Request for Qualifications, Baggage Handling System Upgrade #26-44-1897
Project Information
- Bid Title
- Request for Qualifications, Baggage Handling System Upgrade #26-44-1897
- Issuing Agency
- Spokane International Airport
- Location
- Washington
- Published Date
- May 6, 2026
- Closing Date
- May 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
REQUEST FOR QUALIFICATIONSProfessional Engineering ServicesBAGGAGE HANDLING SYSTEM UPDATE, #26-44-1897Issue Date: May 6, 2026Response due: May 26, 2026 at 2:00 PMThe Spokane Airport Board (the “Board”) is requesting Statements of Qualifications (SOQ) fromqualified consulting firms or teams to provide professional engineering, design, and constructionmanagement/administration (CM/CA) services for the upgrade of the existing baggage handlingsystem (BHS) serving the Main Terminal at Spokane International Airport (SIA).The project will modernize the legacy BHS by upgrading control hardware and software systems,revising system programming, and implementing a user interface consistent with the recentlyupgraded system serving the C Concourse. The intent is to improve system reliability,maintainability, operational efficiency, and standardization across airport facilities.A. SCOPE OF WORKScope of Services Overview:The selected Consultant shall provide all labor, materials, coordination, and expertisenecessary to complete the services described herein, including but not limited toassessment, design, procurement support, construction administration, and systemcommissioning.1. Existing Conditions AssessmentThe Consultant shall: Conduct a detailed assessment of the existing Main Terminal BHS, including:o Control systems (PLC hardware, networks, I/O panels)o SCADA/HMI systems and user interfaceso Field devices and instrumentation Review available as-built drawings, control narratives, and historical maintenance data Evaluate system performance, reliability, and obsolescence risks Identify gaps relative to the upgraded C Concourse system Prepare Existing Conditions and Gap Analysis Report2. Basis of Design (BOD)The Consultant shall: Develop a Basis of Design document defining:o System performance requirementso Control system architecture standardso Hardware and software platformso User interface design standards aligned with C ConcoursePage 1 of 13Spokane International AirportRequest For QualificationsBaggage Handling System Update, #26-44-1897 Establish design criteria to ensure system standardization and scalability3. Design ServicesThe Consultant shall provide design services including: Control System Upgradeso Replacement or modernization of PLC hardware and associated componentso Network architecture design (industrial Ethernet, redundancy, cybersecurity)o Control panel design and layouts Software & Programmingo Development of control logic and programming standardso Migration or redevelopment of PLC programso Development of SCADA/HMI systems with standardized user interfaceo Integration with existing airport systems as required System Integrationo Ensure compatibility and interoperability with the C Concourse BHSo Coordinate with TSA screening systems and airport IT infrastructureo Develop communication protocols and data interfaces Design Deliverableso 30%, 60%, 90%, and Final (Issued for Construction) design packageso Drawings, specifications, and control narrativeso Cost estimates at each design phaseo Phasing and construction sequencing plans4. Procurement SupportThe Consultant shall: Assist the Board in preparing bid documents Support responses to bidder questions and issue addenda Evaluate bids and provide recommendations for award5. Construction Management / Administration (CM/CA)The Consultant shall provide CM/CA services including: Submittal and shop drawing review Responses to Requests for Information (RFIs) Site visits and progress monitoring Coordination with airport operations to minimize disruptions Review of contractor schedules and sequencing Change order evaluation and recommendations6. Testing & CommissioningThe Consultant shall: Develop and oversee a commissioning plan including:o Factory Acceptance Testing (FAT)o Site Acceptance Testing (SAT)Page 2 of 6Spokane International AirportRequest For QualificationsBaggage Handling System Update, #26-44-1897o Integrated system testing Verify system performance and compliance with design intent Coordinate system cutover to minimize operational impacts Provide commissioning reports and final acceptance documentation7. Training & DocumentationThe Consultant shall: Support development of operator and maintenance training programs Review and verify as-built documentation Ensure delivery of:o Operation & Maintenance manualso Final control system documentationo Software backups and licensing documentation8. Project ManagementThe Consultant shall: Provide a dedicated Project Manager as the primary point of contact Develop and maintain a project schedule Conduct regular coordination meetings Provide progress reports and budget tracking Identify risks and recommend mitigation strategies9. Coordination RequirementsThe Consultant shall coordinate with: Airport operations and maintenance staff TSA and security stakeholders Airlines and ground handling operators Ongoing or planned airport improvement projects10. Key Considerations Maintain continuous airport operations during implementation Minimize system downtime and passenger disruption Ensure consistency with the C Concourse BHS platform Prioritize maintainability, reliability, and lifecycle cost efficiency11. Deliverables Summary Existing Conditions & Gap Analysis Report Basis