Transportation Maintenance Deltona - Replace Fuel Island and Tanks
Project Information
- Bid Title
- Transportation Maintenance Deltona - Replace Fuel Island and Tanks
- Issuing Agency
- Volusia County Schools
- Location
- Florida
- Published Date
- Jul 8, 2026
- Closing Date
- Jul 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project No. 2648210
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Transportation Maintenance Deltona - Replace Fuel Island and Tanks - Project No. 2648210
Mandatory Prebid Meeting: June 25, 2026 at 11:30 AM Bid: July 15, 2026 at 1:30 PM Project Bid Documents: Plans
Project Manual
Prebid Sign-in
Addendum No. 1 issued 7/08/2026Estimate: $1,323,828.10 Consultant: Kimley-Horn and Associates, Inc.
Jeremy Demboski
(813) 620-1460Owner: VCS Project Manager
Jim Bott
(386) 947-8786Bid Status: Active - Attachment Preview
-
VOLUSIACOUNTY SCHOOLS"LEADING WITH GRACE AND RESPECT"THE SCHOOL BOARD OF VOLUSIACOUNTY FLORIDA200 North Clara AvenueDeLand, Florida 32720TRANSPORTATION / MAINTENANCE -DELTONAREPLACE FUEL ISLAND AND TANKSVCS Project NO. 26482102101 EUSTACE AVE DELTONA, FL 32725SCHOOL BOARDMEMBERSRUBEN COLONKRISTA GOODRICHDONNA BROSEMERJAMIE HAYNESJESSIE THOMPSONDR. CARMEN J. BALGOBINBOARD CHAIRVICE BOARD CHAIRMEMBERMEMBERMEMBERSUPERINTENDENT201 N FRANKLIN STSUITE 1400TAMPA, FL 33602PHONE: 813.620.1460REGISTRY NO. 35106This document is an instrument of service preparedsolely for Kimley-Horn's client and for a particularpurpose. Any other use or reliance is without liability toKimley-Horn.DESCRIPTION OF WORKREPLACE AND RELOCATE EXISTING 6,000 GALLON UNLEADED AND 12,500 GALLON DIESEL UNDERGROUND STORAGE TANKSWITH 12,000 GALLON UNLEADED AND 12,500 GALLON DIESEL ABOVEGROUND STORAGE TANKS FOR THE BASE BID, ALSOREPLACE EXISTING 20,000 GALLON DIESEL ABOVEGROUND STORAGE TANK WITH NEW 20,000 GALLON DIESELABOVEGROUND STORAGE TANK AS AN ADD ALTERNATE. ALL PIPING WILL BE REPLACED AND ROUTED ABOVEGROUND WITHCARBON STEEL PIPE AND EXTERIOR COATINGS FOR THE BASE BID AND STAINLESS STEEL PIPE AS AN ADD ALTERNATE. THEEXISTING CANOPY WILL BE REPLACED AND RELOCATED. THE FUELING MANAGEMENT SYSTEM WILL BE REPLACED ANDRELOCATED. THE 2 DISPENSERS (4 TOTAL HOSES) WILL BE REPLACED WITH 3 DISPENSERS (6 TOTAL HOSES).Architect's Statement of ComplianceTo the best of my knowledge, these drawings and the project manual are complete and comply withthe Florida Building Code.LOCATION MAPENGINEERS & CONSULTANTSPLUMBING / FUEL OILKIMLEY-HORN201 N. FRANKLIN ST., SUITE 1400TAMPA, FL 33602(813) 556 - 6670JEREMY DEMBOSKIJEREMY.DEMBOSKI@KIMLEY-HORN.COMWWW.KIMLEY-HORN.COMELECTRICALKIMLEY-HORN201 N. FRANKLIN ST., SUITE 1400TAMPA, FL 33602(813) 467 - 7527JIMMY NGUYENJIMMY.NGUYEN@KIMLEY-HORN.COMWWW.KIMLEY-HORN.COMSTRUCTURALKIMLEY-HORN11601 KEW GARDENS AVE, SUITE 200PALM BEACH GARDENS, FL 33410(561) 840 - 0281SHEILA PREBLESHEILA.PREBLE@KIMLEY-HORN.COMWWW.KIMLEY-HORN.COMCIVILKIMLEY-HORN6876 MARWICK LANE, SUITE 350ORLANDO, FL 32827(407) 409 - 7003BLAKE WAGNERBLAKE.WAGNER@KIMLEY-HORN.COMWWW.KIMLEY-HORN.COMNOT TO SCALEPROJECT SHEET INDEXSHEET NUMBERSHEET NAME.GENERALG000COVER SHEET.PLUMBINGP000P001P101PD102P201P300P301P302P303FUEL OIL SYMBOLS, ABBREVIATIONS, SHEET SPECS AND NOTESFUEL OIL EQUIPMENT LISTFUEL OIL NEW PLANFUEL OIL DEMO PLANFUEL OIL ISOMETRIC PLANSFUEL OIL DETAILSFUEL OIL DETAILSFUEL OIL SCHEMATIC DIAGRAMSFUEL OIL SITE SCHEMATIC PLANCIVILC100C200C300C310C400C500C600GENERAL NOTESSTORMWATER POLLUTION PREVENTION PLANOVERALL EXISTING CONDITIONS AND DEMOLITION PLANEXISTING CONDITIONS AND DEMOLITION PLANSITE PLANPAVING AND GRADING PLANGENERAL CONSTRUCTION DETAILSELECTRICALE000E001ED101E101E102E201E500E600E601ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTESELECTRICAL SPECIFICATIONSELECTRICAL DEMO POWER PLANOVERALL POWER PLANENLARGED POWER PLAN FUEL CANOPYELECTRICAL LIGHTING PLANELECTRICAL RISR DIAGRAMELECTRICAL DETAILSHAZARD CLASSIFICATIONSSTRUCTURALS100S200S201S202STRUCTURAL GENERAL NOTESCANOPY DETAILSFUEL TANK SLAB DETAILS 1 OF 2FUEL TANK SLAB DETAILS 2 OF 2CONSTRUCTION DOCUMENTS - 03/23/2026ARCH/ENGR OF RECORDJEREMY DEMBOSKIDESIGNED BYJTDDRAWN BYSRMISSUE DATE3/23/2026AE PROJECT NUMBER145642003SHEET TITLECOVER SHEETDRAWING NO.G000PLUMBING SYMBOLS AND LEGENDSYMBOLABBREVIATION DESCRIPTIONBVCSBFVGVCHVGLVANVTDVHBHVBPGPRBALL VALVECIRCUIT SETTER OR FLOW CONTROL VALVEBUTTERFLY VALVEGATE VALVECHECK VALVEGLOBE VALVEANGLE VALVETRIPLE DUTY VALVEHOSE BIB3/4" HOSE END DRAIN VALVEBACKFLOW PREVENTORGAS PRESSURE