RFQ26006 - ETSU Pickleball Court Addedum 2
Project Information
- Bid Title
- RFQ26006 - ETSU Pickleball Court Addedum 2
- Issuing Agency
- East Tennessee State University
- Location
- Tennessee
- Published Date
- Mar 11, 2026
- Closing Date
- Mar 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- RFQ26006 - ETSU Pickleball Court Addedum 2
- Attachment Preview
-
RFQ 26006East Tennessee State UniversityMarch 11, 2026Addendum Two (2)RFQ 26006 Pickleball Courts – Questions and Answers1. Concrete/Sitework: No saw-cut control joint pattern, depth, timing, or spacing isspecified. Please provide requirements for saw-cut control joints in the court concreteslab, including: (a) joint spacing, (b) required depth (typically 1/4 of slab thickness), (c)timing after pour, and (d) whether joints are to be sealed. Spec §321613.16 – No referencefound | Sheet C2.0 – No saw cut details showna. Court saw cuts are to be as required by the surface coating manufacturer forlayout and detail.2. Court Surfacing: The court surfacing specification (§321823.59) is titled 'COURTSURFACING' but repeatedly references 'tennis court' throughout (e.g., 'repair andresurfacing of an acrylic tennis court playing system,' 'tennis court line markings perUSTA specification'). Since this is a pickleball project, please confirm: (a) All linemarkings shall be per USAPA rules for pickleball as stated in §321823.59 Part 1, 1.4.B.1,and (b) the USTA references in Part 3 are typographical errors and should read USAPA.Spec §321823.59, Part 1, 1.1.A & 1.4.B.1 & Part 3, 3.3.B.1.f, p.53–56a. Specification section 1.3.A: Revise to read: Submit manufacturer’s technical data,specifications, and application instructions for the pickleball playing surface system.b. See specification section 1.4.B identifying USAPA as the required standard.c. Specification section 3.1.D.1: Revise to read: Allow crack repair system to cureproperly before pickleball surface coats are applied.d. Specification section 3.3.B.1.f: Revise to read: Layout, mask and hand paint all tennis courtline markings per USAPA specification using 100% ACRYLIC LINE PAINT. Apply permanufacturer’s recommendations.3. Pickleball Equipment: Section 116833, Part 1, 1.4.B references a 'Windscreen Warranty:Minimum of three (3) years' but no windscreen product is called out in Part 2 Products,and no windscreen is shown on the drawings. Please clarify: (a) Is windscreen fencingincluded in this scope? (b) If so, what are the dimensions, color, and attachment method?(c) If not, should the windscreen warranty clause be disregarded? Spec §116833, Part 1,1.4.B, p.1 | Sheet C1.0 – Pickleball Court Plan | Sheet C2.0 – Typical Court Layouta. Disregard references to Windscreen. There is no windscreen as part of thisproject.4. Drainage: Storm pipes P1, P2, and P3 on Sheet C3.0 show connections to 'existing catchbasins' but do not identify the existing pipe material, size, or condition at the connectionpoints. Will ETSU provide as-built information on the existing storm system, or is thecontractor responsible for field verifying connection point conditions prior to bid? SheetC3.0 – Grading and Drainage Plan (Storm Pipes P1, P2, P3)a. See drawing C3.0 for existing information provided. Additional informationneeded should be field verified.RFQ 26006East Tennessee State UniversityMarch 11, 20265. Drainage: The trench drain spec calls out 'ACO S200K equivalent' polymer concrete withminimum Load Class E slotted grate. Are there any restrictions on grate style (slotted vs.mesh vs. heelguard) given this is an athletic surface where players will be running?Please confirm grate style and ADA heel-proof requirements, if applicable. Sheet C4.0 –Trench Drain Installation Detail (POWERDRAIN S200K Spec Clause) | Sheet C3.0a. No restrictions on grate style. Heelguard style is required.6. Schedule/Contract: No project schedule or substantial completion date is provided in thebid documents. Is there: (a) A required substantial completion date, (b) The required finalcompletion date, and (c) Whether liquidated damages apply and if so the daily rate. RFQ26006 – No completion date or schedule provided in documentsa. Award of the project is anticipated shortly after receipt of bids. Work is to becompleted within 120 calendar days of award. Liquidated damages in the amountof $100.00 per calendar day apply to this project.7. Schedule/Contract: The court surfacing spec requires a minimum 30-day concrete cureperiod before surfacing, plus a minimum 4-day cure before the court opens to play. Giventhe critical path implications, has ETSU established a construction sequencing plan? Is aphased approach required to keep any portion of the facility