of Design (BOD) Design packages (30/60/90/Final) Cost estimates Bid support documentation Commissioning plan and reports Final as-built and O&M documentationPage 3 of 6Spokane International AirportRequest For QualificationsBaggage Handling System Update, #26-44-1897B. INFORMATIONAL MEETINGA MANDATORY informational virtual meeting is scheduled for 10:00 a.m. on Thursday, May 14,2026Join Teams Meeting Linkhttps://teams.microsoft.com/meet/234441994697259?p=bueBYnMtkfVi8CrrFAMeeting ID: 234 441 994 697 259 Passcode: Mr9KQ24GDial in by phone: 1-929-229-5351 Phone conference ID: 634 942 921#C. SUBMITTAL REQUIREMENTSPlease submit one (1) electronic copy, in searchable Adobe PDF format.email to: Margaret Merin, mmerin@spokaneairports.netsubject line RFQ: Baggage Handling System Update, #26-44-1897Upon receipt of the electronic submission, a receipt email will be issued confirming yoursubmission.Proposals delivered by hand, fax, or telephone or any postal carrier will not be accepted.Electronic submittal shall be limited to the requirements specified in the SOQ section D, andshall not include additional brochures, booklets or other sales materials that are notspecifically requested.1. ClarificationsAny questions or request for clarification must be received via email no later than: May18, 2026 and shall be directed to:Margaret Merin, mmerin@spokaneairports.netSubject line RFQ: Baggage Handling System Update, RFQ# 26-44-1897Information, clarifications or modifications will be provided in writing by the Airport andwill be communicated no later than May 20, 2026 via the Airport’s website at:http://business.spokaneairports.net/rfp.2. Related InformationFirms are advised to familiarize themselves with the Airport’s standard ProfessionalService Agreement (PSA) and are prepared to accept without modification the terms andconditions contained therein. The selected consultant will be expected to execute theAirport’s PSA. It is anticipated that a PSA will be awarded by the Board at its June 2026meeting.This Request for Qualifications (RFQ) and information regarding this RFQ are posted onthe Spokane Airports website.D. STATEMENT OF QUALIFICATIONS (SOQ)SOQs shall respond to the criteria listed below. SOQs should be clear and concise andformatted as outlined below to provide the Selection Committee with the following informationand allow for consistent evaluation of each submittal.Page 4 of 6Spokane International AirportRequest For QualificationsBaggage Handling System Update, #26-44-1897Transmittal LetterProvide a one-page transmittal letter which introduces the consulting firm and team.Discuss services offered, size of staff, and office location(s) of the consulting firm(s). Includethe point of contact information, including email and phone number of the firm respondingto the RFQ.Table of ContentsInclude an identification of the material by section and page number.Statement of QualificationsProvide no more than 15 double-sided pages describing the qualifications, experience, andcapabilities of the proposing firm and team in the order presented below. The transmittalletter, and table of contents will not be included in the page count.1. Project Organization and Staff Experience. Include the organizational structure that isproposed to implement the Project, identifying the primary point of contact, supportstaff, subconsultants, and location of office where most of the work of the primeconsultant will be completed. Include brief resumes of the key project personnelidentifying professional qualifications, experience, capabilities, and relevant projectseach have completed.2. Specific Relevant Projects. Include and describe projects of similar scope that theproposed key personnel and/or team have participated in and completed in the past five(5) years. Identify key personnel from the organizational chart.3. Project Understanding and Approach. Demonstrate an understanding and familiarity ofthis Project. Describe your approach to successfully completing the project, includingproject administration, planning and design considerations, and constructionmanagement and construction administration.4. References. Provide a list of three (3) references that have specific knowledge of relevantwork performed by the consultant.E. SOQ EVALUATION AND SELECTIONAll SOQs received will be evaluated and ranked based upon the responsiveness to the RFQ. Aminimum of two (2) firms may be selected for further evaluation and requested to participate inan interview as part of the selection process. Alternatively, the Airport may choose to select themost qualified firm or team directly following the evaluation of the submitted SOQs. Oneconsultant will be selected for negotiation of a PSA.The Board reserves the right to reject any and all SOQs, to waive any irregularities in the SOQsreceived, and to accept the SOQs deemed most advantageous to the best interest of the Board.All SOQs become the property of the Airport.Spokane International Airport is an Equal Opportunity Employer and federal contractor orsubcontractor. As such, the Airport and all tiers of its consultants will abide by the requirementsof 41 CFR 60-1.4(a), 41 CFR 60-300.5(a), 41 CFR 60-741.5(a) and Executive Order 13496 (29 CFRPart 471, Appendix A to Subpart A).Page 5 of 6
- Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
On-Call Graphic Design Services
Specification Number Type Due Date Time Due - Pacific Title and Solicitation Documents
City of Tacoma
Bid Due: 7/21/2026
Project: Engineering RFQ Ref. #: 20260615 Department: Lake Stevens Sewer District Type: RFQ
Sammamish Plateau Water
Bid Due: 7/10/2026