REGULATORSTRSTRPTRRVWHAPGTHFCO/GCOWCOPDPUPUPDCOPFLSFDVTRSTRAINERSTRAINER WITH 3/4" HOSE END DRAIN VALVEPRESSURE - TEMPERATURE RELIEF VALVEPRESSURE RELIEF VALVE2-WAY CONTROL VALVE3-WAY CONTROL VALVEUNIONREDUCERWATER HAMMER ARRESTORPRESSURE GAGE WITH GAUGE COCKTHERMOMETERFLOOR OR GRADE CLEANOUTWALL CLEANOUTPIPING TEE DOWNPIPING TEE UPPIPING ELBOW UPPIPING ELBOW DOWNBRANCH - TOP CONNECTIONBRANCH - BOTTOM CONNECTIONCAP ON END OF PIPEARROW INDICATES DIRECTION OF EACH FLOWFLOOR SINKFLOOR DRAINPLUMBING VENT THRU ROOFFLORIDA DEPARTMENT OF ENVIRONMENTALPROTECTION APPROVED STORAGE TANK SYSTEMEQUIPMENTEQ-352 MODERN WELDING, FIREGUARD DOUBLE-WALL ABOVEGOUND TANKEQ-527 MORRISON 918 AST CLOCK GAUGE WITH AN ALARM SYSTEMEQ-356 MORRISON 9095A OVERFILL PROTECTION VALVEEQ-535 MORRISON 515 REMOTE FILL SPILL CONTAINMENTEQ-628 VEEDER-ROOT MAG SENSOR HYDROSTATIC TEST AND SECONDARYCONTAINMENT VACUUM SENSING SYSTEMEQ-876 VEEDER-ROOT TLS4 CONSOLENOTE:THE STORAGE TANK SYSTEM INSTALLATION PLAN MEETS THEREQUIREMENTS OF CHAPTER 62-762 FLORIDA ADMINISTRATIVE CODE ANDALL THE APPLICABLE REFERENCE GUIDELINES.FUEL OIL SHEET LISTSHEET #P000P001P101P201P300P301P302P303PD102SHEET NAMEFUEL OIL SYMBOLS, ABBREVIATIONS, SHEET SPECS AND NOTESFUEL OIL EQUIPMENT LISTFUEL OIL NEW PLANFUEL OIL ISOMETRIC PLANSFUEL OIL DETAILSFUEL OIL DETAILSFUEL OIL SCHEMATIC DIAGRAMSFUEL OIL SITE SCHEMATIC PLANFUEL OIL DEMO PLANPLUMBING PIPING LEGENDSYMBOLSTSTODLODLCDTWTPGMPGHPGLPGCAABBREVIATION DESCRIPTIONCWCOLD WATERHWSHOT WATER SUPPLYHWRHOT WATER RETURNWSANITARY WASTEWSANITARY WASTE (ABOVE GRADE)GLWGREASE LADEN WASTEVVENT PIPINGSTSTORM OR ROOF DRAIN PIPINGSTSTORM OR ROOF DRAIN PIPING (ABOVE GRADE)ODLOVERFLOW ROOF DRAIN PIPINGODLOVERFLOW ROOF DRAIN PIPING (ABOVE GRADE)CDCONDENSATE DRAIN PIPINGTWTEMPERED WATER (105* F)TPTRAP PRIMER WATER PIPINGGGAS - LOW PRESSURE (7"-14" WC)MPGGAS - MEDIUM PRESSURE (2-3 PSI)HPGGAS - HIGH PRESSURE (5 PSI AND ABOVE)LPGGAS - LIQUIFIED PETROLEUMCACOMPRESSED AIR PIPINGPLUMBING ANNOTATIONSSYMBOL ABBREVIATION DESCRIPTIONRTUMECHANICAL EQUIPMENT - (SEE MECHANICAL SCHEDULE)X1M6.1DETAIL REFERENCE CALLOUT, DETAIL NUMBER AND SHEET1P0.00L-1?SECTION VIEW CALLOUT, DETAIL NUMBER AND SHEETPOCAPPOINT OF CONNECTION - NEW ITEMS TO EXISTING ITEMSPLUMBING FIXTURE SCHEDULE - (SEE SCHEDULE)SHEET KEYNOTESACCESS PANELAPPLICABLE CODES1.2023 FLORIDA BUILDING CODE•2023 FLORIDA BUILDING CODE, PLUMBING•2023 FLORIDA BUILDING CODE, MECHANICAL•2023 FLORIDA BUILDING CODE, FUEL GAS•2023 FLORIDA BUILDING CODE, ENERGY CONSERVATION2.FLORIDA DEPARTMENT OF ENVIRONMENTAL QUALITY•62-762 F.A.C. ABOVEGROUND FUEL TANK INSTALLATIONS.3.NATIONAL FIRE PROTECTION ASSOCIATION:•30: FLAMMABLE AND COMBUSTIBLE LIQUID CODE•30A: AUTOMOTIVE SERVICE STATION CODE•70: NATIONAL ELECTRIC CODE4.AMERICAN PETROLEUIM INSTITUTE•1604: CLOSURE OF UNDERGROUND PETROLEUM STORAGE TANKS•334: GUIDE TO LEAK DETECTION FOR ABOVEGROUND STORAGE TANKS•340: LIQUID RELEASE PREVENTION AND DETECTION MEASURES FORABOVEGROUND STORAGE FACILITIES5.PETROLEUM EQUIPMENT INSTITUTE:•RP 200 INSTALLATION OF ABOVEGROUND STORAGE SYSTEMS•RP 500 INSPECTION & MAINTENANCE OF MOTOR FUEL DISPENSING EQUIPMENT•RP 600 OVERFILL PREVENTION FOR ASTS6.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION:•CONSTRUCTION SAFETY AND HEALTH REGULATIONS SUBPART P, 1902.50 THRU1926.6537.MANUFACTURER'S STANDARDIZATION SOCIETY•MSS SP-58: PIPE HANGERS AND SUPPORTSFUEL DISPENSER REGULATIONSAND LABELING1.DISPENSERS MUST BE INSTALLED IN ACCORDANCE WITH LOCAL AND STATEREGULATIONS.2.THE FOLLOWING REGULATION IS APPLICABLE TO THE UNLEADED FUEL DISPENSINGSYSTEM AND MUST TAKE PRECEDENCE OVER ALL INDICATED DATA ON THISDRAWING:A.16 CFR PART 306 - AUTOMOTIVE FUEL RATINGS, CERTIFICATION, ANDPOSTING.3.ALL LABELS MUST BE RESISTANT TO FUEL, GREASE, OIL, SOLVENTS, ANDDETERGENTS AND MUST BE ABLE TO WITHSTAND EXTREME WEATHER CONDITIONSFOR AT LEAST ONE YEAR.4.ACCEPTABLE LABELS INCLUDE LABELS APPROVED BY THE CONTRACTING OFFICERAND STANDARD TO THE INDUSTRYPLUMBING ABBREVIATIONSABBREVIATION@ADAAFFAHJAPIAPPROX.ASTATGAUX.AVAWBHPBOPBTU/HCOMB.CONN.CSCSDL.DBL.D.C.DIADIM.DSL(E)EFFELECT.ELDELLEMTE.S.O.FF-24F.G.FLAFLEXFNPTFO-DFO-ULFPMFRPFSPGAGAL.GPMHDH.P.I.D.KWLBS.MBHMAX.MCAMFRSMGSMIN.MNPTMOCPMW(N)N/AN/CNECNFPANPTN/ONO.N.T.S.O.D.OFCIPPDPRVPSIPVCQRDREF.REQD.RPMRSG.SEC.SPECSSSS.T.P.T.L.M.TYP.U.B.C.U.F.C.U.G.U.L.U.M.C.UNLU.P.C.U.S.T.VVPRVAC.VFDV.R.W/W.C.WVSDESCRIPTIONATAMERICANS WITH DISABILITIES ACTABOVE FINISHED FLOORAUTHORITY HAVING JURISDICTIONAMERICAN PETROLEUM