: Experience and Qualifications of Proposed Key Personnel...... 12Article 5. Evaluation of Statements of Qualifications................................................................. 125.01One-Step Qualifications-Based Selection Process ...................................................... 125.02Evaluation of SOQs:..................................................................................................... 125.03Ranking of Proposers .................................................................................................. 135.04EJCDC Contract............................................................................................................ 145.05Contract Commencement........................................................................................... 14AttachmentsAttachment 1: SOQ template and formsAttachment 2: Sample EJCDC AgreementAttachment 3: Exhibit A - Scope of ServicesAttachment 4: Work Authorization TemplateAttachment 5: CMGC Standard General ConditionsAttachment 6: CMGC Supplemental ConditionsAttachment 7: CMGC Division 01 00 00 General RequirementsAttachment 8: CMGC Division 01 33 00 SubmittalsAttachment 9: CMGC Sample Bonds for Work AuthorizationAttachment 10: Supplemental InformationEDC WTP Automation StudyPotential Scope of Work ItemsDavis Bacon GuidanceAmerican Iron and Steel (AIS) GuidancePreliminary Piping and Instrumentation Drawings to be added by addendumPreliminary Electrical Location Plan to be added by addendumiiARTICLE 1. GENERAL INFORMATION1.01 General NoticeThe City of Bethel (City) is soliciting Requests for Qualifications (RFQ) from ConstructionManager/ General Contractor (CM/GC) organizations (Proposers) for the construction of thefollowing Project, and for related pre-construction and procurement CM/GC services:Water Plant and Facility Controls and Automation (Project)The Project will use the CM/GC project delivery method. The selected Proposer will serve in aCM/GC role acting as a partner to the City and their project team. The goals of the partnershipare to create a collaborative City-CM/GC relationship, identify and mitigate risks, enhanceconstructability and cost estimating, and develop a project that meets budget goals.This is a fast-track project that will require the CM/GC to provide design phase input for thefollowing project elements and considerations:• Constructability• Pricing and material selection• Design details that will affect means and methods• Cost estimation• Long-lead material procurementsThis document sets forth information regarding the CM/GC selection process for the project.The intent is to select a CM/GC offering the best combination of attributes to assist with projectconstruction.1.02 SubmittalsThe City will accept printed or electronic Statements of Qualifications (SOQ) demonstrating theProposer’s qualifications and ability to provide CM/GC services and construct the Project untilthe date and time shown on the front cover of this RFQ. After that time, the City will no longeraccept SOQs. Each Proposer must submit one (1) SOQ by email, U.S. Postal Service, or privatecarrier.SOQs may be submitted by email. SOQs submitted by email must be in Adobe PDF format andsent by email to the Purchasing Agent at purchasingagent@cityofbethel.net. The subject line ofthe email must read: “CM/GC Services for the Water Plant and Facility Controls and Automation.”The City is not responsible for incomplete transmissions or unsuccessful delivery by electronicmeans. The City will send an acknowledgment receipt of the SOQ. Submittals should be limitedto 25 mb per email.SOQs submitted in hard copy form must be in a sealed envelope marked: “SOQ for CM/GCServices for the Water Plant and Facility Controls and Automation” and then list Proposer’s name,address and phone number.Page 1
- Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 541330Engineering Services
- NAICS 541690Other Scientific and Technical Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Furnish Sodium Hypochlorite o...
+ 2026B060 - Furnish Sodium Hypochlorite on an As Needed basis Click here
City of Anchorage
Bid Due: 7/30/2026
RFP 2026-623 DESIGN SERVICES ...
RFP 2026-623 DESIGN SERVICES BAXTER ELEMENTARY SCHOOL CEILING SYSTEM UPGRADES DUE: Prior to
Anchorage School District
Bid Due: 8/04/2026