Early Childhood Exterior Remodel Addendum I
Project Information
- Bid Title
- Early Childhood Exterior Remodel Addendum I
- Issuing Agency
- Francis Howell School District
- Location
- Missouri
- Published Date
- Dec 5, 2025
- Closing Date
- Dec 12, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Early Childhood Exterior Remodel
Addendum I- Opened: November 12, 2025
- Mandatory Pre-Bid:Â December 1, 2025, at 10:00 a.m. at Early Childhood Meadows Parkway
- Closes: December 12, 2025, at 10:00 a.m.
- Attachment Preview
-
NOTICEFrancis Howell R-III School DistrictRequest for ProposalExterior Remodel of Early Childhood CentersISSUE DATE: November 12, 2025RETURN RESPONSE NO LATER THAN:December 12, 2025 @ 10:00 a.m., CSTPublic Bid Opening December 12, 2025 @ 10:00 a.m. CST801 Corporate Centre Drive, O’Fallon, MO 63368MANDATORY PRE–BID MEETING:December 1, 2025 @ 10:00 a.m. CSTA mandatory pre-bid meeting will be held at EC Meadows, 4810 Meadows Parkway, St. Charles, MO63304 during which we will visit each site to review project requirements. Attendance at this meeting isrequired for all bidders; no follow-up site visits will be allowed to minimize disruption to schooloperations.RETURN RESPONSE AND ADDENDA TO:Francis Howell R-III School DistrictATTN: Mr. Matthew Bollwerk, Purchasing Manager801 Corporate Centre DriveO’Fallon, MO 63368TABLE OF CONTENTSCertification FormSections:1) Introduction2) Project Overview3) Scope of Services4) Contractor Requirements5) Timeline for Process6) Selection Criteria7) Proposal Requirements8) Selection ProcessAttachments1) Company Identification2) References and Experience3) Federal Work Authorization Program(E-Verify) Addendum4) Federal work Authorization Program Affidavit5) Felony Conviction NotificationGeneral Terms and ConditionsFrancis Howell R-III School DistrictRequest for ProposalExterior Remodel of Early Childhood CentersCERTIFICATION FORMThe Francis Howell R-III School District will accept separate sealed proposals for the exterior remodel ofthe Districts Early Childhood Centers as described in the attached request. Qualified organizations(Respondents) are required to submit one (1) physical copy as described herein.PROPOSALS SHALL BE LABELED AND ADDRESSED AS FOLLOWS:SEALED PROPOSAL-EXTERIOR REMODEL OF EARLY CHILDHOOD CENTERSMr. Matthew Bollwerk, Purchasing ManagerFrancis Howell R-III School District801 Corporate Centre DriveO’Fallon, MO 63368The Respondent hereby declares understanding, agreement and certification of compliance to provide theitems and/or services, in accordance with all terms and conditions, requirements and specifications of theoriginal Request for Proposal (RFP), General Terms and Conditions, and as modified by any addendathereto. Respondent is required to complete, sign and return this form with the proposal.SIGNATURE REQUIREDAuthorized SignaturePrinted NameCompany NameMailing AddressCity, State, ZipMobile Phone #:DateTitleE-Mail AddressPage 2Section 1.0 - IntroductionThe Francis Howell School District is the top-rated school district in St. Charles County and 13th in thestate, as ranked by Niche.com. Encompassing more than 150 square miles in the southeast corner of St.Charles County, the District empowers students to be lifelong learners prepared for the future. Currentlythe District serves over 17,000 students and employs over 2,200 people, over 23 campuses. Additionaldetailed information about the District may be found at www.fhsdschools.orgSection 2.0 – Project OverviewThe Facilities and Operations Department of the Francis Howell School District (District) is requestingsealed proposals from qualified contractors to remodel the exterior of three (3) Early Childhood Centers.● Meadows Parkway Early Childhood● Central School Road Early Childhood● Hackmann Road Early ChildhoodThe purpose of this RFP is for the removal and replacement of vinyl siding, installation of water-resistanthouse wrap, fascia capping, guttering replacement, and site maintenance during the project. The Districtwill be looking for a proposal that has a price option for each center individually and as an entire project.Section 3.0 – Scope of Work1. Siding Replacement:● Remove and replace all vinyl siding.● New siding to be Double 5 profile in a standard color with a minimum thickness of .045”.