INSTITUTEAPPROXIMATELYABOVEGROUND STORAGE TANKAUTOMATIC TANK GAUGEAUXILIARYACID VENTACID WASTEBRAKE HORSE POWERBOTTOM OF PIPEBRITISH THERMAL UNIT PER HOURCOMBINATIONCONNECTIONCARBON STEELCONTINUOUS STATISTICAL LEAK DETECTIONDOUBLEDIRECT CURRENTDIAMETERDIMENSIONDIESEL FUELEXISTINGEFFICIENCYELECTRICALENHANCED LEAK DETECTIONELBOWELECTRICAL METALLIC TUBINGEMERGENCY SHUT OFFFILLJET FUELFIBERGLASSFULL LOAD AMPSFLEXIBLEFEMALE NATIONAL PIPE THREADFUEL OIL - DIESELFUEL OIL - UNLEADEDFEET PER MINUTEFIBERGLASS REINFORCED PLASTICFUEL SAMPLE POINTGAGE OR GAUGEGALLONGALLONS PER MINUTEHEAD PRESSUREHORSEPOWERINSIDE DIAMETERKILOWATTPOUNDSONE THOUSAND BTUHMAXIMUMMINIMUM CICUIT AMPSMANUFACTURER'SMOGAS FUELMINIMUMMALE NATIONAL PIPE THREADMAXIMUM OVER CURRENT PROTECTIONMONITOR WELLNEWNOT APPLICAPLENORMALLY CLOSEDNATIONAL ELECTRIC CODENATIONAL FIRE PROTECTION ASSOCIATIONNATIONAL PIPE THREADNORMALLY OPENNUMBERNOT TO SCALEOUTSIDE DIAMETEROWNER FURNISHED, CONTRACTOR INSTALLEDPRODUCT LINEPRESSURE DROPPRESSURE REDUCING VALVEPOUNDS PER SQUARE INCHPOLYVINYL CHLORIDEQUANTITYROOF DRAINREFERENCEREQUIREDREVOLUTIONS PER MINUTERIGID STEEL GALVANIZEDSECTIONSPECIFICATIONSSTAINLESS STEELSUBMERGED TURBINE PUMPTANK LEVEL MONITORTYPICALUNIFORM BUILDING CODEUNIFORM FIRE CODEUNDER GROUNDUNDERWRITER'S LABORATORYUNIFORM MECHANICAL CODEUNLEADEDUNIFORM PLUMBING CODEUNDERGROUND STORAGE TANKVAPOR LINEVAPOR FUELVOLT AMP CURRENTVARIABLE FREQUENCY DRIVEVAPOR RECOVERYWITHWATER COLUMNWASTE VENT STACKFUEL OIL GENERAL NOTESGENERAL:A.CONTRACTOR SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE INSTALLING FLEET FUELSYSTEMS AND MUST HAVE THE FOLLOWING CERTIFICATIONS IN ORDER TO BID ON THIS PROJECTOR BE INVOLVED ON ANY CONSTRUCTION.a.OPW FUEL MANAGEMENT CERTIFICATIONb.GILBARCO / VEEDER-ROOT CERTIFICATIONB.ALL PIPING WILL BE PRIMARY PIPING WITHIN SECONDARY PIPING. SIZES TO BE SPECIFIED ONDRAWINGS. PIPING TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.C.ALL ABOVEGROUND PIPING WILL BE LISTED IN ACCORDANCE WITH UL/ULC 1369.D.THE INFORMATION INDICATED ON THESE DRAWINGS AS EXISTING IS BASED UPON INFORMATIONTAKEN FROM AS-BUILT DRAWINGS, FIELD INVESTIGATION, AND INFORMATION OBTAINED FROMEXISTING SUBMITTAL DATA, ETC. THE PLANS DO NOT GUARANTEE ACCURACY BUT ARE ONLY ANINDICATION OF EXISTING CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELDVERIFY EXACT CONDITIONS SUCH AS EQUIPMENT PLACEMENT, PIPING (SIZE, ROUTING, ANDELEVATION), ETC. THE DRAWINGS ARE INTENDED TO PROVIDE THE CONTRACTOR AN INDICATIONOF THE SYSTEM INSTALLED IN THE FACILITY TO DATE. IT WILL BE THE CONTRACTOR'SRESPONSIBILITY TO MAKE ADJUSTMENTS TO THE DRAWING INFORMATION AS REQUIRED TOMATCH EXISTING FIELD CONDITIONS.THE GENERAL CONTRACTOR ACCEPTS FULLRESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF PIPING SYSTEM. THE GENERALCONTRACTOR SHALL ENSURE THAT GOOD WORKMANSHIP AND CONSTRUCTION PROCEDURESARE FOLLOWED THROUGHOUT THE INSTALLATION, REGARDLESS OF INCLUSION OR OMISSION OFANY APPLICABLE SUGGESTION IN THESE INSTRUCTIONS OR ON THE DRAWINGS.RESPONSIBILITY:A.ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL ALL POWER WIRING, EQUIPMENTDISCONNECTS, LOW VOLTAGE WIRING, ATG SENSOR, AND PROBE WIRING TO MAKE SYSTEMOPERATIONALB.FUEL OIL CONTRACTOR TO PROVIDE, CALIBRATE, AND INSTALL DISPENSERS, TANKS, PUMPS, ANDPIPING.C.FUEL OIL CONTRACTOR, ELECTRICAL CONTRACTOR, CONSTRUCTION MANAGER, AND NETWORKSUPPLIER MUST BE ON SITE ON DAY OF SYSTEM STARTUP.SETTLEMENT:THE USE OF SPECIFIED MATERIALS AND SPECIFIED PROCEDURES WILL ENSURE THAT TANKSETTLEMENT, TANK DISTORTION, MOVEMENT IN CONCRETE SLAB, OR INSTALLATION FAILURE DONOT OCCUR. SHOULD ANY INSTALLATION FAILURE BE MADE APPARENT, THE CONTRACTOR WILLASSUME RESPONSIBILITY FOR NOT FOLLOWING THE SPECIFIED PROCEDURES AND WILL INCURANY ADDITIONAL COSTS ASSOCIATED WITH THE CORRECTIVE MEASURES, INCLUDING COMPLETEREMOVAL AND RESETTING OF ALL ABOVEGROUND TANKAGE AT THE SITE. IF IT IS DETERMINEDTHAT MOVEMENT, SETTLEMENT, OR DISTORTION HAS BEEN CAUSED BY FACTORS BEYOND THECONTRACTOR'S CONTROL, THE COST OF REMEDIAL MEASURES WILL BE BORNE BY OTHERS. THEFUEL OIL INSTALLATION CONTRACTOR DOES HEREBY AGREE TO GUARANTEE THEABOVEGROUND TANKAGE INSTALLATION AGAINST FAILURE AS OUTLINED HERIN ABOVE, FOR APERIOD OF ONE (1) YEAR FROM DATE OF FINAL ACCEPTANCE.TANK, DISPENSER, AND PIPES:A.THE DRAWINGS AND SPECIFICATIONS WILL DETERMINE THE EXACT LOCATION, NUMBER, SIZE,AND TYPE OF EQUIPMENT TO BE INSTALLED AND INSTALLATION TO BE FOLLOWED.B.