COMMUNITY BEAUTIFICATION AND CLEANUP ADDENDUM 1
Project Information
- Bid Title
- COMMUNITY BEAUTIFICATION AND CLEANUP ADDENDUM 1
- Issuing Agency
- Corcoran city
- Location
- California
- Published Date
- Sep 12, 2025
- Closing Date
- Jan 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
PUBLIC NOTICE FINAL COMMUNITY BEAUTIFICATION AND CLEANUP 09/16/25 Specifications Plans ADDENDUM NUMBER 1 - Attachment Preview
-
ADDENDUM NUMBER 1FOR THECITY OF CORCORANCOMMUNITY BEAUTIFICATION & CLEANUPAugust 10, 2025OWNER:City of Corcoran832 Whitley AvenueCorcoran, CA 93212(559) 992-2151PREPARED BY:A&M Consulting Engineers220 N Locust StreetVisalia, CA 93291(559) 429-4747ADDENDUM NUMBER 1The following additions, deletions or modifications shall become part of the ContractDocuments for the City of Corcoran Community Beautification & Cleanup project:REVISIONS TO SPECIFICATIONS:ITEM NO. 1 BID SCHEDULE• Pages 16 - 17, “Copy of Engineer’s Estimate” has been revised to remove Bid Item 7Construction Staking which is a duplicate of Bid Item 4, and renumber the bid items.• Pages 69-70, “Bid Schedule” has been revised to remove Bid Item 7 ConstructionStaking which is a duplicate of Bid Item 4, and renumber the bid items.• Pages 74-76, “Bid Item Descriptions” has been revised to remove Bid Item 7 description,which is a duplicate of Bid Item 4, and renumber the bid items.ITEM NO. 2 BID BOOK COVER• Page 65, “Bid Book” has been revised with bid opening date of September 16, 2025.ITEM NO. 3 PREVAILING WAGE RATES• The California wage rates that are in effect for this project are Index 2025-1, generalprevailing wage determinations effective February 22, 2025 which can be found on theState of California Department of Industrial Relations website:https://www.dir.ca.gov/oprl/2025-1/PWD/index.htmPlease replace the pages with the revised pages attached to this Addendum Number 1.CONTRACTOR QUESTIONS:Q1: Please clarify how the woodcrete rail system and CMU pilasters interconnect. Will thewoodcrete rail system terminate on its own post adjacent to the CMU pilaster or will it terminateinto the cmu pilaster?A1: The woodcrete rail system will terminate on its own post adjacent to the CMU pilaster.Please see reference photo below, from Corcoran’s Gateway Park.--Q2: What is the engineer’s estimate?A2: The engineer's estimate is $1,300,000.--Q3: Is there a landscape maintenance or plant establishment period for this project?A3: Yes, the landscape shall be maintained during progress of the work, the one-yearmaintenance period and until final acceptance of the work. Please refer to Page 47 of theSpecifications under 10-1.28 Landscaping, A. Maintenance.--Q4: Please confirm retention will be 5% in accordance with Public Contract Code 7201.A4: Retention shall be 5%.--Q5: Page 65 of the Specifications shows the bid date as August 26, 2025. Please correct toSeptember 16, 2025.A5: Page 65 has been revised and attached to this Addendum.--Q6: Please advise as to whether or not the standard ACORD forms will be acceptable to Ownerin lieu of the insurance certificates provided in the Exhibits 1, 2, 3 and 11.A6: Yes, standard ACORD forms will be accepted with the City of Corcoran listed as AdditionalInsureds.--Q7: Bid Items 4 and 7 are both labeled “Construction Staking.” Is this a clerical error?A7: Yes, Bid Item 7 is a duplicate and has been removed. Please see changes to specificationsindicated above and the revised pages, attached.--Q8: Section 10-1.16 of the specifications state in bold, “Asphalt must be loaded into the paverwith a material transfer vehicle (pick-up machine). Loading hot mix asphalt straight into thehopper of the paver will not be permitted.” Considering the majority of asphalt paving on thisproject is plug paving against the gutter pan and minor intersection paving, would the Ownerconsider striking this requirement from the specifications?A8: Yes, this method will not be required due to most asphalt work being minor paving andpavement patches.--Q9: Refer to detail 2 on sheet no. 17; it indicates placing planting soil or amending existing soilper specification. However, the planting soil is not shown in the specification. Please clarify thetype of planting soil: imported soil or on-site soil? Also provide an installation depth for biddingpurposes.A9: On-site soil shall be amended for planting purposes, based on the soils report provided bythe contractor. Please refer to Specifications Section 10-1.28 Landscaping, B. Soils report. Depthof planting soil will vary by plant and tree and shall match the depth of the rootball.--Q10: Section 10-1.27.M & the irrigation legend on sheet no. 23 both show the irrigationcontroller is a battery-operated control controller model #TBOS-BT4LT, which is usuallyinstalled within an irrigation valve box. However, section 10-1.27 M requires it to be installed ina stainless steel enclosure assembly unless noted on the drawing since the drawing does notprovide detail for these controllers. Please clarify if these controllers will be installed in valveboxes or in controller assemblies for bidding purposes.A10: The controllers shall be installed in irrigation valve boxes.--Q11: Per section 10-1.27/T, the bubbler for trees is model RZWS-10-CV. However, Sheet 23shows model RZWS-18-CV. Please clarify.A11: The model for the bubblers for trees shall be RZWS-18-CV.--Q12: Clarify the type of irrigation system: domestic or reclaimed?A12: Domestic.--Q13: Refer to irrigation plan sheet no. 24; a callout indicates that the contractor shall hot tapexisting waterline for the proposed water meter installation. Clarify the size & type and depth ofthe water main.A13: Per our records, the 10” water main at location 1, west of Pickerell Ave is Asbestos-Cement and the 8” water main at location 2, east of Pickerell Ave is C900. Exact depth of thewater mains is unknown.--Q14: For bidding purposes, please provide the associated fees as applicable/needed for the watermeter installation, such as permit fee, inspection fee and the capacity fees.A14: Water meters shall be purchased from the City at a cost of $550 per water meter with a$100 connection fee. The encroachment permit shall be fee exempt since it is a city-ownedproject.--Q15: Provide the geotechnical soil report if available.A15: A geotechnical soil report for an adjacent project has been attached to this Addendum 1.--Q16: According to Caltrans standard specification 20-2.01B(7), the valve box and cover must beprecast concrete. However, section 10-1.27 W shows a plastic valve box. Please clarify.A16: Since the valve box & cover will be in concrete, it shall be precast concrete.--Q17: Can you please confirm if the Traffic Stripes are to be installed in Paint or Thermoplastic?Can you also please confirm if the Pavement Markings are to be installed in Paint orThermoplastic?A17: Traffic striping and pavement markings shall be paint, 2-coats.--NOTE: One copy of this Addendum Number 1 shall be signed by the Contractor and mustbe submitted with the bid as acknowledgement of receipt and acceptance of this AddendumNumber 1.Prepared by: _____________________________Javier Andrade, P.E.A&M Consulting Engineers0_9_/_1_0_/_2_5___________DateAccepted by: _____________________________Contractor (Signature)__________________Date
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 561730Landscaping Services
- NAICS 562910Remediation Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
26-64023: Onsite/Offsite Oral...
26-64023: Onsite/Offsite Oral and Maxillofacial ServicesDetails Event ID 0000039639 Format/Type: Sell Event /
State Government of California
Bid Due: 7/14/2026
Behavioral Health Services Ac...
Project ID: Title: Behavioral Health Services Act (BHSA) Early Intervention Behavioral Health Services
Solano County
Bid Due: 7/24/2026