Pump Station 35 Improvements
Project Information
- Bid Title
- Pump Station 35 Improvements
- Issuing Agency
- City of Seattle
- Location
- Washington
- Published Date
- Dec 10, 2024
- Closing Date
- Dec 18, 2024
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- PW#2024-019
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: PW#2024-019
Title: Pump Station 35 Improvements
Addenda: 2
Release Date: 11/13/2024
Due Date: 12/18/2024
OverviewPost InformationPosted At:Wed, Nov 13, 2024 7:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryProject Description:
This Project will remove and replace existing mechanical, electrical, and structural features at Pump Station (PS) 35. The Work will require bypassing of wastewater flow throughout construction. General items of work include, but are not limited to:
- Establishment of temporary sewer bypass.
- Installation of approximately 800 linear feet of cured-in-place pipe (CIPP) liner into an 8-inch-diameter cast iron sewer force main.
- Installation of new maintenance hole and connection to King County 42-inch-diameter existing sewer line; abandon existing connection.
- Replacement of existing electrical service cabinet, conduit, and conductors.
- Demolition of existing site features, structural elements, electrical elements, mechanical equipment and removal of lead-containing coatings.
- Installation of new structural elements including a new roof slab, interior partition wall, hatches, beams, gratings, and guardrails.
- Installation of new electrical service and power equipment, including variable frequency drive (VFD) motor starters and on-site generator.
- Installation of new mechanical equipment, including pumps, valves, process piping, HVAC (i.e. ventilation), and odor control.
- Installation of new instrumentation including a wastewater flow meter.
- Restoration of existing landscaping and site features.
- Post-construction testing and commissioning.
Engineer's Estimate: $2,993,000 (not including sales tax)
Project Location: The project location is addressed to 2734 NE 45th St; however the facility is located primarily on private property in the University Village shopping center in Northeast Seattle.
TimelineRelease Project Date:November 13, 2024Pre-Bid Site Inspection #1 (Mandatory for Bidders to attend at least 1 Pre-Bid Inspection):November 20, 2024, 1:00pmThe project location is addressed to 2734 NE 45th St; however the facility is located primarily on private property in the University Village shopping center in Northeast Seattle. Please meet at the Pump Station for the pre-bid site inspection.Pre-Bid Site Inspection #2 (Mandatory for Bidders to attend at least 1 Pre-Bid Meeting):November 21, 2024, 1:00pmThe project location is addressed to 2734 NE 45th St; however the facility is located primarily on private property in the University Village shopping center in Northeast Seattle. Please meet at the Pump Station for the pre-bid site inspection.Question Submission Deadline:December 5, 2024, 5:00pmBid Open Date:December 18, 2024, 2:00pm - Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID - SVC - Old Main Sewer Re...
Project: BID - SVC - Old Main Sewer Replacement - Skagit Valley College
State Government of Washington
Bid Due: 7/23/2026
BID - SVC - MV Campus - Aspha...
Project: BID - SVC - MV Campus - Asphalt Repair and Re-striping -
State Government of Washington
Bid Due: 7/09/2026