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S, FEDERAL, STATE, ANDALL OTHER APPLICABLE CODES, RULES, AND LOCAL REQUIREMENTS.C.CONTRACTOR ASSUMES RESPONSIBILITY FOR ALL NECESSARY PERMITS, INSPECTIONS, ANDTESTS AND SHALL INCLUDE THE COST OF THESE REQUIREMENTS IN THEIR BID.D.CONTRACTOR TO INSTALL AND TEST ALL ALL TANKS, PIPING, DISPENSERS, AND MONITORINGEQUIPMENT PER MANUFACTURER'S INSTRUCTIONS, INCLUDING THE INSTALLATION OF STAGE IVAPOR RECOVERY.E.CONTRACTOR SHALL INSTALL ALL ABOVEGROUND PIPING SHOWN ON THE DRAWINGS, WITH AMINIMUM NUMBER OF BENDS/ELBOWS.F.NEW ABOVEGROUND FUEL PIPING MUST BE SINGLE WALL CARBON STEEL MATERIAL WITHEXTERIOR COATINGS.G.ABOVEGROUND TANKS AND PIPES MUST USE COLOR CODING, BANDING, PRODUCT NAMES, ANDDIRECTION OF FLOW TO IDENTIFY PRODUCT SERVICE.H.PROVIDE LOW POINT DRAINS AT ALL LOW POINTS AND HIGHT POINT VENTS AT ALL HIGHT POINTS.INSTALL FUEL PIPING WITH A MINIMUM SLOPE OF 0.2% DOWN FROM THE HIGH POINTS TO THELOW POINTS, UNLESS OTHERWISE INDICATED.I.PIPE SUPPORTS WELDED TO CARBON STEEL MUST BE EXTERIOR COATED CARBON STEEL. ALLOTHER PIPE SUPPORTS AND OTHER MISCELLANEOUS METAL SHAPES MUST BE HOT DIPPEDGALVANIZED CARBON STEEL, UNLESS OTHERWISE INDICATED.FINISH:ALL PRODUCTS TO BE SHERWIN-WILLIAMS. BOLLARDS AND ISLAND FORMS (IF REQUIRED BY AHJ)TO MATCH EXISTING.CANOPY:CANOPY IS A PREFAB STEEL STRUCTURE, REFER TO STRUCTURAL DRAWINGS FOR MOREINFORMATION.CONTRACTOR:A.CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS AND SPECIFICATIONSASSOCIATED WITH THIS PROJECT SCOPE AND WILL NOTIFY THE PROJECT ENGINEER IN WRITINGPRIOR TO THE INITIATION OF CONSTRUCTION. IF A CONFLICT WITH THE DOCUMENTS RELATIVETO THE SPECIFICATIONS OR APPLICABLE CODES IS FOUND. FAILURE BY THE CONTRACTOR TONOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BYTHE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND INFULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.B.THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATIONOF THE ASTS, DISPENSERS, AND ALL EQUIPMENT AND SHALL ENSURE THAT GOODWORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE FOLLOWED REGARDLESSOF THE INCLUSION OR OMISSION OF ANY INSTRUCTION.C.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE AND THE MANUFACTURER'SINSTRUCTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR, REGARDLESS OF THEPRESENCE OF THE MANUFACTURER, ENGINEER, OR OWNER AT THE INSTALLATION SITE.D.ABOVEGROUND TANKS MUST BE INSTALLED PER THESE SPECIFICATIONS, DRAWINGS,MANUFACTURER'S INSTRUCTIONS, AND NFPA 30 AND 30A. ANY LOCAL CODES THAT APPLY MUSTBE FOLLOWED. FAILURE TO FOLLOW THESE INSTALLATION INSTRUCTIONS WILL VOID THEWARRANTY AND WILL RESULT IN TANK FAILURE. PROPER INSTALLATION OF ASTS HELP PREVENTTANK DAMAGE AND SHOULD ENSURE LONG-TERM CORROSION-PROOF SERVICE.E.THE INSTALLATION PROCEDURE SHALL COMPLY WITH BOTH THESE SPECIFICATIONS AND THERESPECTIVE TANK MANUFACTURER'S SPECIFICATIONS. IF THE CONTRACTOR FINDS A CONFLICTIN BETWEEN THESE TWO SPECIFICATIONS, IT IS THEIR RESPONSIBILITY TO CONTACT THEENGINEER OF RECORD FOR CLARIFICATION AND GUIDANCE.F.AN INTERSTITIAL INTEGRITY TEST SHALL BE PERFORMED ON EACH DOUBLE-WALLED STORAGETANK WITH A CLOSED INTERSTICE AFTER IT IS DELIVERED AND PLACED AT ITS FINAL LOCATIONAT THE FACILITY, AND BEFORE THE STORAGE TANK IS PLACED INTO SERVICE. TEST SHALL BEPERFORMED IN ACCORDANCE WITH THE MANUFACTURERS TESTING SPECIFICATIONS. TESTRESULTS SHALL BE PROVIDED TO EOR, CLIENT, AND ENVIRONMENTAL.G.ALL OVERFILL PROTECTION DEVICES SHALL BE TESTED FOR OPERABILITY AT INSTALLATION ANDTEST RESULTS SHALL BE MAINTAINED AND AVAILABLE FOR INSPECTION BY THE DEPARTMENT ORCOUNTY IN ACCORDANCE WITH RULE 62-762.711, F.A.C.H.PRESSURIZED SMALL DIAMETER INTEGRAL PIPING SYSTEMS CONNECTED TO DISPENSERS SHALLBE INSTALLED WITH SHEAR VALVES OR EMERGENCY SHUTOFF VALVES IN ACCORDANCE WITHSECTION 6.3 OF NFPA 30A, CODE FOR MOTOR FUEL DISPENSING FACILITIES AND REPAIRGARAGES, REQUIREMENTS FOR DISPENSING DEVICES, 2021 EDITION. THESE VALVES SHALL BEDESIGNED TO CLOSE AUTOMATICALLY IF A DISPENSER IS DISPLACED FROM ITS NORMALPOSITION. THE VALVES SHALL BE RIGIDLY ANCHORED INDEPENDENTLY OF THE DISPENSER. THEVALVES SHALL BE TESTED IN ACCORDANCE WITH PEI/RP1200-19, 2019 EDITION, INCORPORATEDBY REFERENCE IN SUBPARAGRAPH 62-762.501(1)(B)8., F.A.C., AT THE TIME OF INSTALLATION BY ACERTIFIED CONTRACTOR TO CONFIRM THAT THE AUTOMATIC CLOSING FUNCTION OF THE VALVEOPERATES PROPERLY, AND THAT THE VALVE IS PROPERLY ANCHORED.I.RELEASE DETECTION DEVICES SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH62-762.701(4) F.A.C.J.CONTRACTOR SHALL PROVIDE TANK EXCAVATION HOLE PROTECTION WHEN REMOVINGEXISTING FUEL TANKS UNTIL PAVING IS IN PLACE PER OSHA STANDARD 1910. COVERS AND / ORGUARDRAILS SHALL BE PROVIDED TO PROTECT PERSONNEL FROM THE HAZARDS OF OPEN PITS,TANK VATS, DITCHES, ETC.K.CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO FDEP BETWEEN 30-45 DAYS BEFOREINSTALLATION OF THE ABOVE GROUND STORAGE TANKS TO COMPLY WITH FAC 62-762.L.NOTIFICATION SHALL BE RECEIVED BY THE COUNTY IN WRITING OR ELECTRONIC FORMATBETWEEN 30 AND 45 DAYS BEFORE THE INITIATION OF THE WORK RELATED TO THE CLOSURE OFTHE EXISTING UNDERGROUND STORAGE TANKS.M.CONTRACTOR SHALL SUBMIT COMPLETED REGISTRATION FORM IN PAPER OR ELECTRONICFORMAT TO THE DEPARTMENT WITHIN 10 DAYS AFTER COMPLETION OF THE DEMOLITION OF THETWO UNDERGROUND FUEL STORAGE TANKS PER 62-762.802(3)(B)8., F.A.C. FOR CLOSURE OFFUEL TANKS.N.A CLOSURE INTEGRITY EVALUATION REPORT FORM FOR ASTS 62-762.901(7), MUST BE PROVIDEDTO THE COUNTY WITH THE NOTIFICATION OF CLOSURE.O.CONTRACTOR SHALL TAKE FULL RESPONSIBILITY OF THE ABOVE GROUND STORAGE TANKS.PROVIDE CERTIFICATE OF LIABILITY FOR THE TANKS UNTIL VCS TAKES OWNERSHIP.201 N FRANKLIN STSUITE 1400TAMPA, FL 33602PHONE: 813.620.1460REGISTRY NO. 35106This document is an instrument of service preparedsolely for Kimley-Horn's client and for a particularpurpose. Any other use or reliance is without liability toKimley-Horn.ARCH/ENGR OF RECORDJEREMY DEMBOSKIDESIGNED BYJTDISSUE DATE3/23/2026DRAWN BYSRMAE PROJECT NUMBER145642003SHEET TITLEFUEL OIL SYMBOLS,ABBREVIATIONS, SHEETSPECS AND NOTESDRAWING NO.P000TAG(N)AST-2(N)AST-3(N)AST-1STP-1RF-1RF-2VC-1VC-2TLSISENSINT-CAPDISPFMFEPART DESCRIPTIONEQUIPMENT LISTMANUFACTURERTANK EQUIPMENTMODEL NUMBERABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - BASE BIDABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - BASE BIDABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - ADD ALTERNATEMODERN WELDINGMODERN WELDINGMODERN WELDINGTANK SUMP EQUIPMENTFIREGUARD, 12,000 GALLON CAPACITYFIREGUARD, 12,500 GALLON CAPACITYFIREGUARD, 20,000 GALLON CAPACITY2 HP FIXED SPEED STP - STPM200-VL2-00FACTORY INCLUDED THREADED RISER PIPE - ONE PER STP2"x18" MxMS FIRESHILED FLEX CONNECTOR2" FULL PORT BALL VALVE3" FULL PORT BALL VALVEFE PETROFE PETROHOSE MASTERMORRISONMORRISONSPILL CONTAINMENT4" VAPOR SWIVEL ADAPTORDURATUFF STAGE VAPOR RECOVER CAPOPWOPWAST VALVES AND FITTINGSAST PEDESTAL & 1 STABILIZER BAR; W/27.5" Lx 15" W OPENINGAST OVERFILL VALVE 3" FILL 6" INSTALLATION PIPESOLENOID VALVE 2" VITON WITH 120 VOLT COIL15 GALLON REMOTE SPILL CONTAINER WITH (2) 3" OPENING15 GALLON REMOTE SPILL CONTAINER WITH (1) 3" OPENING3" DUCTILE IRON SWING CHECK VALVE3" DRY BREAKS 927DUST CAP2" DUCTILE IRON EXTERNAL EMERGENCY VALVECLOCK GAUGE WITH BATTERY OPERATED OVERFILL ALARM & 2" FLOAT2" ATMOSPHERIC VENT CAP2" PRESSURE/VAC VENT CAPMORRISONMORRISONMORRISONMORRISONMORRISONMORRISONMORRISONMORRISONMORRISONMORRISONOPWOPW402520901FSMS180200691---0800 1V691---1000 1V61VSA-1020-EVR1711T-7085-EVR434X--17001 AK9095AA3300AVEVR710---0200 1V515---2300 AC515---0300 AC246ADI0600 AV927---0300AAEVR735DC-4000ACEVR346DI-0500 AV918---0100 AG23-0033623V-2203TANK MONITORING EQUIPMENT - VEEDER ROOT TLS 4B SYSTEMTLS4B CONSOLE, COLOR TOUCH SCREEN DISPLAY, EDIM, ULTLS4B APPLICATION SOFTWARE, 6 UNIVERSAL INPUTSEXTERNAL PRINTER FOR TLS4 SERIES CONSOLES (EPSON MODEL: TM-T88V)WALL MOUNTING BRACKET FOR EXTERNAL PRINTER FOR TLS4 SERIES CONSOLESSS PROBE, 0.2 MAG PLUS HGP CANISTER, WATER DETECTION, UL, ANY STD LENGTHINSTALL. KIT, MAG PLUS, PHAST-TWO WATER DETECTOR, 4" FLOAT, 5' CABLEINSTALL. KIT, MAG PLUS, DIESEL, 4" FLOAT, 5 CABLE4" NPT RISER CAP AND RING KIT FOR IN-TANK PROBESMAG PROBE INSTALLATION KIT FOR ABOVEGROUND STORAGE TANKINTERSTITIAL SENSOR FOR STEEL TANKS (4'-12' TANK I.D.) WITH 16' CABLE2" INTERSTITIAL SENSOR RISER CAP AND ADAPTOR KITOVERFILL ALARM BOXOVERFILL ALARM ACKNOWLEDGEMENT SWITCH/RESETVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOTVEEDER ROOT860196-020333435-001330020-832330020-839846397-2xx886100-000846400-001312020-952312020-984794390-420312020-928790091-001790095-001ISLAND EQUIPMENT1-1/2" EMERGENCY VALVEGASBOY ATLAS X COMMERCIAL DISPENSER - TWIN - ONE PRODUCT, FRONT LOADSTAINLESS STEEL-ALL PANELSPULSE OUTPUT, SINGLE OR DUALOPWGASBOYGASBOYGASBOY10BF-57259853GXTW1 DFZZ-AT0-ISSA00Z-AT0-APULIDDISPENSING ACCESSORIES3/4" DIESEL DISPENSING NOZZLE, GREEN1" MNPT