Opens June 9 ? Outer Belt West Water Main Avenue of Mid-America to Keller Drive Project ? Specifications
Project Information
- Bid Title
- Opens June 9 ? Outer Belt West Water Main Avenue of Mid-America to Keller Drive Project ? Specifications
- Issuing Agency
- Effingham city
- Location
- Illinois
- Published Date
- May 26, 2026
- Closing Date
- Jun 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
PROJECT MANUALFOROUTER BELT WEST WATER MAINAVENUE OF MID-AMERICA TO KELLER DRIVECDI PROJECT #7613.01MAY 2026PREPARED FOR:CITY OF EFFINGHAMEFFINGHAM, ILCITY ENGINEER: LUKE THOELE, P.E.PREPARED BY:CIVIL DESIGN, INC.307 E WASHINGTONEFFINGHAM, ILLINOIS 62401WES KISTLER, P.E.PHONE: 217-342-2025DIRECT: 217-340-0350EMAIL: WKISTLER@CIVILDESIGNINC.COM1Signed: 05/19/26Expires: 11/30/27TABLE OF CONTENTSITEM:NOTICE TO CONTRACTORSSPECIAL PROVISIONSPROPOSALBID BONDNOTICE OF AWARDCONTRACTCONTRACT BONDNOTICE TO PROCEEDPAGE#34 - 1416 – 1819 – 202122 – 2324 - 27282SPECIAL PROVISIONSThe following Special Provisions supplement the “Standard Specifications for Road and BridgeConstruction of the State of Illinois”, adopted January 1, 2022, and the Supplemental Specifications andRecurring Special Provisions, adopted January 1, 2026, along with the “Standard Specifications for Waterand Sewer Main Construction in Illinois”, 8th edition, adopted in 2020, and the Illinois Department ofTransportation Central Bureau of Materials Manual of Test Procedures for Materials, December 1, 2022Edition, which govern the “OUTER BELT WEST WATER MAIN AVENUE OF MID-AMERICA TOKELLER DRIVE PROJECT”, City of Effingham, Illinois, and in case of conflict with any part or parts ofsaid Specifications, the said Special Provisions shall take precedence and shall govern.LOCATION OF PROJECTThe proposed work for this project is to be located along Outer Belt West between Keller Drive and Avenueof Mid America in the City of Effingham, IL 62401. Please see location map on the title sheet of theconstruction plans for additional details.DESCRIPTION OF WORKThe project consists of constructing approximately 2,400 linear feet of 10-inch water main along OuterBelt West. The work includes installation of new water main, hydrants, valves, tapping sleeves, bends,and a street crossing as shown in the plan and profile sheets. Construction also includes restoration of alldisturbed areas back to their original condition. Construction shall not commence until all requiredeasements have been secured and the Illinois EPA permit has been obtained.LIQUIDATED DAMAGESIt is understood and agreed that time is of the essence in the performance of the Contract and that failureon the part of the Contractor to complete the contract work in the time herein set forth will result in certainloss and damages to the Owner. Failure on the contractor’s part to complete such work shall be consideredjust cause for forfeit of his/her surety bond.No street closures are anticipated for this project. If any street closures become necessary, the Contractormust first coordinate with the City of Effingham or the Illinois Department of Transportation, as applicable,and complete all closures in a timely manner. Any roadway or driveway pavement removed duringconstruction shall be replaced with permanent or temporary pavement prior to reopening the area to traffic.If the Contractor fails or neglects to meet these requirements, the Contractor shall pay to the Owner anysums due under the Contract, at the rates specified in the Standard Specifications for Road and BridgeConstruction.In case the Contractor of the work shall fail or neglect to have substantial completion of the project on orbefore October 30, 2026 then said Contractor shall and will pay to the Owner such sums as may be dueto him under the terms of the Contract at the rate specified in the Standard Specifications for Road andBridge Construction. Substantial completion shall be defined as completion of all work necessary to placethe water main into service and receipt of an Illinois Environmental Protection Agency (IEPA) OperatingPermit. If the IEPA Construction Permit is not issued by July 15, 2026, the Contract Time shall be extendedon a day-for-day basis for each day of delay beyond that date, as determined by the City.COMMENCEMENT OF WORK / PERMITS AND EASEMENTSConstruction shall not begin until all required permits, including the Illinois Environmental ProtectionAgency (IEPA) construction permit and the IDOT Utility Permit, have been obtained and all necessaryeasements have been