Ainger Creek Bridge #010062 - Emergency Repairs
Project Information
- Bid Title
- Ainger Creek Bridge #010062 - Emergency Repairs
- Issuing Agency
- Charlotte County
- Location
- Florida
- Published Date
- May 28, 2026
- Closing Date
- Jun 3, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-444
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
File No:
26-444
Description:
Ainger Creek Bridge #010062 - Emergency Repairs
Contact:
stacey.trowbridge@charlottecountyfl.gov
File number:
20260444
Due Date:6/3/2026 2:00:00 PMNotice:Package:Registered Vendors Notified:Presubmittal Sign-in:Tabulation:Recommendation:Addendum:Commodity Codes:
91300, 91313, 91366, 95900, 95935, 95990
- Attachment Preview
-
COUNTY OF CHARLOTTEPURCHASING DIVISIONCharlotte County Administration Center18500 Murdock CirclePort Charlotte, Florida 33948-1094(941) 743-1378TO:PROSPECTIVE BIDDERSDATE:MAY 28, 2026RE:ADDENDUM #1 - BID NO. 20260444 – AINGER CREEK BRIDGE #010062 - EMERGENCYREPAIRSBID OPENING DATE: 2:00 p.m. (EST) JUNE 3, 2026Bidders are hereby notified that this Addendum shall be made a part of the documents. The intent is to add to, modify, orclarify the documents. Should any of these items have an effect on price, such changes shall be included in the price bid.These items have the same force and effect as if contained in the original.ITEM 1:QUESTION/ANSWERQ1. On sheet B1-7 on the plans and SP-001 on page 19 of the contract documents, it shows removal andreplacement of rip rap, also placement of sod. It also shows removal of a 6” force water main, a traffic barrier,etc. However, there are no pay items for any of these items. Please clarify that we only bid on the line items of thebid. Please further clarify that there is no replacement of rip rap, sod, water main removal, traffic barrier removal.A1. Sheet B1-7 uses an existing bridge plan view as background to identify the repair scope for this project. The repairscope is identified under the bridge repair scope notes on Sheet B1-07 and throughout the Structures Plans. Removal andreplacement of rip rap, placement of sod, removal of a 6” force water main, and removal of traffic barrier are not part of thiscontract nor identified as part of the bridge repair scope.ITEM 2:REMOVE/REPLACEOn Page 19 in Special Provisions section, SP-01 INTENT, the first paragraph is hereby removed (strikethroughshows section removed).REMOVE:SP-01 INTENT: This project consists of CR 775 over Ainger Creek Bridge Repairs (Bridge #010062). The project includesvarious minor bridge repairs. The work also includes all other items of construction including, but not limited to, removal anddisposal of existing structures, site dewatering, excavation and fill, grading, sodding, and maintenance of traffic. The workspecified herein shall consist of furnishing all materials, equipment, labor and operations necessary to complete the workas indicated in the plans and specifications enclosed herein. All work included in the Bid shall be completed within thecontract time from the date specified in the Notice to Proceed. The construction shall include, but not be limited to,establishment and removal of Maintenance of Traffic measures, the provision of approved signs and markings.On Page 19 in Special Provisions section, SP-01 INTENT, the first paragraph is hereby replaced.REPLACE:SP-01 INTENT: This project consists of CR 775 over Ainger Creek Bridge Repairs (Bridge #010062). The project includesvarious minor bridge repairs. The work also includes all other items of construction including, but not limited to, removal anddisposal of existing structures and maintenance of traffic. The work specified herein shall consist of furnishing all materials,equipment, labor and operations necessary to complete the work as indicated in the plans and specifications enclosedherein. All work included in the Bid shall be completed within the contract time from the date specified in the Notice toProceed. The construction shall include, but not be limited to, establishment and removal of Maintenance of Trafficmeasures, the provision of approved signs and markings.This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260444.Bidders are required to acknowledge receipt of this addendum on their bid forms.Kimberly A. Corbett, C.P.M., CPPBSenior Division Manager-PurchasingKAC/st
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PBSO Aviation Structural & Mi...
Description: PBSO Aviation Structural & Misc Repairs (Re-bid) Department: Facilities Development & Operations
Palm Beach County
Bid Due: 7/30/2026
CABLING SYSTEMS, INSTALLATION...
Description: CABLING SYSTEMS, INSTALLATION AND REPAIR OF Department: Facilities Dev & Ops Buyer:
Palm Beach County
Bid Due: 3/30/2029