Q Street Stormwater Infiltration Pond

Project Information

Bid Title
Q Street Stormwater Infiltration Pond
Issuing Agency
Washougal city
Location
Washington
Published Date
Jul 23, 2025
Closing Date
Aug 19, 2025
Government Level
State & Local
Status
Closed
Ref. #
ST-2025-02
Original Source
Join to Access Full Details
Project Description


Project ID: ST-2025-02

Title: Q Street Stormwater Infiltration Pond

Addenda: 0

Release Date: 7/22/2025

Due Date: 8/19/2025

Post Information
Posted At:Tue, Jul 22, 2025 2:02 PMSealed Bid Process:NoPrivate Bid:No
Overview
Summary

Notice is hereby given that the City of Washougal is soliciting proposals from consultants to select a design consultant for professional services on the Q Street Stormwater Infiltration Pond Project.

Key components of the project include:

  • Installation of a new manhole at the intersection of Q Street and 39th Street.
  • New stormwater piping to redirect runoff westward to the infiltration pond and eastward to the existing manhole at W Street and 37th Street.
  • Installation of two proprietary pre-treatment units on W Street to remove total suspended solids (TSS) and protect the infiltration capacity of the pond.
  • Regrading and replanting of the infiltration facility, including replacement of compacted topsoil if necessary, to restore and enhance infiltration performance.

The upgraded infiltration pond will provide both flow control and water quality treatment. By combining pre-treatment with infiltration into native soils, the facility will meet phosphorus, enhanced, and basic treatment performance standards. It is expected to treat and detain runoff from approximately 20 of the 22 acres during a 100-year storm event. Any excess runoff will overflow through the pond’s existing outlet to the stormwater system in W Street, ultimately discharging to Campen Creek.

Refer to Exhibit A for the Project Fact Sheet.

Background

A large infiltration pond is located on the north side of Q Street between 37th and 39th Streets within the Campen Creek Villa subdivision. Based on available as-built drawings and desktop analysis, the pond currently only captures and infiltrates stormwater from adjacent properties and streets within the subdivision. Stormwater from other areas is conveyed directly to Campen Creek without flow control or treatment.

Following an initial survey and engineering investigation to confirm the drainage boundaries, this project will redirect runoff from approximately 22 acres—assumed to be 70% impervious and 30% pervious—bounded by Q Street to the south, W Street to the north, and between 37th and 41st Streets, to the existing infiltration facility.

Timeline
Advertise for Proposals:
July 22, 2025
Question Submission Deadline:
August 11, 2025, 3:00pm
Question Response Deadline:
August 14, 2025, 3:00pm
Proposal Submission Deadline:
August 19, 2025, 2:00pm
Commodity Codes
  • NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

BID - SVC - Old Main Sewer Re...

Project: BID - SVC - Old Main Sewer Replacement - Skagit Valley College

State Government of Washington

Bid Due: 7/23/2026

BID - SVC - MV Campus - Aspha...

Project: BID - SVC - MV Campus - Asphalt Repair and Re-striping -

State Government of Washington

Bid Due: 7/09/2026