TO 3/4" FNPT BUSHING1" CAMTWIST MAGNETIC RECONNECTABLE BREAKAWAYKIT, GAS - 3/4" BLACK, ERGO, C720, CTM75, 9' X 8"1" x 20' CURB HOSE1" x 9" WHIP HOSE360 HEAVY DUTY HIGH HOSE RETRIEVER360 HB HOSE BUNBASE FOR HOSE RETRIEVEROPWOPWCATLOWCATLOWFLEXHOSEFLEXHOSEPEMCOPEMCOPEMCOFUEL MANAGEMENT SYSTEMS11B-010028R-2404CTM-100HAER0002FLX HW302000FLXHW300009FM LIVE, CELLULAR, PROKEE/PROX. CARD READERTANK MONITORING INTERFACE WIRELESS KIT (RS-232)PROKEE ENCODER; USBFMLIVE ANNUAL SUBSCRIPTION SERVICESFMLIVE SETUP AND ACTIVATIONFMLIVE PROJECT MANAGEMENTFMLIVE DATABASE CONSTRUCTION AND OR CONVERSIONPROKEESFUELMASTERFUELMASTERFUELMASTERFUELMASTERFUELMASTERFUELMASTERFUELMASTERFUELMASTERMISCELLANEOUSFMU5720-F2191F0223941D0120FMLIVEBA/2+B1CLOUDBA/2PMLIVEBA/2+BI+CELLFMLIVE-DB-CONSTRUCT172405FIRE EXTINGUISHER AND CABINET (PURPLE-K)AST DECAL PACKAGEDECAL PACKAGE (PUMP NUMBERS, MAY CONTAIN 10% ETHANOL, ULSD)QUANTITY1113333211333113333321111131233331133334442444441111111300113201 N FRANKLIN STSUITE 1400TAMPA, FL 33602PHONE: 813.620.1460REGISTRY NO. 35106This document is an instrument of service preparedsolely for Kimley-Horn's client and for a particularpurpose. Any other use or reliance is without liability toKimley-Horn.ARCH/ENGR OF RECORDJEREMY DEMBOSKIDESIGNED BYJTDISSUE DATE3/23/2026DRAWN BYSRMAE PROJECT NUMBER145642003SHEET TITLEFUEL OIL EQUIPMENT LISTDRAWING NO.P0013/4" CW3/4" CA19186 FE14INT-CAP1211TLM 10(N)AST-2INT-CAP12(N)AST-3 11TLM92" FO-UL(N)DISP-11RF-13(TYP.)78(TYP.()TYP.)DEF-25FM(N)STP-1 13RF-278(TYP.()TYP.)(N)DISP-114162" FO-D47(N)DISP-1 (TYP.)2(TYP.)2" FO-D(N)STP-1 13319(TYP.)TLMINT-CAP1211(N)AST-11514RF-2(N)STP-1 13203/4" CA3/4" CWTRANSPORTATION BLDGRM 700-10RM 700-10TLSNORTH17NEW ENLARGED PLAN11/8" = 1'-0"PIPING LEGENDDIESELUNLEADEDGENERAL NOTES:1.ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THEGENERAL EXTENT OF THE WORK. CONTRACTOR TO BERESPONSIBLE FOR COORDINATION WITH OTHERTRADES BEFORE INSTALLATION OF ALL PLUMBING ANDFUEL OIL SYSTEMS. PIPING LAYOUT SHOWN ONDRAWINGS IS FOR GENERAL ARRANGEMENT ONLY. ALLWORK TO BE COORDINATED WITH FIELD CONDITIONSAND OTHER TRADES INVOLVED AS REQUIRED. DO NOTSCALE DIMENSIONS FROM THIS DRAWING. ALLDIMENSIONS TO BE VERIFIED IN FIELD AS REQUIRED.2.CONTRACTOR SHALL PROVIDE ALL SUPPORTING ANDHANGING FITTINGS AND EQUIPMENT FOR PROPERINSTALLATION OF ALL PLUMBING AND FUEL OILSYSTEMS.3.CONTRACTOR TO COORDINATE AND VERIFY ALLCLEARANCES BEFORE START OF ANY WORK.TANK, PIPING, AND INSTALLATION NOTES1.ALL NEW FUEL OIL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE INSTALLED ANDTESTED IN ACCORDANCE WITH APPLICABLE MANUFACTURER'S INSTRUCTIONS.2.ALL TANK AND PIPING INSTALLATION WORK IS TO BE PERFORMED BY A STATE REGISTEREDPOLLUTANT STORAGE SPECIALTY CONTRACTOR.3.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE STATE, COUNTY, ANDLOCAL REQUIREMENTSA.2023 FLORIDA BUILDING CODEB.FLORIDA DEPARTMENT OF ENVIRONMENTAL QUALITY:a.62-762 F.A.C. ABOVEGROUND FUEL TANK INSTALLATIONS.C.NATIONAL FIRE PROTECTION ASSOCIATION:a.30: FLAMMABLE AND COMBUSTIBLE LIQUID CODEb.30A: AUTOMOTIVE SERVICE STATION CODEc.70: NATIONAL ELECTRIC CODED.AMERICAN PETROLEUIM INSTITUTEa.1604: CLOSURE OF UNDERGROUND PETROLEUM STORAGE TANKSb.334: GUIDE TO LEAK DETECTION FOR ABOVEGROUND STORAGE TANKSc.340: LIQUID RELEASE PREVENTION AND DETECTION MEASURES FORABOVEGROUND STORAGE FACILITIESd.E.PETROLEUM EQUIPMENT INSTITUTE:a.RP 200 INSTALLATION OF ABOVEGROUND STORAGE SYSTEMSb.RP 500 INSPECTION & MAINTENANCE OF MOTOR FUEL DISPENSING EQUIPMENTc.RP 600 OVERFILL PREVENTION FOR ASTSF.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION:a.CONSTRUCTION SAFETY AND HEALTH REGULATIONS SUBPART P, 1902.50 THRU1926.653G.MANUFACTURER'S STANDARDIZATION SOCIETYa.MSS SP-58: PIPE HANGERS AND SUPPORTSH.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING UNDERGROUNDUTILITIES IDENTIFICATION BY CONTACTING FL. ONE CALL (1-800-432-4770) ANDAPPLICABLE MUNICIPAL JURISDICTION AT LEAST 48 HOURS PRIOR TO START OFCONSTRUCTION.I.THE CONTRACTOR SHALL BE RESPONSIBLE FOR GIVING REQUIRED NOTICE(S) ANDSCHEDULING APPLICABLE CITY, COUNTY AND / OR STATE INSPECTIONS AS REQUIREDFOR PERMIT CLOSE OUT(S).KEYNOTES1 UNLEADED DOUBLE-WALLED ABOVEGROUND STORAGE TANK2 DIESEL DOUBLE-WALLED ABOVEGROUND STORAGE TANK3 2" SINGLE-WALLED PIPING. PIPE TO SLOPE AT A MINIMUM SLOPE OF 1/8"PER FOOT BACK TO TANK.4 EXISTING DISPENSER TO BE DEMOLISHED.5 EXISTING DEF SYSTEM TO BE RELOCATED TO NEW FUEL ISLAND.6 INSTALL NEW FIRE EXTINGUISHER7 PAINTED CARBON STEEL