operational duringconstruction? Spec §321823.59, Part 3, 3.3.A.1 & 3.3.F, p.56–57 | RFQ p.3, Scope ofWorka. The Center for Physical Activity will remain open and accessible for the durationof the project. The courtyard will be closed to ETSU faculty/staff and studentsduring the project.8. Schedule/Contract: RFQ p.4 states that subcontracting requires prior written approvalfrom ETSU after award. Does this restriction apply to all subcontractors includingspecialty trades such as the certified court surfacing applicator, the Musco lightinginstaller, or the electrical subcontractor? If so, is ETSU willing to pre-approve qualifiedsubcontractors prior to bid so they can be named in the bid response? RFQ p.4(Subcontracting language) | Spec §321823.59, Part 1, 1.4.A, p.53 | Spec §265668a. Prior approval for the use of subcontractor’s is not required. Subcontractor’s donot require pre-qualification.9. Schedule/Contract: The RFQ instructs bidders to 'quote on each item separately andprovide unit prices.' However, only one Cost Sheet total line is provided with no line-itembreakdown form. Please provide a detailed cost breakdown form or confirm whether asingle lump-sum total price is acceptable, and if unit prices are required, identify whichspecific items require separate unit pricing. RFQ p.2 (Quote Instructions) | RFQ p.23 –Bid Cost Sheeta. Lump sum total price is acceptable. Unit prices are not required.10. Existing Fence: If it is deemed necessary to remove part of the brick fence surroundingthe work area, would it be acceptable to repair with a finished black metal gate instead ofrepairing with matching brick? RFQ p.7 & p.21RFQ 26006East Tennessee State UniversityMarch 11, 2026a. The addition of a gate is acceptable if needed. The material, style and finish areto match existing. The size and location of the gate is to be confirmed andapproved by ETSU prior to fabrication.11. Laydown and Staging Area: Will ETSU provide a laydown or staging area for thisproject? If so, where? Will we have the ability to control either of the parking areas orlawns that are adjacent to our work area through part or all of the duration of the project?A laydown and Staging area will be parking spaces along Nancy Dishner Lane, acrossfrom courtyard. Contractor is responsible for maintaining traffic access through this areafor the duration of the project. The contractor is required to maintain access to theGrounds Maintenance building and to the CPA throughout the course of the project.12. Parking: Is there a designated parking area for contractor staff and subcontractors near theBasler Center job site? Is a bulk or project-specific parking permit available forconstruction crews, or does each worker need an individual guest permit? Are deliveryand equipment vehicles subject to the same parking rules, and if so where should theystage? RFQ p.7 & p.21 — Section 14, Parkinga. Contractor parking is available in Lot 22. Contractors are required to obtainparking permits for vehicles through Parking Services.13. Concrete Vs. Asphalt: By the drawings and details, it appears that the finish surfaces areconcrete, but the court surfacing spec says "Surfacing system to be an exterior acrylicsurface system for application onto an asphalt pavement base." Later in Part 3 it says“Concrete Surface”. The drawings also mention asphalt surface thickness in the sitegrading notes. I see no spec section for asphalt. Is there asphalt in this scope of work?321823.59, Part 2, 2.1.A, 321823.59, Part 3, Sheet C2.0a. Clarification: the court system is a concrete installation as noted on drawingC2.0. Disregard all references to asphalt.14. Reference Instruction to bidders, Item number 2 states that ‘While manual submission ispreferred, electronic submission will be accepted via email to erwincg@etsu.edu.’ Pleaseconfirm as discussed manual submission is required. Electronic submission of bids is notacceptable.15. Please confirm construction time frame for this project, anticipated start date and numberof calendar days to completion.a. Refer to response to question 6.16. Please confirm construction time frame for this project, anticipated start date and numberof calendar days to completion.17. Please confirm construction time frame for this project, anticipated start date and numberof calendar days to completion.
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Document ID & Hyperlink: RFP 31865-00658 Event Start - Response Due: 06/26/2026 09/02/2026
State Government of Tennessee
Bid Due: 9/02/2026
Request for Qualifications: A...
Bid Title: Request for Qualifications: Administrative Services (Lead & Copper Rule Program) Category:
City of Pigeon Forge
Bid Due: 7/13/2026