SAN-CR 213-0.67 Bridge Replacement
Project Information
- Bid Title
- SAN-CR 213-0.67 Bridge Replacement
- Issuing Agency
- Sandusky County Engineer's Office
- Location
- Ohio
- Published Date
- Dec 8, 2025
- Closing Date
- Dec 11, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project Name Opening Date Documents SAN-CR 213-0.67 Bridge Replacement Bid Opening at 10:30 am December 11, 2025 at Sandusky County Board of Commissioners Soil Boring Report
Plan Holder's List
Unit Price Contract (Excel Spreadsheet)
Contract Documents
Contract Plans
Legal Ad - Attachment Preview
-
STRUCTURE FOUNDATION EXPLORATIONPROPOSED BRIDGE REPLACEMENTCOUNTY ROAD 213 OVER GREEN CREEKGREEN CREEK TOWNSHIP, SANDUSKY COUNTY, OHIOSUBMITTED TO:SANDUSKY COUNTY ENGINEERAttention: Carlos A Baez Sr., P.E., P.S.2500 West State StreetFremont, Ohio 43420BMI Report No. 20002573-0625-394June 16, 2025©1419 Miami StreetToledo, OH 43605p. 419.691.4800f. 419.691.4805TOLEDO ENGINEERING SERVICES1419 Miami StreetToledo, Ohio 43605P. 419.691.4800 F. 419.691.4805www.bowser-morner.comJune 16, 2025Sandusky County EngineerAttention: Carlos A. Baez Sr., P.E., P.S.2500 West State StreetFremont, Ohio 43420Dear Mr. Baez:Re: Structure Foundation ExplorationProposed Bridge ReplacementCounty Road 213 over Green CreekGreen Creek Township, Sandusky County, OhioReport No. 20002573-0625-394Report Consists of 31 PagesBowser-Morner, Inc. (BMI) has completed the authorized subsurface exploration and laboratory testingfor the above- referenced project.The purpose of this exploration was to evaluate the subsurface conditions beneath the proposed bridgereplacement along County Road 213 over Green Creek. The attached report briefly reviews ourexploration procedures, describes existing site and subsurface conditions, and presents our laboratoryresults.For your convenience, soil samples are normally retained in our laboratory for a period of 60 days beforethey are discarded. To view the samples or arrange for longer storage of samples, please contact us.We have enjoyed working with you on this project and are prepared to assist you at any time. Pleasecontact us if you have questions about this report or if we may be of further service.Respectfully submitted,BOWSER-MORNER, INC.Ahmad K. Rashid, P.E.Chief Geotechnical EngineerManager, Toledo Engineering andEnvironmental ServicesAKR:kkoDistribution: Client (via email: CBaez@sanduskycountyoh.gov)DGL Consulting Engineers, LLC, Attn.: Jeffrey Yoder, PE, CPESC (via email: JYoder@dgl-ltd.com)Civil & GeotechnicalEngineeringEnvironmentalConsultingConstruction QA/QC andSpecial InspectionsAnalytical, Construction Materialsand Geotechnical LaboratoriesDAYTON, OH • TOLEDO, OH • SPRINGFIELD, ILGUIDELINES FOR THE USE OF THIS REPORT& MANDATORY INFORMATIONThis BMI geotechnical report has been prepared for the exclusive use of the Sandusky CountyEngineer for use in connection with the planned proposed bridge replacement along CountyRoad 213 over Green Creek in Green Creek Township, Sandusky County, Ohio. The data andfindings contained within this report are intended to: Aid the client in evaluating the feasibility of developing this site for the intended project, Provide the design engineer information that will make specific recommendationsconcerning foundation support for the new bridge abutments.This report is not a construction document. Although there is information within this reportthat may assist experienced contractors and engineers in identifying risks and constructionissues that may develop over the course of this project, our scope of services did not include adetailed review of potential constructability concerns.Because this report was very likely prepared before structure orientations, grades, loads andother features have been finalized, it is strongly recommended that BMI be retained to reviewfinal design documents prior to the start of construction when potential weather impacts anddesign requirements can be fully understood and addressed.All reports remain the confidential property of BMI no publication or distribution of any portionof this report may be made without our express written consent, except as authorized bycontract. Results contained in this report are reflective only of the items calibrated or tested.Unless otherwise agreed, samples or specimens will be discarded or returned at BMI's discretion.AASHTO/ISO 17025 accreditation applies only to the parameters included in BMI's current scopeof accreditation.BMI Report No. 20002573-0625-394-i-TABLE OF CONTENTSITEMPAGE NO.GUIDELINES FOR THE USE OF THIS REPORT & MANDATORY INFORMATION............................ iTABLE OF CONTENTS ............................................................................................................ ii1.0 EXECUTIVE SUMMARY ................................................................................................. 11.1 Soil Profile ................................................................................................... 11.2 Groundwater Observations .......................................................................... 11.3 Foundations................................................................................................. 12.0 INTRODUCTION ........................................................................................................... 23.0 GEOLOGY AND OBSERVATIONS OF THE PROJECT .......................................................... 23.1 General Geology and Hydrology ................................................................... 23.2 Field and Office Reconnaissance................................................................... 24.0 EXPLORATION.............................................................................................................. 34.1 Field Exploration .......................................................................................... 34.2 Laboratory Testing ....................................................................................... 45.0 FINDINGS..................................................................................................................... 45.1 Soil Profile ................................................................................................... 45.2 Groundwater Observations .......................................................................... 56.0 ANALYSES AND RECOMMENDATIONS........................................................................... 56.1 Foundations................................................................................................. 66.2 Groundwater Control ................................................................................... 66.3 Slopes and Temporary Excavation ................................................................ 77.0 QUALIFICATIONS.......................................................................................................... 7TABLE OF CONTENTSBMI Report No. 20002573-0625-394-ii-TABLE OF CONTENTS (continued)ITEMAppendix AAppendix BAppendix CBoring Location PlanBoring LogsLaboratory Test DataPAGE NO.A-1B-1 to B-2C-1 to C-4TABLE OF CONTENTSBMI Report No. 20002573-0625-394
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Y1AB--Stabilize/Improve Build...
Follow Y1AB--Stabilize/Improve Building 120 - 552-21-102 Active Contract Opportunity Notice ID 36C25026B0033_1 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/15/2026
Westshore e-Sports Center Ren...
Issued: Jun. 22, 2026 Item Specifications: REQUEST FOR PROPOSAL Westshore e-Sports Center Renovations
Cuyahoga Community College
Bid Due: 7/14/2026