PIPE TO BE SUPPORTED AT LEAST EVERY 10FT.8 STEEL PIPE TO BE ROUTED AT A HEIGHT BELOW THE CANOPY, 16'CLEARANCE TO PAVEMENT.9 ATMOSPHERIC VENT CAP10 PRESSURE/VACUUM VENT CAP11 EMERGENCY VENT FOR TANK SPACE12 EMERGENCY VENT FOR INTERSTITIAL SPACE13 SUMERSIBLE TURBINE PUMP14 REMOTE FILL LINE, FUEL FLOWS THROUGH OVERFILL PROTECTIONVALVE, REFER TO TANK DETAIL.15 DIESEL DOUBLE-WALLED ABOVEGROUND STORAGE TANK TO BEREPLACED AS AN ADD-ALTERNATE.16 EMERGENCY SHUTOFF DEVICE RELOCATED TO BE A MINIMUM OF 20'AND A MAXIMUM OF 100' FROM THE DISPENSING EQUIPMENT. SECURETO 4'X4' CONCRETE POST.17 TIE IN NEW DOMESTIC COLD WATER AND COMPRESSED AIR PIPINGINTO EXISTING PIPES IN BETWEEN TWO ROLL UP DOORS.18 ROUTE NEW DOMESTIC COLD WATER AND COMPRESSED AIR PIPINGUNDERGROUND AROUND THE PROPOSED TANKS TO CONNECT TO NEWHOSE BIB (ZURN MODEL Z1341 OR EQUIVALENT) AND BRASSSLEEVE-TYPE QUICK CONNECT (WEATHERHEAD MODEL 27131613 OREQUIVALENT) ON NEW FUEL ISLAND. BOTH CONNECTIONS SHALL BEMOUNTED AT 36".19 CONTRACTOR TO LABEL CANOPY CLEARANCE HEIGHT ON THIS SIDE OFCANOPY.20 EXISTING FUEL ISLAND AND EQUIPMENT TO BE DEMOLISHED AFTERCOMPLETION OF NEW FUEL ISLAND.ELECTRICAL NOTES1.ELECTRICAL INSTALLATION SHALL COMPLY WITH NEC 2020.2.N.E.C. ARTICLE 514 CONDITIONS FOR HAZARDOUS AREAS AND FUEL DISPENSING FACILITIESAPPLY.3.PROVIDE EXPLOSION PROOF SEAL-OFFS IN ACCORDANCE WITH ARTICLES 514.3 AND 514.9(A) &(B) FOR ALL CONDUITS IN CLASS 1 HAZARDOUS LOCATIONS, INCLUDING LOW VOLTAGECONDUITS.4.CIRCUIT DISCONNECTS TO BE PROVIDED AS PER NEC 514.11(A) AND NEC 514.13.5.EXTERIOR EMERGENCY CONTROLS TO BE INSTALLED AS PER NEC 514.11(B). REFER TOKEYNOTE #16 FOR LOCATION.6.ALL UNDERGROUND ELECTRICAL CONDUIT TO BE SCHEDULE 40 PVC MAY BE USED EXCEPT FORTHE LAST 10' IN THE HAZARDOUS AREAS. PVC COATED GALVANIZED RIGID CONDUIT (GRC)SHALL BE INSTALLED FOR THE LAST 10' ON ALL SUMP PENETRATIONS, DISPENSER STUB-UPS,CANOPY COLUMN STUB-UPS AND BUILDING STUB-UPS AND TO BE BURIED AT MIN. 24".7.PROVIDE BONDING/GROUNDING OF ALL PIPING AND EQUIPMENT AS INDICATED ON THEELECTRICAL DRAWINGS.FUEL OIL DESIGN SCOPEPROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO COMPLETE INSTALLATION OF NEW FUELSTORAGE TANKS, PRODUCT PIPING, DISPENSERS, AND MISCELLANEOUS ACCESSORIES AS DETAILED INTHIS PLAN SET1.SET TANKS, ANCHOR NEW 10.5' ø 20,000 GALLON DOUBLE WALLED DIESEL, 10.5' ' 12,500 GALLONDOUBLE WALLED DIESEL, AND 10.5' Ø 12,000 GALLON DOUBLE WALLED UNLEADED STORAGETANKS. INSTALL NEW FILLS, VAPOR, VENT, TURBINE, GAUGE AND LEAK DETECTION EQUIPMENTAND STATIC GROUNDING CONNECTIONS.2.TANKS, PIPING, AND ALL PETROLEUM EQUIPMENT AND ACCESSORIES TO BE PROVIDED ANDINSTALLED BY CONTRACTOR UNLESS NOTED OTHERWISE.3.SET NEW DISPENSER PEDESTAL BOXES PER PLAN; INSTALL NEW SINGLE-WALL PIPING FROMNEW TANK STP'S ROUTED ABOVE NEW CANOPY, PENETRATE CANOPY, THEN ROUTED DOWN TOEACH PEDESTAL. PIPE NEW PEDESTAL BOXES TO RECEIVE NEW DISPENSERS AND TEST.4.INSTALL NEW CONDUITS AND WIRING FROM TANKS AND EACH DISPENSER LOCATION. CONNECTTO STP, DISPENSER, AND GAS EQUIPMENT CIRCUITS INSIDE BUILDING.5.INSTALL NEW TLS-4B TANK LEVEL GAUGES, ANNULAR SPACE SENSORS, WIRING, ANDCONNECTIONS.6.SET AND CONNECT THREE (3) NEW GASBOY FUEL DISPENSERS: TWIN NOZZLE, ONE-PRODUCTDISPENSERS. INSTALL NEW HOSES, NOZZLES, BREAKAWAYS. STARTUP, PURGE, AND CALIBRATE.7.EMERGENCY STOP DISCONNECTS TO BE INSTALLED AT BOLLARD INDICATED ON DRAWINGS.8.INSTALL NEW NFPA 30A 9.2.5.4 WARNING SIGNS: "NO SMOKING, STOP MOTOR" AT EACHDISPENSER.9.INSTALL NEW NFPA 5 LB 40 BC (MIN) ADA ACCSSIBLE FIRE EXTINGUISHER AT DISPENSER ISLAND.FIRE EXTINGUISHING SYSTEMS ARE REQUIRED TO BE INSPECTED AND TAGGED BY A LICENSEDFIRE EXTINGUISHER CONTRACTOR AND MAINTAINED YEARLY.10. NFPA SIGNAGE TO BE PROVIDED AND INSTALLED BY CONTRACTOR.LOCAL FIRE AUTHORITY NOTES1.ALL WORKMANSHIP, MATERIALS, EQUIPMENT, TESTING, AND INSPECTIONS RELATED TO THEFUEL OIL SYSTEM INSTALLATION AS DESCRIBED HERE-IN SHALL BE IN ACCORDANCE WITH:A.F.A.C. 62-762: ABOVEGROUND STORAGE TANK SYSTEMSB.NFPA 30:FLAMMABLE AND COMBUSTIBLE LIQUID CODEC.NFPA 30A:AUTOMOTIVE SERVICE STATION CODE2.PRIOR TO THE FINAL INSPECTION, APROVED PERMID DOCUMENTS PREPARED BY THECONTRACTOR MUST BE SUBMITTED TO THE LOCAL FIRE AUTHORITY'S OFFICE.201 N FRANKLIN STSUITE 1400TAMPA, FL 33602PHONE: 813.620.1460REGISTRY NO. 35106This document is an instrument of service preparedsolely for Kimley-Horn's client and for a particularpurpose. Any other use or reliance is without liability toKimley-Horn.ARCH/ENGR OF RECORDJEREMY DEMBOSKIDESIGNED BYJTDISSUE DATE3/23/2026DRAWN BYSRMAE PROJECT NUMBER145642003SHEET TITLEFUEL OIL NEW PLANDRAWING NO.P101(E)AST-1 91132(E)UST-1 9134(E)UST-2 910(TYP.)4(E)DISP-156DEF-1 710(TYP.)10(TYP.)1365 (E)DISP-214GENERAL NOTES:1.ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THEGENERAL EXTENT OF THE WORK. CONTRACTOR TO BERESPONSIBLE FOR COORDINATION WITH OTHERTRADES BEFORE INSTALLATION OF ALL PLUMBING ANDFUEL OIL SYSTEMS. PIPING LAYOUT SHOWN ONDRAWINGS IS FOR GENERAL ARRANGEMENT ONLY. ALLWORK TO BE COORDINATED WITH FIELD CONDITIONSAND OTHER TRADES INVOLVED AS REQUIRED. DO NOTSCALE DIMENSIONS FROM THIS DRAWING. ALLDIMENSIONS TO BE VERIFIED IN FIELD AS REQUIRED.2.CONTRACTOR SHALL PROVIDE ALL SUPPORTING ANDHANGING FITTINGS AND EQUIPMENT FOR PROPERINSTALLATION OF ALL PLUMBING AND FUEL OILSYSTEMS.3.CONTRACTOR TO COORDINATE AND VERIFY ALLCLEARANCES BEFORE START OF ANY WORK.KEYNOTES1 EXISTING 12,500 GALLON DIESEL UST TO BE REMOVED. DIMENSIONSARE APPROXIMATE.2 EXISTING 6,000 GALLON UNLEADED UST TO BE REMOVED. DIMENSIONSARE APPROXIMATE.3 EXISTING PUMP SUMP TO BE DEMOLISHED WITH UST.4 EXISTING SPILL BUCKET TO BE DEMOLISHED WITH UST.5 EXISTING DISPENSER TO BE DEMOLISHED.6 CANOPY COLUMN, REFER TO STRUCTURAL DRAWINGS.7 EXISTING DEF SYSTEM TO BE RELOCATED TO NEW FUEL ISLAND.8 EXISTING EMERGENCY FUEL SHUT OFF TO BE DEMOLISHED,REPLACED, AND RELOCATED. REFER TO NEW PLAN9 STORAGE TANKS SHALL BE REMOVED ACCORDING TO NFPA 30.21INCLUDING ALL LIQUIDS AND RESIDUES SHALL BE REMOVED; THETANK, APPURTENANCES, AND PIPING SHALL BE PURGED OF FLAMMALEVAPORS AND SHALL BE TESTED BY A COMBUSTIBLE GAS INDICATOR;ALL EXPOSED PIPING, GAUGING, AND TANK FIXTURES (OTHER THANTHE VENT) SHALL BE DISCONNECTED AND REMOVED; AND THE TANKSHALL BE COMPLETELY FILLED WITH AN INERT SOLID MATERIAL.10 ALL UNDERGROUND PIPING IS TO BE REMOVED AND DISPOSED OF.11 EXISTING 20,000 GALLON ABOVEGROUND STORAGE TANK TO BEREPLACED AS AN ADD-ALTERNATE.12 EXISTING VEEDER-ROOT CONTROL CONSOLE MODEL TLS-350 TO BEDEMOLISHED AND REPLACED WITH NEW SYSTEM.13 EXISTING FUELMASTER FUEL MANAGEMENT SYSTEM TO BEDEMOLISHED.14 EXISTING DOMESTIC WATER AND COMPRESSED AIR PIPING TO BEDEMOLISHED.201 N FRANKLIN STSUITE 1400TAMPA, FL 33602PHONE: 813.620.1460REGISTRY NO. 35106This document is an instrument of service preparedsolely for Kimley-Horn's client and for a particularpurpose. Any other use or reliance is without liability toKimley-Horn.DEMOLITION NOTES1.A PHASING PLAN MUST BE DEVELOPED SO THAT THE EXISTING FUELING FACILITY REMAINSOPERATIONAL UNTIL THE NEW FUELING FACILITY HAS BEEN CONSTRUCTED, COMMISSIONED,AND IS FULLY OPERATIONAL.2.COORDINATE WITH THE CLIENT PRIOR TO DEMOLISHING ANY FUEL TANK, PIPING, OR RELATEDELEMENTS. COORDINATE WITH THE CLIENT ON THE REMOVAL AND DISPOSAL OF THE EXISTINGGAUGING SYSTEMS AND OTHER AUTOMATING EQUIPMENT WITHIN 30 DAYS OFREMOVAL/DEMOLITION.3.DEFINITIONS:A.DEMOLISH: REMOVE IN ITS ENTIRETYB.SALVAGE: REMOVE AS INDICATED AND PROVIDE TO THE CLIENT. DOCUMENT THAT THEITEM HAS BEEN REMOVED.4.CONTRACTOR MUST PROVIDE EROSION CONTROL MEASURES PRIOR TO PERFORMING ANYDEMOLITION WORK.5.A HAZARDOUS MATERIALS SURVEY HAS NOT BEEN CONDUCTED AS PART OF THIS DESIGN.6.ASSUME EXISTING TANKS AND PIPING ARE PARTIALLY FULL OF PRODUCT AND RESIDUALPETROLEUM WASTE. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE REMOVAL,STORAGE, TRANSPORTATION, AND PROPER DISPOSAL OF REMAINING PRODUCT IN THE TANKSAND PIPING ONCE THEY ARE READY FOR DEMOLITION AND REMOVAL. GOOD PRODUCTREMAINING IN THE TANK MUST BE RETURNED TO THE CLIENT FOR REUSE. CONTRACTORMUST ASSUME RESPONSIBILITY FOR ANY RESIDUAL OIL, WATER, SLUDGE, OR UNACCEPTABLEPRODUCT AND MUST REMOVE, STORE, TRANSPORT, AND DISPOSED OF THIS WASTE INACCORDANCE WITH APPLICABLE REQUIREMENTS.TRANSPORTATION BLDGRM 700-10RM 700-10812NORTHDEMO PLAN11/8" = 1'-0"ARCH/ENGR OF RECORDJEREMY DEMBOSKIDESIGNED BYJTDISSUE DATE3/23/2026DRAWN BYSRMAE PROJECT NUMBER145642003SHEET TITLEFUEL OIL DEMO PLANDRAWING NO.PD102
- Commodity Codes
-
- NAICS 237120Oil and Gas Pipeline and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ELEVATOR MAINTENANCE ADJUSTME...
Advertisement Detail Department of Transportation Agency Decisions ELEVATOR MAINTENANCE ADJUSTMENT, REPAIR, AND REPLACEMENT
State Government of Florida
Bid Due: 10/11/2080
Addendum #2 Central Florida R...
Advertisement Detail Department of Transportation Informational Notice Addendum #2 Central Florida Rail Corridor
State Government of Florida
Bid Due: 11/12/2050