secured by the City. Issuance of the Notice to Proceed shall be contingent uponcompletion of these requirements. The Contractor shall not be entitled to additional compensation fordelays related to permit acquisition or easement procurement and shall coordinate all constructionactivities in accordance with the timing established by the City.4JOINT UTILITY LOCATING INFORMATION FOR EXCAVATORS (J.U.L.I.E.)This work shall be done in accordance with Article 107.39 of the Standard Specifications except as hereinmodified.If any of the location marks placed by a utility company in conformance with this procedure are destroyedby Contractor operations, the Contractor shall immediately notify the utility owner and bear the costs ofremarking the facilities at his own cost and expense. Compliance with this special provision shall beconsidered incidental to the contract and no additional compensation will be allowed for any costs incurred.CONTRACTOR RESPONSIBLE FOR LOCATING UTILITIESBefore beginning work, it shall be the Contractor’s sole responsibility to coordinate with the utility ownersand to determine the actual location of all such facilities. The Contractor shall also obtain from the respectiveutility owners detailed information relative to the location of their facilities and the working schedules of theutility owners for removing or adjusting them.If utilities are encountered that differ from those shown on the plans or interfere with the proposedconstruction, the Contractor shall immediately notify the Engineer and no work shall proceed in the affectedarea until direction is provided. The Contractor shall perform all work necessary to avoid damage to existingutilities, including had excavation as required. All utility coordination, delays, adjustments to constructionoperations, and protection of existing facilities shall be considered incidental to the contract, and noadditional compensation will be allowed.COOPERATION BETWEEN CONTRACTORSThere is a possibility that other Contractor operations may be ongoing within the proposed project limits atthe same time as the work included in this contract is being performed. The Contractor for this Sectionshall cooperate with any other Contractors performing work adjacent to this project in accordance withArticle 105.08 of the Standard Specifications. Any inconveniences or delays caused the Contractor incomplying with this requirement shall be considered incidental to the contract and no additionalcompensation will be allowed.LOCATION OF UTILITIES NOT SHOWN ON PLANSThe Contractor is advised that various underground and surface utilities and structures may or may notbe correctly shown on the plans. Such facilities are shown on the plans for the information of theContractor, but information so given is not to be construed as a representation that such facilities will befound or encountered exactly as shown.Additional underground utilities, including but not limited to electric, lighting conduit, communications, fiberoptic facilities, and other private or public utilities may exist within the project limits but are not shown onthe plans. Other utilities and structures may also be encountered which are not shown on the plans.The Owner and its Engineer assume no responsibility whatever in respect to the sufficiency or accuracyof the information shown in the plans relative to the presence or location of such facilities.MAINTAIN UTILITIES IN OPERATING CONDITIONThe Contractor shall maintain in operating condition all utilities encountered in the work. The Contractorshall be entirely responsible for all damages to water pipes; electrical conduits; existing drains or sewers;gas pipes; and poles carrying electrical current, telephone or television lines during the prosecution of thework and shall be liable for damages to public or private property resulting there from, which amount maybe deducted from any monies due the Contractor for work done. Any damage to existing utilities as a resultof the Contractor’s construction operations shall be repaired to the satisfaction of the utility owner at theContractor’s expense, whether or not said utilities are shown in the plans.5
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Elgin Sports Complex Soccer F...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Elgin, Illinois
Bid Due: 7/13/2026
2026 Centennial Ice Arena HVA...
Bid/RFP Documents Contact Important Dates 2026 Centennial Ice Arena HVAC Replacement for Multi-Purpose
Park District of Highland Park
Bid Due: 7/16/2026