● Install water-resistant house wrap before siding installation. All seams must be taped.● Cover all painted surfaces at the top of walls with house wrap and vertical siding.● All transitions to be flashed with corrosion-resistant flashing and sealed weather tight.2. Fascia Capping:● Cap all fascia using white aluminum coil stock.● Ensure installation is secure and weather-tight.3. Guttering and Downspouts:● Remove all existing guttering and downspouts.● Install new 7” white guttering with appropriate drainage solutions.4. Site Maintenance & Clean-Up:● Remove all debris from the site daily or place it in a contractor-provided dumpster.● Maintain a clean and professional job site.● Stock materials in a manner that does not interfere with school operations.● Park away from buildings to leave priority spots open for patrons.● Provide and maintain an on-site restroom facility for contractor use.Section 5.0 - Contractor Requirements● All workers must undergo a background check prior to working on site.● Contractor must adhere to prevailing wage requirements.● Contractor must be properly licensed and insured.Page 3Section 6.0 – Timeline for ProcessThe timeline listed below is the District’s estimation of time required to complete the process. All effortsshall be made to abide by this schedule; however, changes may occur if necessary.Request for Proposals issued November 12, 2025Pre-Bid Meeting December 1, 10:00 a.m. CSTBidder Questions due to District December 3, 2025Response to QuestionsDecember 4, 2025Proposals DueDecember 12, 10:00 a.m. CSTRecommendation to Board January 15, 2025Notice to Proceed January 16, 2025Section 7.0 – Proposal Evaluation CriteriaProposals will be evaluated by the District and designated staff. The following will serve as the basiccriteria for the selection.1. Offeror's demonstration of a complete understanding of the District’s requirements and needs.2. The qualifications and experience of the Company3. The Proposed timeline for project completion.4. Evaluation of past performance, references, interviews, presentations, etc.5. The total cost of the services offered to the DistrictSection 8.0 – Proposal Requirements1. The Certification Form must be completed and included.2. Proposed timeline for project completion.3. Cost breakdown by center and total project bid amount.4. The Company shall complete Attachment 1, Company Identification Form.5. The Company shall complete Attachment 2A and 2B, providing the District a listing of all similarprojects completed within the last five years. The Company shall additionally provide the District alisting of all public school clients that have discontinued service from the Company in the past fiveyears due to poor performance or non-performance.6. The Company shall complete Attachment 3, Federal Work Authorization Program Addendum.7. The Company shall complete Attachment 4, Federal Work Authorization Program Affidavit.8. The Company shall complete Attachment 5, Felony Conviction Notification.Page 49. The Company shall provide proof of Registration with the Missouri Secretary of State.Section 9.0 – Selection ProcessAfter evaluating all Proposals properly submitted, the District staff responsible for the evaluation willmake a recommendation for selection to the District’s Board of Education. The Board of Education shallmake the final selection of the Company that will provide the services. However, no contract shall beformed and the District shall not be bound to any selection until such time as a final, written contract withthe selected Company is approved by the Board of Education. The District reserves the right to negotiatethe contract terms with the Company that will be recommended to, or that is selected by, the Board ofEducation. The District further reserves the right to reject any and all Proposals and to waive any"informalities" in the Proposals received whenever such selection, rejection, or waiver is in its bestinterest. All Proposal documents become public record once a negotiated contract has been executed.Page 5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Jefferson City Readiness Cent...
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 7/28/2026
Coffeyville HS Natatorium Roo...
Coffeyville HS Natatorium Roof Replacement & Renovations 26-403 StatusAccepting Bids Prebid Date 7/1/26
Drexel Technologies
Bid Due: 7/15/2026