MHA EMERGENCY LIGHTING TOWER UPGRADE
Project Information
- Bid Title
- MHA EMERGENCY LIGHTING TOWER UPGRADE
- Issuing Agency
- Manhattan Housing Authority
- Location
- Kansas
- Published Date
- Apr 9, 2026
- Closing Date
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: MHA EMERGENCY LIGHTING TOWER UPGRADE
Category: Open RFP/RFQ Status: Open Description: OVERVIEW
1. Project background and description
Apartment Towers is a 12-story building located in Manhattan, KS. Built in 1973. The building is currently equipped with a central battery backup for all emergency lighting. The current system is at end of life and needs to be replaced. It’s approximately 25 years old and is currently an AC/DC invertor system using older incandescent light bulbs. The system has become unreliable, the cost of replacement bulbs and fixtures no longer being made have made this unit obsolete.
2. Project scope
We are requesting the replacement of the battery controller system and all required electrical components located in the penthouse above the 12 th floor. This system will require a minimum of 90-minute run time. We are also replacing all existing emergency light fixtures with new single, dual and tri-head LED style fixtures. There are approximately 7-8 light fixtures on each floor. Fixtures are in both stairwells 4 per floor and 3-4 in common hall areas on each floor. Finally, we would like to add 2 additional light fixtures on the first-floor circuit. These new fixtures will be installed in the foyer by elevators and one in the community room. We are looking to upgrade to something more efficient while using LED fixtures.
3. High-level requirements
The new inverter will likely have AC output, and we would like to use the existing wiring. When checking with the city engineer the current wire of 14awg is sufficient for what we intend to do. Work will be required to configure electrical connections on the invertor outputs as they go to an older DC-rated fuse box for the existing lighting circuits. I have reached out to the manufacturer and found a direct updated and current replacement. It will be listed below.
The new battery backup should include the ability to run approximately 105 5w LED fixtures.
· Updated controller model from EMERGI-LITE - 1-EIPS-3-SG-N-120-(10-04)-T-2YW
· 3.0KVA SINGLE PHASE UL924 INVERTER.
· 90 MINUTE BATTERY RUN TIME.
· 10 YEAR DESIGN LIFE BATTERIES.
· 120VAC SINGLE PHASE INPUT.
· 120VAC SINGLE PHASE OUTPUT.
· INPUT CIRCUIT BREAKER.
· OUTPUT BREAKER TRIP ALARM.
· STANDARD METERING & CONTROLS.
· Qty of 110 EF150D-LV dual head fixtures or similar.
· Qty of 5 EF150T-LV Tri-head fixtures or similar.
· Qty of 5 EF150-LV Single head Fixture or similar.
· 2 Year local warranty on all work, control equipment and light fixtures.
4. Deliverables
Manhattan Housing Authority Staff and tenants should be minimally affected by this upgrade. Available on-site working hours between 08:00 and 16:00 Monday – Friday. Current manufacturers’ lead times are around 6-8 weeks.
5. Affected parties
MHA Staff and Tenants could be affected if this project is not completed in a timely matter. MHA could also incur fines from the city of Manhattan if this project encounters delays.
6. Affected business processes or systems
No MHA business should be affected by this upgrade.
7. Specific exclusions from scope
All light fixture work will be performed in common public areas of the building, tenant units will not be affected and should not be entered at any time. Manhattan Housing Authority / Maintenance can issue access to the penthouse/workshop when needed for access.
8. Implementation plan
Project may require some electrical pre-work before controller and cabinet can be exchanged and should be performed before old lighting controller/cabinet is removed offline. Light fixtures should be replaced on a floor-by-floor basis once the new controller is ready to be installed and wired in. Fixture work can begin once the old controller is offline and removed. MHA will retain the old batteries
9. High-level timeline/schedule
We are looking for quotes as quickly as possible and would like to expedite the bidding process. We understand lead times will exist and we will plan accordingly. Our goal is to have this project completed within 60 days once inventory is received in.
Publication Date/Time: 4/1/2026 12:00 AM Closing Date/Time: Open Until Contracted Contact Person: Geoff Mamer mamer@mhaks.org
Aaron Estabrook estabrook@mhaks.org - Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
A-015649 Trembly White POV Pa...
Bid Date Status Type Project Title Stage City State 09/17/2026 Bidding Engineering *
Kansas Department of Administration
Bid Due: 9/17/2026
Event Name Highway Lighting - District 6 Business Unit Department of Transportation Event
State Government of Kansas
Bid Due: 9/24/2026