Rood Hall Bus Stop Site Improvements
Project Information
- Bid Title
- Rood Hall Bus Stop Site Improvements
- Issuing Agency
- City of Kalamazoo
- Location
- Michigan
- Published Date
- Jun 25, 2026
- Closing Date
- Jul 16, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Rood Hall Bus Stop Site Improvements
Closing date
July 16, 2026, 03:30 PM- Reference number 91244-053.0
- Status Open
- Summary Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.
91244-053.0-bid document (PDF, 4MB)
91244-053.0-Attachment A: Plans (PDF, 2MB)
91244-053.0-Attachment-B: Specifications (PDF, 816KB)
91244-053.0-Attachment C (PDF, 211KB)
91244-053.0-distribution list (PDF, 110KB)
SCOPE OF WORK
Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.
The project work includes the removal of the existing concrete bus pads, which currently house three bus shelters. Note that the bus shelters and the benches will be removed by others in advance of this construction project. The project includes grading the area to place a granular material subbase surface to prepare the area for concrete. The Contractor will place the foundations for the bus shelters and bike shelter. The Contractor will place the concrete pad to receive the bus and bike shelters. The Contractor will place soil erosion and sediment control as required and will restore the topsoil and establish turf in the disturbed areas.
Areas noted on Phase 2 will be included in the work if funding permits.
Phase 2 areas are shown for information only. Phase 2 areas may be added or may be a part of a future project. Phase 2 areas include similar work as noted above. Phase 2 work includes the removal of the turf and mulch surface. The Phase 2 project includes grading the area to place a granular material subbase surface to prepare the area for concrete. Place the Phase 2 area concrete sidewalk.
These Specifications
• Attachment A&B –
Western Michigan University
Rood Hall Bus Stop Site Improvements
KALAMAZOO, MICHIGAN 49008
SECTION 20, T01S, R11W
2101 WILBUR STREET
TIMELINE
The project must be completed by: 25 days after Notice to Proceed. If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238910Site Preparation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
General Information Document ID RFP-MARS-260000002468-1 Status Open Description WALTERS ROOF REPLACEMENT Department Marshall
State of Michigan
Bid Due: 9/03/2026
6898 RFP OE 131 Metallurgy La...
6898 RFP OE 131 Metallurgy Lab Renovation 6898 RFP - Instructions and Specifications
Washtenaw Community College
Bid Due: 9/23/2026